Permit Case Summary

Case Number: Search Help

Case Number:XMP2000-00005 Case Status:Finaled Date Received:3/13/2000
Description:This three stage project has been initiated as a result of seasonal flooding that occurs over this section of highway. Stage one construction, raising the roadway from 0 to 4 feet, was completed in September 1995. Since then, the highway has settled as much as four feet. The current proposal is to again raise the elevation of the road from 0 to 4 feet. This will require removal and resetting of an exisitng guardrail and installation of an additional culvert. Date Issued:5/5/2000
Applicant: WA ST DOT Expiration Date:5/5/2001 12:00:00 AM
Site Address: STREET NAME Case Finaled:
Parcel No:000000220 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Miscellaneous Action
Date Completed: 12/31/2003
Disposition: DONE
Description: Close case
Date Completed: 12/18/2003
Disposition: DONE
Description: (F) Issue exemption
Date Completed: 5/5/2000
Disposition: DONE
Description: TYPE A Appeal Instrctns (F)
Date Completed:
Disposition:
Description: (F) XMP Application Notice +30
Date Completed: 3/24/2000
Disposition: DONE
Description: App Substantially Complete (F)
Date Completed: 3/24/2000
Disposition: DONE
Description: Pub Date in Leader-Ntc of Appl
Date Completed: 3/24/2000
Disposition: DONE
Description: Planner Review
Date Completed: 5/5/2000
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: FINDING: EXEMPTION SECTIONS
Wording The proposal is consistent with Exemptions Section 3.402(6) of the Jefferson-Port Townsend Shoreline Management Master Program.

Title: CUSTOM FINDING
Wording The original fill of this roadbed was done under Corps of Engineers Nationwide Permit 23 (ref. #95-4-00107). Off-site mitigation was also done at that time. As this fill will be placed on top of the previously permitted fill and no additional diversion will be needed, the Army Corps of Engineers representative has stated that no additional permit will be required.

Title: CUSTOM FINDING
Wording Department of Transportation issued a SEPA decision on April 7, 1995.

Title: APPROVAL ONLY FOR J-PTSMMP
Wording This approval pertains to Jefferson-Port Townsend Shoreline Management Master Program requirements only. The approval of any other agency with jurisdiction or any other required permits shall be obtained prior to undertaking the project.

Title: OTHER WORK/SEPARATE APPROVAL
Wording Work within the jurisdiction of the Shoreline Program other than as described above shall receive separate review from this office.

Title: NO FILL OR OTHER MATERIAL
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: CUSTOM CONDITION
Wording To meet requirements of the county Stormwater Management Ordinance, construction plans should include a Temporary Erosion and Sediment Control Plan. The plan shall be submitted to the Department of Community Development for review and approval prior to commencement of any land disturbing activity.