Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
12/16/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Application Withdrawn
|
|
Date Completed:
|
| | |
5/13/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
6/19/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DECISION APPROVAL (Status "A")
|
|
Date Completed:
|
| | |
6/20/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
6/19/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Det. of Completeness-UF
|
|
Date Completed:
|
| | |
5/28/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
5/17/2001
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Date Assigned to Planner
|
|
Date Completed:
|
| | |
5/17/2001
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
6/4/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
5/28/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
5/28/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
5/28/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
6/19/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
SITE INSPECTION COMPLETE
|
|
Date Completed:
|
| | |
5/17/2001
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
UDC SECTION 7.2.1.A(1)
|
|
Wording
|
| | |
The proposal complies with UDC Section 7.2.1.a(2) in that this is to realign the boundary two parcels and correct legal description for the adjoining lot.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
Consistent with UDC Section 7.2.1.b.(1), the proposal will not create an additional lot, tract, or parcel.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
Consistent with UDC Section 7.2.1.b(2), the proposal is not within a binding site plan.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
Consistent with UDC Section 7.2.1.b(3), the proposal will not relocate an entire lot, tract, or parcel.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
Consistent with UDC Section 7.2.1.b.(4), the proposal is not inconsistent with the conditions of approval or any restrictions related to the recorded subdivision, circumvent the short subdivision process or long subdivision procedures, as the parcels involved in the boundary line adjustment are acreage parcels and have not been subdivided.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
The parcels have been designated as RR 1:5 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on May 31, 2001 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: wetlands, SUSC aquifer recharge area, flood, seismic, eagle, natural shoreline designation.
|
|
|
Title:
|
| | |
F-Aquifer Recharge Area
|
|
Wording
|
| | |
Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.
|
|
|
Title:
|
| | |
F-Susc. Aquifer Recharge Area
|
|
Wording
|
| | |
Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.
|
|
|
Title:
|
| | |
F-Geohazard Area
|
|
Wording
|
| | |
Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.
|
|
|
Title:
|
| | |
F-SEPA Exempt
|
|
Wording
|
| | |
Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(6)(a).
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for a boundary line adjustment only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|