|
Case Number | | BLD2021-00337
|
|
Description | | MARINA RENOVATION-replacement of only docks c and d with water and sewer connection.
SEP1996-00354/LOSS JEF017
|
|
Last Name | | MARSH ANDERSEN LLC
|
|
Received Date | | 6/7/2021 10:32:18 AM
|
|
Status | | R
|
|
| | |
|
|
Case Number | | SDP2018-00013
|
|
Description | | SHORELINE EXEMPTION AND FLOOD DEVELOPMENT PERMIT TO REMOVE AND DISPOSE OF EXISTING APPROXIMATELY 31,744 SQ. FT. FLOATING WOOD AND CONCRETE DOCK SYSTEM WITH FOAM LOG FLOTATION AND (90) 12-14" CREOSOTE TREATED TIMBER PILINGS AND REPLACE WITH NEW APPROXIMATELY 31,744 SQ. FT. FLOATING DOCK SYSTEM WITH 50% PRE-STRESSED CONCRETE DECKING AND 50% FIBERGLASS GRATING WITH 69% OPEN AREA (1.5" X 1.5" SQUARES) AND POLYETHYLENE FOAM FILLED TUB FLOTATION SECURED BY (90) 12" GALVANIZED STEEL PILINGS.
|
|
Last Name | | WISE
|
|
Received Date | | 7/25/2018 7:56:31 AM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | PRE2018-00018
|
|
Description | | Remove and replace exisitng 29,900sqft floating wood/concrete dock
|
|
Last Name | | MARSH ANDERSEN LLC
|
|
Received Date | | 5/30/2018 11:44:31 AM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | BLD2016-00145
|
|
Description | | PERMIT TO BUILD A PERGOLA OVER EXISTING PICNIC/COOKING AREA
|
|
Last Name | | MARSH ANDERSEN LLC
|
|
Received Date | | 4/6/2016 7:33:19 AM
|
|
Status | | Canceled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2016-00013
|
|
Description | | SHORELINE DEVELOPMENT TO BUILD A PERGOLA OVER EXISTING PICNIC AREA
|
|
Last Name | | MARSH ANDERSEN LLC
|
|
Received Date | | 4/6/2016 7:28:48 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
|
Case Number | | SQG2016-00038
|
|
Description | |
|
|
Last Name | | PORT HADLOCK MARINA
|
|
Received Date | | 2/18/2016 4:25:09 PM
|
|
Status | | ACT
|
|
| | |
|
|
Case Number | | PRE2015-00021
|
|
Description | | NEW RECREATIONAL VEHICLE RESORT WITH 1800 SQ FT. SINGLE STORY GUEST REGISTRATIONS BUILDING.
ALL PARKING STALLS TO HAVE ACCESS TO POWER,WATER AND WASTE DISPOSAL. ALL WASTE TO BE PUMPED TO AN EXISTING DRAINFIELD ON PARCEL 901-014-003. ALSO TWO EXISTING UNIMPROVED ROADWAYS ARE TO BE VACATED.
|
|
Last Name | | MARSH ANDERSEN LLC
|
|
Received Date | | 6/5/2015 2:51:02 PM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | SDP2011-00060
|
|
Description | | SHORELINE EXEMPTION FOR EXISTING LANDSCAPING
|
|
Last Name | | MARSH ANDERSEN LLC
|
|
Received Date | | 11/8/2011 12:00:00 AM
|
|
Status | | Withdrawn
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | PRE2011-00023
|
|
Description | | PRE APPLICATION FOR NEW RECYCLING BLDG/GARBAGE SHED, NEW SIGN, ER-SURFACE PAVEMENT,NEW ROCK WALLS
|
|
Last Name | | MARSH ANDERSEN LLC
|
|
Received Date | | 9/26/2011 12:00:00 AM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2011-00009
|
|
Description | | SHORELINE EXEMPTION FOR REPAIR AND MAINTENANCE OF EXISTING FACILITIES: THE EXISTING MARINA SUSTAINED DAMAGE DUE TO A STORM THAT OCCURRED IN NOVEMBER 2010. THE EMERGENCY CONSTRUCTION IS NECESSARY TO PROTECT THE PROPERTY FROM FUTURE DAMAGE BY THE ELEMENTS. THERE WILL BE NO EXPANSION OF THE OVERWATER STRUCTURES AND NO DEVELOPMENT OF NEW OVERWATER STRUCTURES AS A RESULT OF THE REPAIR. ALL WORK WILL BE IN LIKE KIND AND CONFIGURATION AS THE EXISTING STRUCTURES.
