Case Number | | PRE2022-00026
|
|
Description | | Installation of a below-ground biosolids storage tank within the MBR plant compound at Fort Flagler. The existing discharge line to the man-made sewage lagoon will be intercepted and rerouted to the tank. A suction line will be routed from the tank to the compound fence to provide a quick-connect fitting for pumper truck connection.
|
|
Last Name | |
|
|
Received Date | | 8/19/2022 10:56:52 AM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | CAM2022-00017
|
|
Description | | The staff of Washington State Parks & Recreation Commission proposes the installation of a below-ground biosolids storage tank within the MBR compound at Fort Flagler State Park. Review of the Jefferson County open data portal maps indicates that Fort Flagler State Park is within a SARPA & high risk SIPZ area. The intent of this request is to discuss the critical areas review permitting requirements for this proposal.
|
|
Last Name | | HAMER
|
|
Received Date | | 1/18/2022 8:07:17 AM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2020-00656
|
|
Description | | LIKE FOR LIKE DOOR & WINDOW REPLACEMENT, AND RE-SIDING.
|
|
Last Name | |
|
|
Received Date | | 12/15/2020 12:00:00 AM
|
|
Status | | S2
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
|
Case Number | | BLD2020-00039
|
|
Description | | REPAIR AND REMODEL OF BLD#9
CEDAR SIDING REPLACEMENT, GENERAL CARPENTRY, WINDOWS, DOORS & DECKS
|
|
Last Name | |
|
|
Received Date | | 1/24/2020 11:36:25 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2020-00038
|
|
Description | | REPAIR AND REMODEL OF BLD# 8
CEDAR SIDING REPLACEMENT, GENERAL CARPENTRY, WINDOWS, DOORS AND DECKS.
|
|
Last Name | |
|
|
Received Date | | 1/24/2020 11:22:05 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2020-00036
|
|
Description | | REPAIR AND REMODEL OF BLD#111
CEDAR SIDING REPLACEMENT, GENERAL CARPENTRY, WINDOWS, DOORS & DECKS
|
|
Last Name | |
|
|
Received Date | | 1/24/2020 11:09:38 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2020-00035
|
|
Description | | REPAIR AND REMODEL OF BLD# 5
CEDAR SIDING REPLACEMENT, GENERAL CARPENTRY- WINDOW, DOORS, AND DECKS.
|
|
Last Name | |
|
|
Received Date | | 1/24/2020 10:54:30 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2020-00034
|
|
Description | | REPAIR AND REMODEL OF BLD# 2
CEDAR SIDING REPLACEMENT, GENERAL CARPENTRY- WINDOW, DOORS, AND DECKS.
|
|
Last Name | |
|
|
Received Date | | 1/24/2020 10:38:09 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2020-00037
|
|
Description | | REPAIR AND REMODEL OF BLD# 111A
CEDAR SIDING REPLACEMENT, GENERAL CARPENTRY- WINDOW, DOORS, AND DECKS.
|
|
Last Name | |
|
|
Received Date | | 1/23/2020 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2020-00040
|
|
Description | | REPAIR AND REMODEL OF BLD# 13
CEDAR SIDING REPLACEMENT, GENERAL CARPENTRY- WINDOW, DOORS, AND DECKS.
|
|
Last Name | |
|
|
Received Date | | 1/23/2020 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2020-00041
|
|
Description | | REPAIR AND REMODEL OF BLD# 112
CEDAR SIDING REPLACEMENT, GENERAL CARPENTRY- WINDOW, DOORS, AND DECKS.
|
|
Last Name | |
|
|
Received Date | | 1/23/2020 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SOM2019-01014
|
|
Description | | Pump report only, no septic record on file
Vault 1-8
|
|
Last Name | |
|
|
Received Date | | 2/19/2019 11:04:01 AM
|
|
Status | | ANP
|
|
| | |
|
|
|
Case Number | | BLD2018-00553
|
|
Description | | RE-ROOF PROJECT FOR 16 BUILDINGS -
BUILDINGS ARE PRE-WWI - NON STRUCTURAL CHANGES- SAME FOR SAME
|
|
Last Name | |
|
|
Received Date | | 12/7/2018 10:14:17 AM
|
|
Status | | S2
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2018-00476
|
|
Description | | Raise tool house bldg and provide concrete foundation , replace deck, add ramp, ADA improvements in main building.
