Permit Case Summary

Case Number: Search Help

Case Number:XMP1997-00028 Case Status: Date Received:5/28/1997
Description:1) Replace existing 24" CMP with 57 x 38" CMP to prevent flooding over road. 2) Temporary water turbidity may occur as water is returned to streambed through newly installed pipe. 3) Water flow will be damned upstream of installation with sandbags, and water pumped around worksite. 4) Waterpump intake hose will be screened to prevent fish from entering pump. 5) Every precaution will be taken to prevent petroleum spills from equipment necessary to remove and install pipe. 6) Culvert installation will meet fish passage design criteria. Date Issued:8/20/1997
Applicant: JEFFERSON COUNTY PUBLIC WORKS Expiration Date:8/20/1998 12:00:00 AM
Site Address: Case Finaled:
Parcel No:ADMIRALTYINLET Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: (F) Issue exemption
Date Completed: 8/20/1997
Disposition: F
Description: Site inspection
Date Completed: 3/7/1997
Disposition: P
Description: Planner Review
Date Completed: 8/20/1997
Disposition: F

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: FINDING: EXEMPTION SECTIONS
Wording The proposal is consistent with Exemptons Section 3.402(6), of the Jefferson-Port Townsend Shoreline Management Master Program.

Title: FINDING: HPA NUMBER
Wording A Hydraulic Project Approval was issued under Control Number 00-D0919-01.

Title: site inspection
Wording A site inspection was conducted by Permit Center staff in March, 1997.

Title: APPROVAL ONLY FOR J-PTSMMP
Wording This approval pertains to Jefferson-Port Townsend Shoreline Management Master Program requirements only. The approval of any other agency with jurisdiction or any other required permits shall be obtained prior to undertaking the project.

Title: OTHER WORK/SEPARATE APPROVAL
Wording Work within the jurisdiction of the Shoreline Program other than as described above shall receive separate review from this office.

Title: NO FILL OR OTHER MATERIAL
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: NOTIFICATION PRIOR TO BEGINNING
Wording The proponent shall notify the Jefferson County Permit Center, (360) 379-4450, Development Review Division 48 hours in advance prior to commencing construction in order to allow monitoring and ensure conformance with project conditions.