|
Case Number | | SDP2007-00081
|
|
Description | | Mooring Buoy for Research Purposes Only
|
|
Last Name | | MOBILISA
|
|
Received Date | | 11/28/2007 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2004-00042
|
|
Description | | SHORELINE EXEMPTION to replace concrete anchors with helix anchors systems for 31 mooring buoys located in state parks, which include Fort Worden, Fort Flagler, Mystery Bay, Old Fort Townsend, and Shine Tidelands. These state parks are located in the following water bodies: Admiralty inlet, Kilisut Harbor, Port Townsend Bay, Bywater Bay, Hood Canal, and Puget Sound.
|
|
Last Name | | WA STATE PARKS AND RECREATION
|
|
Received Date | | 8/23/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2000-10014
|
|
Description | | Expand the Port Ludlow Marina by adding 100 new slips for 36 to 60 foot vessels, adjacent sidetie areas for vessels over 60 feet in length, and amenities such as dinghy floats and an expanded kayak float. The proposed expansion occurs to the west and south of the existing Marina, connected to the C, D, and E dock system. The proposed layout includes extension of the D and E lateral systems and a new F lateral system, with no changes to the A/B dock system. The design includes provisions to minimize environmental impacts as detailed in a submitted Biological Evaluation.
|
|
Last Name | | PORT LUDLOW ASSOC LLC
|
|
Received Date | | 8/4/2000 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2000-00016
|
|
Description | | Olympic Property Group, Inc. proposes to expand the existing 320 slip marina. The following are the key elements of the proposed project. Provide 100 slips in the range of 35 feet in length up to 60 feet in length. Provide additional areas for vessels larger than 60 feet to moor. Cost-effective solution utilizing existing infrastructure as feasible. Minimize environmental impacts. Minimize impact to existing tenants and facilities. Ability to phase the project. Work within the constraints of the neighboring Scott Property dock. Include amenities such as dinghy floats and an expanded kayak float.
|
|
Last Name | | OLYMPIC PROPERTY GROUP, INC.
|
|
Received Date | | 4/28/2000 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1998-00032
|
|
Description | | Construction of a rock wall to slow erosion along the shoreline bank. The structure will consist of two levels of rock wall terraced at the bank.Installation of 3' to 4' high basalt rock will be by track loader.
|
|
Last Name | | ASSOCIATION OF THE ADMIRALTY
|
|
Received Date | | 7/14/1998 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | PRE1998-00010
|
|
Description | |
|
|
Last Name | | MATTHAY
|
|
Received Date | | 2/10/1998 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | XMP1997-00068
|
|
Description | | Replace existing 12" culvert under Shore Drive with an 18" culvert. Replace 12" culvert under southerly shoulder of Boat Drive with an 18" culvert that crosses Boat Drive and discharges on the northerly side of Boat Drive. The discharge would be into a riprap bulkhead which would discipate the enegy and avoid beach erosion.
|
|
Last Name | | JEFFERSON COUNTY PUBLIC WORKS
|
|
Received Date | | 11/10/1997 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1997-00057
|
|
Description | | install rock bulkhead
|
|
Last Name | | ZIMMERMAN
|
|
Received Date | | 8/28/1997 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1997-00055
|
|
Description | | Repair an existing stairway which was damaged from upland bank erosion.
|
|
Last Name | | BINGHAM
|
|
Received Date | | 8/19/1997 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1997-00047
|
|
Description | | construction of rock wall about 5 to 6 feet in height constructed of large heavy stone.
|
|
Last Name | | SCOTT
|
|
Received Date | | 8/1/1997 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1997-00028
|
|
Description | | 1) Replace existing 24" CMP with 57 x 38" CMP to prevent flooding over road. 2) Temporary water turbidity may occur as water is returned to streambed through newly installed pipe. 3) Water flow will be damned upstream of installation with sandbags, and water pumped around worksite. 4) Waterpump intake hose will be screened to prevent fish from entering pump. 5) Every precaution will be taken to prevent petroleum spills from equipment necessary to remove and install pipe. 6) Culvert installation will meet fish passage design criteria.