|
|
Last Name | | HO
|
|
Received Date | | 10/11/2018 11:44:55 AM
|
|
Status | | S2
|
|
| | |
|
|
Case Number | | BLD2018-00475
|
|
Description | | Provide ADA concrete ramp, replace existing deck, and provide new railings Building 9
|
|
Last Name | |
|
|
Received Date | | 10/11/2018 11:26:18 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2018-00473
|
|
Description | | Construct ADA parking lot with walkway, foot bridge, and misc site improvement. Building 6
|
|
Last Name | |
|
|
Received Date | | 10/11/2018 10:42:44 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2018-00472
|
|
Description | | Foundation, steps, skirting, fire escape ladder Buildings 1, 5, and 7
Shoreline exemption
|
|
Last Name | |
|
|
Received Date | | 10/11/2018 10:08:21 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2018-00474
|
|
Description | | Rebuild porch, decking, steps and railing, new skirting. Building 8
|
|
Last Name | | HO
|
|
Received Date | | 10/10/2018 10:55:57 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
|
Case Number | | CAM2016-00570
|
|
Description | | Questions regarding work restoring 16 world war 1 era buildings, are permits required?
is a Shoreline expemption possible? so they need a pre-application?
|
|
Last Name | | CONRECODE
|
|
Received Date | | 11/21/2016 8:08:11 AM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2016-00002
|
|
Description | | MOORING BUOY MAINTENANCE FOR 3 JEFFERSON COUNTY STATE PARKS.
FORT FLAGLER STATE PARK- 7 EXISTING BUOYS, FORT TOWNSEND 4 EXISTING BUOYS, MYSTERY BAY 7 EXISTING BUOYS.
WITH FLOOD DEVELOPMENT PERMIT.
|
|
Last Name | | PARKS AND RECREATION COMMISSION
|
|
Received Date | | 1/15/2016 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SEP2005-00440
See SOM case for current septic system activity.
|
|
Description | | Partial record NOT A PERMIT - this onsite sewage system serves Fort Flagler and is permitted by DOE.
this file contains only a partial record of information submitted to JCPH.
this record is not of a permit issued by Jefferson County, informational only.
|
|
Last Name | | STATE OF WASHINGTON PARKS
|
|
Received Date | | 2/24/2014 3:08:54 PM
|
|
Status | | N
|
|
| | |
|
|
Case Number | | BLD2013-00076
|
|
Description | | Pre-fab toilet, flushable (no vault)
|
|
Last Name | | STATE OF WASHINGTON PARKS
|
|
Received Date | | 3/6/2013 10:44:54 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2011-00006
|
|
Description | | HISTORICAL RESTORATION & REMODEL OF EXISTING FT FLAGLER HOSPITAL - WITHIN EXISTING FOOTPRINT
|
|
Last Name | | STATE OF WASHINGTON PARKS
|
|
Received Date | | 1/11/2011 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2010-00057
|
|
Description | | REPLACE SIDING & REPLACE 11 WINDOWS
|
|
Last Name | | STATE OF WASHINGTON PARKS
|
|
Received Date | | 3/3/2010 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2009-00008
|
|
Description | | FIRE ALARM SYSTEM FOR OPERATIONS BLDG - (BLD08-244)
|
|
Last Name | | STATE OF WASHINGTON - DNR
|
|
Received Date | | 1/13/2009 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2008-00267
|
|
Description | | RE-ROOF, FORT FLAGLER STATE PARK - NO MLA REQ'D
|
|
Last Name | | STATE OF WASHINGTON-NAT RESOUR
|
|
Received Date | | 6/17/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2008-00244
|
|
Description | | NEW OPERATIONS BLDG FOR MEMBRANE BIOREACTOR WASTEWATER
TREATMENT FACILITY, INCL AN U/G CONCRETE TANK
|
|
Last Name | | STATE OF WASHINGTON-NAT RESOUR
|
|
Received Date | | 6/5/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2008-00035
|
|
Description | | As part of the Governor's effort to protect and restore Puget Sound, Fort Flagler
State Park proposes to update their existing on-site sewer systems into one consolidated system utilizing a MBR (membrane bio-reactor) wastewater treatment plant. The proposal also involves the addition of electrical and water hook-ups to the existing campground RV sites, but will not increase the number of sites. This project requires a Shoreline Substantial Development permit for a Conditional Use permit and a Zoning Conditional Discretionary Use permit for a Minor Utility and will be processed under the Optional Consolidated Permit Processing JCC 18.40.030(2). Public notice and a public hearing are required. Washington State Parks has assumed environmental review Lead Agency status and issued a Determination of Non-significance for this proposal on March 5, 2008.
|
|
Last Name | | STATE OF WASHINGTON PARKS
|
|
Received Date | | 3/5/2008 12:00:00 AM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | PRE2007-00045
|
|
Description | | Upgrade sewage collection system and install MBR (membrane bio reactor) wastewater treatment plant near the existing sewage lagoons to treat park-generated sewage to an above standard quality for class of system.
