Case Number:ZON2021-00057 Case Status:Withdrawn Date Received:9/8/2021
Description:CONDITIONAL USE ADMINISTRATIVE PERMIT (C(a)) for a temporary interim commercial mass timber ("CMT") lumber mill located on land zoned as commercial forest 80 (CF 80). The interim CMT mill will operate as a small scale lumber mill with forest product processing on a repurposed gravel mine site, with accessory office, storage, and parking. The interim CMT mill will establish proof of concept for using CMT modules for mid rise and high rise construction, refine design and production techniques, and allow assembly of construction modules for a demonstration project to establish market position. The interim proposal will use the existing 3,500 square foot building, the existing on site 640 square foot office, and include a new separate tent structure up to 7,500 square feet located on top of the existing impervious surface. The noise generated will be minimal such as typical traffic noise levels of trucks and up to 20 employees, entering and exiting the site, during the hours of 7 AM to 7 PM. There is no smoke generated on site, a dust collection system will control sawdust, there are no fumes or odors anticipated, and there will be no vibrations of equipment outside of the workspace. Most operations will occur inside the existing buildings. There are no critical areas located on site and the parcel is surrounded by forestry and mining operations. This project is categorically exempt from SEPA for minor new construction of equal to or less than 12,000 square feet and fewer than 40 parking spaces under Washington Administrative Code (WAC) 197 11 800(1)(a)(i) through (iv) and Jefferson County Code (JCC) 18.40.750(1)(d) that identifies the size thresholds. Date Issued:
Applicant: DAHLGREN INDUSTRIAL Expiration Date:
Site Address:9866 HWY 104 Case Finaled:
Parcel No:821312001 Other Cases Parcel Data Map It Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: A Clock Interrupt
Date Completed:
Disposition:
Description: Additional Info Request-DRD
Date Completed:
Disposition:
Description: Ntc of App +14-APO-U
Date Completed:
Disposition:
Description: Ntc of App +14-Publish-U
Date Completed:
Disposition:
Description: Plan Check
Date Completed:
Disposition:
Description: RAP Review Complete-U
Date Completed:
Disposition:
Description: Consistency Review-U
Date Completed:
Disposition:
Description: Env. Sensitive Area Review-U
Date Completed:
Disposition:
Description: Stormwater Review-U
Date Completed:
Disposition:
Description: App Substantially Complete-U
Date Completed:
Disposition:
Description: Potable Water Approval Req
Date Completed:
Disposition:
Description: Septic Review Complete-U
Date Completed:
Disposition:
Description: Case Entered
Date Completed: 9/8/2021