Permit Case Summary

Case Number: Search Help

Case Number:ZON2006-00005 Case Status:Finaled Date Received:2/3/2006
Description:Fort Gate Road Water Line. With this project the PUD #1 will be meeting the terms of its contract with the Washington State Parks by extending the water line on the agreed upon easement to the South from the existing water tank to Fort Gate Road. At Fort Gate Road the water line will be extended approximately 1000 feet west to Reef Road. The water line is designed to provide public water within the PUD's approved service area in accordance with the State Dept. of Health requirements. The water line will be approximately 3000 LF of PVC C900 water line eight inches in diameter and end with a blow-off assembly instead of a filling station as previously proposed. An administrative conditional use permit is required. The project is categorically exempt from SEPA review under WAC 197-11-800(23)(b). Date Issued:6/1/2006
Applicant: JEFFERSON CO PUD #1 Expiration Date:6/1/2009 12:00:00 AM
Site Address:FLAGLER RD Case Finaled:8/21/2013
Parcel No:021174000 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 8/21/2013
Disposition: DONE
Description: Close Case: Project Complete
Date Completed: 8/21/2013
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 6/1/2006
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 5/3/2006
Disposition: DONE
Description: Ntc of App +14-Publish-U
Date Completed: 3/27/2006
Disposition: DONE
Description: Ntc of App +14-APO-U
Date Completed: 3/27/2006
Disposition: DONE
Description: Ntc of App +14-Publish-U
Date Completed: 3/6/2006
Disposition: DONE
Description: Ntc of App +14-APO-U
Date Completed: 3/6/2006
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 2/22/2006
Disposition: DONE
Description: Ntc of App +14-Publish-U
Date Completed: 2/16/2006
Disposition: DONE
Description: Ntc of App +14-APO-U
Date Completed: 2/16/2006
Disposition: DONE
Description: Case Entered
Date Completed: 2/9/2006
Disposition:
Description: Septic Review Complete-U
Date Completed: 6/1/2006
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 2/15/2006
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 6/1/2006
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 6/1/2006
Disposition: DONE
Description: Consistency Review-U
Date Completed: 6/1/2006
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 6/1/2006
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Custom Case Specific Condition
Wording 1. New utility distribution lines shall be placed underground wherever reasonable and practical. 2. Utilities and transportation facilities shall be installed in the same rights-of-way when the effect will be to reduce the adverse impacts on the physical environment. 3. It shall be the affirmative duty of the applicant who proposes a minor utility development to determine if any state or federal permits or licenses are necessary and then to obtain those permits or licenses at their own expense. 4. The applicant shall obtain a permit from the Jefferson County Department of Public Works to place water lines within County rights-of-way. 5. The applicant shall receive a Franchise Amendment from the Washington State Department of Transportation to place water lines within State rights-of-way. 6. Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit. 7. The applicant shall consult the area WDFW Eagle Biologist before construction and time construction to avoid disturbance of nesting Eagles. 8. Water lines shall be located a minimum of 10 feet from all onsite sewage system components. Where a water line and wastewater line cross, the water line shall be placed above the wastewater line a minimum of 18 inches. If this separation cannot be maintained and the water line is still above the wastewater line, the water line shall be cased. If the water line is below the wastewater line then both lines shall be cased. All casing shall meet the standards set forth in the DOE Criteria for Sewage Works. It is the responsibility of the applicant to locate any drainfields or wastewater lines that they will be coming into proximity with or crossing. 9. The applicant shall install water lines on the landward side of the roadway when within 200 feet of the shoreline OHWM whenever feasible. 10. The applicant shall implement the pollution and erosion control measures listed in Section 5.2 of the Aquatic Resources Impact Assessment prepared by Parametrix and date May 2006. 11. The applicant shall contact Public Works and schedule a pre-construction meeting and implement the Stormwater Pollution Prevention Plan as approved by Public Works. 12. The applicant shall immediately restore the installation sites to their per-project condition to the maximum extent possible. 13. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Waters of the state include but are not limited to waters in roadside ditches and storm drains. 14. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants. 15. Soil in stockpiles should be stabilized or protected with sediment-trapping measures to prevent soil loss. All exposed areas of final grade or areas that are not scheduled for work, whether at final grade or otherwise, shall not remain exposed and un-worked for more than two days, between October 1 and April 30. Between May 1 and September 30, no soils shall remain exposed and un-worked for more than 7 days. 16. Source control best management practices such as plastic covering, mulch, temporary seeding, and phased clearing (for example) should be used to control erosion during construction. More examples of effective source control Best Management Practices can be found in the Washington Department of Ecology's Stormwater Management Manual for Western Washington (2001). 17. During construction, all releases of oils, hydraulic f


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Custom Case Specific Finding
Wording Refer to the attached staff report dated June 1, 2006 for case specific findings.