Permit Case Summary

Case Number: Search Help

Case Number:UTL2013-00068 Case Status:Finaled Date Received:9/19/2013
Description:Effluent Line Crossing - N. Water St Date Issued:9/19/2013
Applicant:LARS THANEM Expiration Date:9/19/2014 12:00:00 AM
Site Address:64 N WATER ST Case Finaled:10/23/2013
Parcel No:989400704 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Final Inspection Approval
Date Completed: 10/23/2013
Disposition: DONE
Description: Issue Permit
Date Completed: 9/19/2013
Disposition: DONE
Description: Consistency Review-U
Date Completed: 9/19/2013
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 9/19/2013
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 9/19/2013
Disposition: DONE
Description: Case Entered
Date Completed: 9/19/2013
Disposition:
Description: App Substantially Complete-U
Date Completed: 9/19/2013
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: PERMIT ON SITE
Wording This permit must be located on site when any work encompassed by the permit is being performed. Failure to do so may result in suspension of all work.

Title: DEPTH 30"
Wording 30" is the minimum cover allowed over all utility lines placed across or parallel to the roadway, or across or within the ditch.

Title: RESPONSIBLE
Wording The applicant shall be responsible for the cost to repair any and all damage to the county roadway and rights-of-way, including the integrity of all survey monuments or boundary markers.

Title: PUSH DAMAGE
Wording If any damage to the roadway occurs as a result of a utility road push or bore, the Applicant shall contact Jefferson County Public Works at 360-385-9160 before proceeding with any repairs.

Title: TRENCHCUT
Wording Any push pit or utility trench shall be backfilled with imported gravel borrow per WSDOT Standard Spec 9-03.14(1) and mechanically compacted in 12 inch lifts to 95% density.

Title: WORKER/ROW
Wording The Applicant shall submit a Traffic Control Plan which shall follow the standards of the Manual on Uniform Traffic Control Devices (MUTCD) any time that workers are on the county right-of-way or equipment must enter onto the right-of-way.

Title: EFFLUENT LINE
Wording The effluent line shall be encased in a leak free conduit which shall extend outside of the roadway section.

Title: CUSTOM CONDITION
Wording Surface markers shall be installed on each side of the road, along the back of the right-of-way, indicating the location/depth of the effluent line.

Title: SHOULDER RESTORE
Wording Should any work occur within the shoulder area, the surface of the shoulder shall be finished with a minimum of 2" compacted crushed granite gravel meeting WSDOT Standard Spec 9-03.9(3)

Title: PRE-CON
Wording Applicant must give Jefferson County Public Works office (360-385-9160) a minimum of 7 working days notice prior to beginning work. An on-site pre-construction conference shall be scheduled by the applicant and will include Public Works and the contractor who will be performing the work. Prior to this meeting, any utility locate marks shall be done (Call 811 48 hours before you dig)

Title: FINAL INSPECTION
Wording The Applicant must contact the Public Works Department for a final inspection upon completion of the installation.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: P-PUSH UNDER ROAD
Wording The applicant may push under N. Water St. at mile post 0.08 right/left.