|
|
Last Name | | JEFFERSON COUNTY PUBLIC WORKS
|
|
Received Date | | 5/28/1997 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1995-00046
|
|
Description | | MARROWSTONE ISLAND LIGHT HOUSE, INSIDE FT. FLAGLER STATE PARK ALONG DIKE/BREAKWATER THAT RUNS NORTH ALONG THE SHORE NORTHWEST OF LIGHT PEDESTAL.
|
|
Last Name | | NAT. BIOLOGICAL SERV.
|
|
Received Date | | 7/27/1995 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1994-00024
|
|
Description | | To recover rip-rap that has been washed and place it back on an existing bulkhead. Non-native angular rock, 6 inches and larger, to be recovered up to a distance of 50 feet waterward of the existing bulkhead.
|
|
Last Name | | JEFFERSON CO PUBLIC WORKS DEPT
|
|
Received Date | | 6/13/1994 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1992-00069
|
|
Description | | Replace existing underground power line with a new larger one - permit extension XMP91-00014
|
|
Last Name | | FISH AND WILDLIFE SERVICE
|
|
Received Date | | 10/19/1992 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1991-00014
|
|
Description | | PROPOSAL: replace powerline
|
|
Last Name | | US FISH & WILDLIFE SERVICE
|
|
Received Date | | 12/9/1991 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1990-00024
|
|
Description | | PROPOSAL: To conduct a hardshell clam enhancement study on fifteen 5 meter by 5 meter plots at an existing beach enahncement site. The study would involve seeding, rototilling, addition of crushed oyster shell, and placement of predator exclusion netting. Three sites would not be treated in order to provide statistical control.
|
|
Last Name | | WA ST DOF
|
|
Received Date | | 6/5/1990 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1988-00024
|
|
Description | | PROPOSAL: The proposal is to perform maintenance dredging of approximately 2,500 cubic yards of sediment from the northwest corner of the Port Ludlow marina by means of a mechanical "clam" device. The dreged matrial will be deposited at an upland site outside of the shoreline jurisdiction.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 5/19/1988 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1986-00048
|
|
Description | | Resurface SR 20 between Chimacum Rd and Port Townsend Ferry Landing
|
|
Last Name | | STATE OF WASHINGTON-DOT
|
|
Received Date | | 12/10/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1986-00042
|
|
Description | | Place six inches of fill, totalling 50 cubic yards on parts of Tideland A and B.
|
|
Last Name | | RICHARDSON
|
|
Received Date | | 10/16/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1984-00002
|
|
Description | | Enhance hard-shell clam habitat by deposting 20,000 cubic yards dredged material in area.
|
|
Last Name | | WA STATE DNR
|
|
Received Date | | 2/23/1984 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1983-10004
|
|
Description | | INSTALLATION OF AN ARTIFICIAL FISH HABITAT UNDER AND ADJACENT TO THE FISHING PIER
|
|
Last Name | | WA STATE PARKS AND RECREATION COMMI
|
|
Received Date | | 2/22/1983 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1979-10005
|
|
Description | | Install five public mooring bouys for recreational boats
|
|
Last Name | | KALA POINT DEVELOPMENT CO
|
|
Received Date | | 3/1/1979 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1976-10025
|
|
Description | | Deep water disposal site for dredge spoils to replace present interim site at 122° 42' 20" - 48° 08' 00".
|
|
Last Name | | WA STATE DEPT OF NATURAL RESOURCES
|
|
Received Date | | 6/4/1976 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | SDP1973-10061
|
|
Description | | Create artificial reef for fish habitat
|
|
Last Name | | WASHINGTON STATE PARKS &
|
|
Received Date | | 10/10/1973 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1972-10029
|
|
Description | | Material waste disposal site
|
|
Last Name | | DEPARTMENT OF NATURAL RESOURCES
|
|
Received Date | | 9/19/1972 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1981-10003
|
|
Description | | Drill approximately 20 exploratory holes
|
|
Last Name | | TRANS MOUNT OIL PIPE LINE CORPORATI
|
|
Received Date | |
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | XMP1974-00023
|
|
Description | | Clam harvest operations
|
|
Last Name | | WESTLEY
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|