Case Number | | CAM2017-00545
|
|
Description | | Questions regarding the zoning 'urban commercial ' - existing plans to improve sewers
|
|
Last Name | | BOWERS
|
|
Received Date | | 9/28/2017 9:54:18 AM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SOM2013-01053
|
|
Description | | new septic installed under SEP13-00088. structures on 602 and 707, DF on 704
|
|
Last Name | | PANZER
|
|
Received Date | | 10/25/2013 1:32:13 PM
|
|
Status | | RCR
|
|
| | |
|
|
Case Number | | UTL2013-00068
|
|
Description | | Effluent Line Crossing - N. Water St
|
|
Last Name | | THANEM
|
|
Received Date | | 9/19/2013 8:20:15 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2013-00039
|
|
Description | | Shoreline exemption for new septic application (SEP13-00088) and flood development permit.
|
|
Last Name | | THANEM
|
|
Received Date | | 7/31/2013 2:34:06 PM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SEP2013-00088
See SOM case for current septic system activity.
|
|
Description | |
|
|
Last Name | | THANEM
|
|
Received Date | | 7/22/2013 10:51:03 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2013-00026
|
|
Description | | Shoreline Exemption for New Mooring Buoy #67 to be used for residential purposes only
|
|
Last Name | | THANEM
|
|
Received Date | | 5/14/2013 3:39:19 PM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2013-00024
|
|
Description | | Shoreline Exemption for replacement Mooring Buoy #69 for residential use only
|
|
Last Name | | THANEM
|
|
Received Date | | 5/14/2013 3:16:09 PM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2007-00029
|
|
Description | | Shoreline exemption to rebuild ramp and floats and flood development permit.
|
|
Last Name | | NEWELL
|
|
Received Date | | 4/16/2007 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | RAP2001-00264
|
|
Description | | Septic Line Crossing - Lower Hadlock Rd.
|
|
Last Name | | ARTHUR
|
|
Received Date | | 12/13/2001 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
|
|
Case Number | | SEP2000-00114
See SOM case for current septic system activity.
|
|
Description | | Expired & Archieved, on 9/3/13
Scanned on 6/22/07
|
|
Last Name | | ARTHUR
|
|
Received Date | | 5/15/2000 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | SEP2000-00117
See SOM case for current septic system activity.
|
|
Description | | Expired & Archieved, on 9/3/13
Scanned on 6/22/07
|
|
Last Name | | ARTHUR
|
|
Received Date | | 5/15/2000 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | XMP1994-00029
|
|
Description | | To place one 6'x 56' welded steel float with a 4'x 40' ramp hinged from an existing 126' pier. Also placement of 2 mooring buoys 200 ft off shore for fore & aft mooring of owner's vessel.
|
|
Last Name | | NEWELL
|
|
Received Date | | 7/18/1994 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1988-00047
|
|
Description | | PROPOSAL: The project is the construction of an 82 by 36 by 30 foot temporary pole and plastic sheet shelter to protect a wooden boat during maintenance and repair work. The site is located in Lower Hadlock on the waterfront side of Water Street, approximately 42 feet northwest of the warehouse at 330 Water Street. The shelter will be constructed six feet back from the ordinary high water.
|
|
Last Name | | NEWELL
|
|
Received Date | | 9/8/1988 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1988-00034
|
|
Description | | PROPOSAL: The proposal is to raise abalone spawn and juveniles in tanks as a preliminary step to commercial abalone aquaculture. The proposal will be carried out in an existing warehouse using artificial lighting. Approximately one gallon of sea water per minute will be circulated through the tanks by means of intake and outlet pipes attached to existing pilings that support the warehouse and an existing dock.
|
|
Last Name | | HARVEST
|
|
Received Date | | 6/23/1988 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP1975-10009
|
|
Description | | To repair pier and add to it one 74 foot long ramp with raising-lowering and mechanism at outer end of ramp, plus two 18 pile dolphins to hold barges in position while being unloaded.
|
|
Last Name | | COTTON
|
|
Received Date | | 5/5/1975 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1981-10005
|
|
Description | | Redevelop existing seafood processing facility in two phases.
|
|
Last Name | | LONGLINE SEAFOODS LTD
|
|
Received Date | |
|
|
Status | | Withdrawn
|
|
| | |
|