|
|
Last Name | | M SUKI CO LLC
|
|
Received Date | | 2/23/2011 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD2011-00042
|
|
Description | | STORM DAMAGE REPAIR TO PORT HADLOCK MARINA
|
|
Last Name | | MARSH ANDERSON LLC
|
|
Received Date | | 2/23/2011 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
|
Case Number | | SUB2008-00012
|
|
Description | | Bondary Line Adjustment
|
|
Last Name | | PORT HADLOCK/K S C LLC
|
|
Received Date | | 2/15/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | RAP2004-00327
|
|
Description | | UTILITY CLASS B - PREPAID
|
|
Last Name | | PORT HADLOCK/K S C LLC
|
|
Received Date | | 12/17/2004 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | PRE2004-00011
|
|
Description | | Short Subdivision.
|
|
Last Name | | PORT HADLOCK/K S C LLC
|
|
Received Date | | 3/30/2004 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | BLD2003-00198
|
|
Description | | CONVERT YACHT CLUB TO HOTEL ROOM
|
|
Last Name | | PORT HADLOCK/K S C LLC
|
|
Received Date | | 3/28/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2003-00003
|
|
Description | | CONVERT LOUNGE TO 2 BEDROOM HOTEL UNIT
|
|
Last Name | | PORT HADLOCK/K S C LLC
|
|
Received Date | | 1/2/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2002-00683
|
|
Description | | INTERIOR REMODEL
|
|
Last Name | | PORT HADLOCK/K S C LLC
|
|
Received Date | | 11/15/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2002-00042
|
|
Description | | To convert current storage shed into unisex toilet facilities. This proposal is exempt from the State Environmental Policy Act (SEPA) per WAC 197-11-800(2)(e). In addition is is classified as an exemption per Section 3.402(6) of the Jefferson County Shoreline Master Program.
|
|
Last Name | | HERRINGTON
|
|
Received Date | | 8/23/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2001-00037
|
|
Description | | Discover any (if any) concerns or issues, past history of the Port Hadlock Marina.
Intent is to operate (acquire) Port Hadlock Marina and some upland area. The Motel is not part of this project. Eventual applications may include office, restrooms, etc.
|
|
Last Name | | SWANSON
|
|
Received Date | | 5/23/2001 12:00:00 AM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | SUB2001-00005
|
|
Description | | Boundary Line Adjustment
|
|
Last Name | | PORT HADLOCK/K S C LLC
|
|
Received Date | | 5/17/2001 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | SOM1996-00354
|
|
Description | |
|
|
Last Name | | M SUKI CO LLC
|
|
Received Date | | 10/6/1997 12:00:00 AM
|
|
Status | | ACT
|
|
| | |
|
|
Case Number | | SEP1996-00354
See SOM case for current septic system activity.
|
|
Description | | holding tank serving the boat pump out at the marina.
|
|
Last Name | | PORT HADLOCK/ K S C LLC
|
|
Received Date | | 11/22/1996 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP1995-10008
|
|
Description | | To modify the existing breakwater and construct an addition to the existing marina. The existing floats in the center of the breakwater will be relocated to the outside of the breakwater wall to replace the existing floating logs. The existing marina will be expanded by the addition of new floats to create an additional 62 mooring slips. The center of the breakwater wall will have I-beams driven and concrete panels set to close the center of the wall. Revision 5/23/97:extend the most waterward fingers 10' and move one other finger shoreward (see attached drawing).
|
|
Last Name | | KCS/HADLOCK, LTD.
|
|
Received Date | | 9/12/1995 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1994-00014
|
|
Description | | The proposal is repair of breakwater and replace slips and walkways at Port Hadlock Inn and Marina damaged by December 1990 storm.
|
|
Last Name | | HANSON
|
|
Received Date | | 3/25/1994 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1993-00008
|
|
Description | | Proposal: To repair breakwater and replace slips and walkways at Port Hadlock Inn and Marina damaged by Dec 1990 storm.
|
|
Last Name | | HANSON
|
|
Received Date | | 2/12/1993 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1992-00018
|
|
Description | | Repair of breakwater and replace slips and walkways at PH Inn and Marina damaged by 1990 storm.
|
|
Last Name | | VILLA MARINA PARTNERS, LP
|
|
Received Date | | 1/9/1992 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP1982-00021
|
|
Description | | Expansion of 38 slip marina
|
|
Last Name | | HANSEN
|
|
Received Date | | 10/27/1982 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1981-00015
|
|
Description | | Replacement of floats at the Hadlock Boat Haven
|
|
Last Name | | YOUNT
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1985-00021
|
|
Description | | Temporarily place a floating log boom off shore to reduce sediment deposition on the boat launch.
|
|
Last Name | | YOUNT
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|