Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
7/17/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Plat RECORDED Status "F"
|
|
Date Completed:
|
| | |
12/22/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Assessor finl plat sgn off
|
|
Date Completed:
|
| | |
12/21/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
12/15/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DECISION APPROVAL (Status "A")
|
|
Date Completed:
|
| | |
12/15/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
12/15/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-U
|
|
Date Completed:
|
| | |
12/15/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-U
|
|
Date Completed:
|
| | |
11/15/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Det. of Completeness-UF
|
|
Date Completed:
|
| | |
10/10/2006
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
10/3/2006
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Date Assigned to Planner
|
|
Date Completed:
|
| | |
10/3/2006
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
11/14/2006
|
|
Disposition:
|
| | |
N/A
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
10/10/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
12/15/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
12/15/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
SITE INSPECTION COMPLETE
|
|
Date Completed:
|
| | |
10/3/2006
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
APPROVAL NOT A GUARANTEE
|
|
Wording
|
| | |
Approval of this Boundary Line Adjustment does not guarantee the approval of any future county permits and/or approvals.
|
|
|
Title:
|
| | |
NOTICE TO PUBLIC
|
|
Wording
|
| | |
The following notice shall be placed on the final survey mylar:
JEFFERSON COUNTY NOTICE TO PUBLIC
Current Jefferson County Geographic Information System (GIS) maps identify the presence of an Environmentally Sensitive Area (ESA) such as stream, wetland, flood, landslide hazard area, erosion, aquifer recharge area, SIPZ, fish and wildlife habitat, shoreline, etc., lying within and/or adjacent to the revised parcels encompassed by this Boundary Line Adjustment. Prior to any land disturbing activity or construction activity, applicant/owner shall contact the Jefferson County Department of Community Development regarding compliance for such ESA's. Approval of this Boundary Line Adjustment does not guarantee issuance of a building permit within said parcel(s). Such determination is dependent on approvals of water, septic, bulk and dimensional setbacks, and ESA requirements.
|
|
|
Title:
|
| | |
NOTICE TO PUBLIC
|
|
Wording
|
| | |
The following notice shall be placed on the final survey mylar:
JEFFERSON COUNTY NOTICE TO PUBLIC
This Boundary Line Adjustment does not guarantee that each resulting parcel has adequate soils to support on-site septic nor does this Boundary Line Adjustment guarantee that each resulting parcel is guaranteed a buildable area. Applications for septic and building permits will be reviewed at time of submittal of such application for consistency with current state and county codes and ordinances.
|
|
|
Title:
|
| | |
TAXES PAID
|
|
Wording
|
| | |
CONSISTENT WITH RCW 84.56.345 CURRENT YEAR AND ALL DELINQUENT PROPERTY TAXES SHALL BE PAID PRIOR TO RECORDING THE STATEMENT OF INTENT.
|
|
|
Title:
|
| | |
RECORDING
|
|
Wording
|
| | |
Consistent with JCC Title 18.35.080 (3), the applicant/surveyor is responsible for recording the Statement of Intent with the Jefferson County Auditor and referencing said statement of Intent AFN on the face of the survey.
|
|
|
Title:
|
| | |
FILED MYLAR
|
|
Wording
|
| | |
The survey mylar and applicable recording fee payable to the Jefferson County Auditor shall be submitted to the Department of Community Development for department signatures and recording of said mylar.
|
|
|
Title:
|
| | |
FILED SOI & ETA
|
|
Wording
|
| | |
An Excise Tax Affidavit will need to be completed for the Statement of Intent. An Excise Tax Affidavit is also required for every document that will be recorded such as Quit Claim Deeds or Statutory Warranty Deeds. It is the applicants' responsibility to file these instruments with Jefferson County Auditor in order to convey the ownership of the adjusted land.
|
|
|
Title:
|
| | |
NO EH REVIEW
|
|
Wording
|
| | |
The lots, parcels or tracts described within this Boundary Line Adjustment have not been evaluated for their suitability to support an on-site sewage system, no soils were evaluated on the lots. Sewage disposal systems have not been approved for the lots, parcels or tracts contained within the BLA. On-site sewage disposal system(s) shall meet design standards and regulatory requirements in effect at the time of application for a sewage disposal permit.