|
|
Last Name | | STATE OF WASHINGTON-NAT RESOUR
|
|
Received Date | | 9/24/2007 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2006-00005
|
|
Description | | Fort Gate Road Water Line. With this project the PUD #1 will be meeting the terms of its contract with the Washington State Parks by extending the water line on the agreed upon easement to the South from the existing water tank to Fort Gate Road. At Fort Gate Road the water line will be extended approximately 1000 feet west to Reef Road. The water line is designed to provide public water within the PUD's approved service area in accordance with the State Dept. of Health requirements. The water line will be approximately 3000 LF of PVC C900 water line eight inches in diameter and end with a blow-off assembly instead of a filling station as previously proposed. An administrative conditional use permit is required. The project is categorically exempt from SEPA review under WAC 197-11-800(23)(b).
|
|
Last Name | | JEFFERSON CO PUD #1
|
|
Received Date | | 2/3/2006 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2005-00125
|
|
Description | | This permit for Replacement Water Tank Cancelled - Already applied for BLD04-300
|
|
Last Name | | FORT FLAGLER STATE PARK
|
|
Received Date | | 3/3/2005 12:00:00 AM
|
|
Status | | Canceled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2004-00557
|
|
Description | | 3000 GAL A/G HEATING OIL TANK
|
|
Last Name | | FORT FLAGLER STATE PARK
|
|
Received Date | | 9/1/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2004-00300
|
|
Description | | REPLACEMENT RESERVOIR FOR FORT FLAGLER
|
|
Last Name | | WASHINGTON STATE PARKS & RECREATION
|
|
Received Date | | 5/10/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2004-00030
|
|
Description | | Replace an existing water resevoir with a new 312,000 gallon reservoir. The new structure will be 30-feet in diameter and approximately 60-feet tall. The proposed replacement resevoir will be located in the south central area of the park, and will be sited adjacent to the existing reservoir, which will be abondoned. The applicant is required to obtain a conditional use permit for a major utility. In addition, the proposal exceeds the 35-foot height limitation imposed by the Jefferson County Unified Development Code (UDC). The applicant is also requesting a variance to deviate from the 35-foot height requirement. The impetus for constructing a 60-foot high reservoir is to provide adequate flow for fire suppression. The proposal has already been reviewed for compliance with the State Environmental Policy Act (SEPA). A FINAL Determination of Non-Significance was issued on March 9, 2004, with Washington State Parks acting as the lead agency. The proposal is required to undergo a Type III public hearing.
|
|
Last Name | | WASHINGTON STATE PARKS & REC
|
|
Received Date | | 5/10/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2004-00031
|
|
Description | | Replace an existing water resevoir with a new 312,000 gallon reservoir. The new structure will be 30-feet in diameter and approximately 60-feet tall. The proposed replacement resevoir will be located in the south central area of the park, and will be sited adjacent to the existing reservoir, which will be abondoned. The applicant is required to obtain a conditional use permit for a major utility. In addition, the proposal exceeds the 35-foot height limitation imposed by the Jefferson County Unified Development Code (UDC). The applicant is also requesting a variance to deviate from the 35-foot height requirement. The impetus for constructing a 60-foot high reservoir is to provide adequate flow for fire suppression. The proposal has already been reviewed for compliance with the State Environmental Policy Act (SEPA). A FINAL Determination of Non-Significance was issued on March 9, 2004, with Washington State Parks acting as the lead agency. The proposal is required to undergo a Type III public hearing.
|
|
Last Name | | WASHINGTON STATE PARKS & REC
|
|
Received Date | | 5/10/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON2004-00015
|
|
Description | | Replacement of Water and Sewer systems in Fort Flagler State Park. The project is divided into two (2) phases. Phase I consists of the following activity.
- WATER IMPROVEMENTS
- 2,500 feet of 6-inch water main connected to the existing submarine crossing at Kilisut Harbor.
- 4,900-feet of 10-inch water main to be connected to the main historic fort area.
- 3,160 feet of 4-inch to 10-inch water distribution mains.
- Water service connections to all the buildings, fire hydrants, meters, valves, and fittings that will serve the entire park and will be capable of meeting current fire flow demands.
SEWER IMPROVEMENTS
-5,000 feet of 8-inch gravity sewer mains.
- 2,000 feet of 4-inch and 6-inch sanitary side sewers.
- 23 manholes
- 3 grinder pump stations with a 2-inch diameter force mains.