|
|
|
Title:
|
| | |
Slide Buffer-Native Vegetation
|
|
Wording
|
| | |
Landslide Hazard Areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, the Unified Development Code (UDC) Administrator shall require replanting with native vegetation. No alterations shall be made to the Landslide Hazard Area or its associated buffer without prior authorization by the UDC Administrator.
|
|
|
Title:
|
| | |
Permanent Landslide Boundary
|
|
Wording
|
| | |
The applicant shall permanently separate the boundary of the Landslide Hazard Area Buffer from the remainder of the subject property through installing logs, trees, a hedge row, or any other prominent physical marking approved by the UDC Administrator.
|
|
|
Title:
|
| | |
Aquifer Recharge Conditions (SFR)
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.
|
|
|
Title:
|
| | |
Seawater Intrusion Areas
|
|
Wording
|
| | |
To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite.
|
|
|
Title:
|
| | |
CONSISTENT WITH
|
|
Wording
|
| | |
The proposal complies with JCC Title 18.35.060.1(a) in that the proposal is to create more suitable building lots.
|
|
|
Title:
|
| | |
CONSISTENT WITH
|
|
Wording
|
| | |
Consistent with JCC Title 18.35.060.2(a), the proposal will not create an additional lot, tract, or parcel.
|
|
|
Title:
|
| | |
CONSISTENT WITH
|
|
Wording
|
| | |
Consistent with JCC Title 18.35.060.2(b), the proposal is not within a binding site plan.
|
|
|
Title:
|
| | |
CONSISTENT WITH
|
|
Wording
|
| | |
Consistent with JCC Title 18.35.060.2(c), the proposal will not relocate an entire lot, tract, or parcel.
|
|
|
Title:
|
| | |
CONSISTENT WITH
|
|
Wording
|
| | |
Consistent with JCC Title 18.35.060.2(d), the proposal is not inconsistent with the conditions of approval of any restrictions or covenants.
|
|
|
Title:
|
| | |
ZONING
|
|
Wording
|
| | |
This parcels have been designated as RR 1:5, RR1:10, and RR1:20 under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998. The southern parcels abut commercial forest lands.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on October 10, 2006 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: conservancy shoreline designation; F&W; seismic; landslide hazard areas; SUSC aquifer recharge area; coastal SIPZ; commercial forest lands adjacent.
|
|
|
Title:
|
| | |
F-Aquifer Recharge Area
|
|
Wording
|
| | |
Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.
|
|
|
Title:
|
| | |
F-Susc. Aquifer Recharge Area
|
|
Wording
|
| | |
Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.
|
|
|
Title:
|
| | |
F-Geohazard Area
|
|
Wording
|
| | |
Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.
|
|
|
Title:
|
| | |
F-Adjacent Forest Land Disclosure
|
|
Wording
|
| | |
Jefferson County has determined that the use of real property for agriculture and forestry operations is a high priority and favored use in the county. The county will not consider to be a nuisance those inconveniences or discomforts arising from such operations, if such operations are consistent with commonly accepted best management practices in compliance with local, state, and federal laws. If your real property includes or is within five hundred (500) feet of real property designated as Rural Residential 1:10 or 1:20, Rural Industrial, Rural Commercial, Agriculture, or Forestry, you may be subject to inconveniences or discomforts arising from such farming and forestry operations, including but not limited to noise, tree removal, odors, flies, fumes, dust, smoke, the operation of farm and forestry machinery during any 24-hour period, the storage and disposal or manure, and the application of permitted fertilizers and permitted pesticides. One or more of these inconveniences may occur as a result of agricultural and forestry operations which are in conformance with existing laws and regulations.
|
|
|
Title:
|
| | |
F-SIPZ
|
|
Wording
|
| | |
Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer.
|
|
|
Title:
|
| | |
F-Coastal SIPZ
|
|
Wording
|
| | |
The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record.
A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for a Boundary Line Adjustment only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|