In addition, the applicant will also be required to receive a shoreline exemption permit in accordance with the Jefferson County Shoreline Master Program. The applicant has submitted a stormwater plan, geotechnical report, and is undergoing review for the State Environmental Policy Act (SEPA). Washington State Parks has assumed the Lead Agency status and issued a preliminary threshold Determination of Non Significance. Phase I work will take place primarily in the existing road prism. The applicant shall be required to undergo a Type III review for FUTURE placement of the water reservoir. A Type III quasi-judicial hearing will be held and noticing will be sent upon receipt of the proposed reservoir application.
|
|
Last Name | | WA STATE PARKS & REC COMMISSION
|
|
Received Date | | 2/27/2004 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP2004-00003
|
|
Description | | Shoreline Exemption to replace the dilapidated water and sewer lines. A majority of the proposal is located outside of Shoreline jurisdiction. The replacement will utilize the existing road prism and not further encroach upon the shoreline. A geotechnical report was submitted in conjunctio with the proposal. In addition, SEPA was conducted for the proposal with Washington State Parks Department acting as the lead agency. In addition, a stormwater management plan was submitted in conjunction with the proposal. The application is being reviewed under Section 3.402(6) of the Jefferson County Shoreline Master Program.
|
|
Last Name | | WA STATE PARKS & REC COMMISSION
|
|
Received Date | | 2/27/2004 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD2004-00073
|
|
Description | | FIRE SPRINKLER INSTALLATION - NO MLA REQUIRED
FOR BUILDING NOS 107, 108, 109, 110
|
|
Last Name | | STATE OF WASHINGTON-NAT RESOUR
|
|
Received Date | | 2/9/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2004-00003
|
|
Description | | Water Distribution and Sewer Collection System Replacement Project
|
|
Last Name | | STATE OF WASHINGTON-NAT RESOUR
|
|
Received Date | | 1/20/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | CAR1998-00166
|
|
Description | | (2) Oil tank removals and new tank installation
|
|
Last Name | | WA ST PARKS & RECREATION
|
|
Received Date | | 6/17/1998 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD1998-00368
|
|
Description | | (2) Oil tank removals.
|
|
Last Name | | WA ST PARKS & RECREATION
|
|
Received Date | | 6/16/1998 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | BLD1998-00369
|
|
Description | | Oil tank installation.
|
|
Last Name | | WA ST PARKS & RECREATION
|
|
Received Date | | 6/16/1998 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | BLD1998-00370
|
|
Description | | Oil tank installation.
|
|
Last Name | | WA ST PARKS & RECREATION
|
|
Received Date | | 6/16/1998 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
|
Case Number | | BLD1993-00659
|
|
Description | | remove underground storage tanks
|
|
Last Name | | STATE OF WASHINGTON
|
|
Received Date | | 9/14/1993 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1993-00300
|
|
Description | | install above ground tank
|
|
Last Name | | WA ST PARKS & RECREATION
|
|
Received Date | | 5/11/1993 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1991-00014
|
|
Description | | PROPOSAL: replace powerline
|
|
Last Name | | US FISH & WILDLIFE SERVICE
|
|
Received Date | | 12/9/1991 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD1989-00041
|
|
Description | | addition to dining hall
|
|
Last Name | | STATE OF WASHINGTON
|
|
Received Date | | 5/24/1991 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | BLD1990-00089
|
|
Description | | remodeling bathrooms
|
|
Last Name | | FORT FLAGLER STATE PARK
|
|
Received Date | | 2/14/1990 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1988-00114
|
|
Description | | ADDITION - COMMERCIAL KITCHEN
|
|
Last Name | |
|
|
Received Date | | 3/22/1988 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1985-00069
|
|
Description | | WS PARKS BS127 DAY USE PICNIC/COOKING SHELTER
|
|
Last Name | | FORT FLAGLER STATE PARK
|
|
Received Date | | 1/8/1985 4:50:11 PM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP1983-10004
|
|
Description | | INSTALLATION OF AN ARTIFICIAL FISH HABITAT UNDER AND ADJACENT TO THE FISHING PIER
|
|
Last Name | | WA STATE PARKS AND RECREATION COMMI
|
|
Received Date | | 2/22/1983 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
|
Case Number | | BLD1980-00140
|
|
Description | | Comfort station-restrooms
|
|
Last Name | | FORT FLAGLER STATE PARK
|
|
Received Date | | 5/29/1980 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1979-00017
|
|
Description | | Renovate and consturct utility facilities at the Fort Flagler sewage lagoon.
|
|
Last Name | | HEISER E.P., CHIEF
|
|
Received Date | | 6/28/1979 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD1978-00243
|
|
Description | | 4 - Bldgs. Seattle Youth Symphony
|
|
Last Name | |
|
|
Received Date | | 3/14/1978 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|