Permit Case Summary

Case Number: Search Help

Case Number:SEP2021-00224 Case Status:Pending Date Received:12/10/2021
Description: Date Issued:
Applicant:ANN DU Expiration Date:
Site Address:270 BRIGHTON AVE Case Finaled:
Parcel No:994800201 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Updated/Add'l Info Recv'd
Date Completed: 4/21/2022
Disposition: DONE
Description: REDESIGN SUBMITTED (Fm) "P"
Date Completed: 4/11/2022
Disposition: DONE
Description: A Clock Interrupt
Date Completed: 4/21/2022
Disposition: DONE
Description: Additional Info Req-DRD (fm)
Date Completed:
Disposition:
Description: Pending letter; add inf (Fm)
Date Completed:
Disposition:
Description: 10 day Open - Under Review
Date Completed: 1/13/2022
Disposition: DONE
Description: Septic Permit Application (Fm)
Date Completed: 12/14/2021
Disposition: DONE
Description: Miscellaneous Action
Date Completed: 12/14/2021
Disposition: DONE
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 12/14/2021
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed:
Disposition:
Description: Initial Site Inspection by HD
Date Completed: 1/13/2022
Disposition: DONE
Description: PRESSURE-PUMP TEST REQUEST
Date Completed:
Disposition:
Description: Env. Sensitive Area Review-U
Date Completed:
Disposition:
Description: Stormwater Review-U
Date Completed: 1/13/2022
Disposition: DONE
Description: Case Entered "P"
Date Completed: 12/14/2021
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: pressure test observation
Wording Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: well decommissioning
Wording H - Well to be decommissioned as per WAC 173-160-381 by licensed well driller. Contact Jefferson County Public Health for information on required applications and inspections. Verification of decommissioning to be provided to Public Health Department. The decommissioning of the well must be completed prior to final pressure test of the septic system.

Title: Tank Abandonment
Wording H - Existing tank shall be properly abandoned. It shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final.

Title: staking of drainfield
Wording Contact designer prior to installation for staking of drainfield area.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: SAND LINED TRENCH/BED
Wording TRENCH TO BE EXCAVATED TO A MAX DEPTH OF 69" TO GET THROUGH THE EXISTING DRAINFIELD IF ENCOUNTERED, THEN BACKFILLED WITH ASTM 33 TYPE SAND TO 24" AS PER DESIGN.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: O & M Manual required
Wording Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system.

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: Certified Installer Required
Wording This system must be constructed by an installer certified by the Jefferson County Public Health Department per Jefferson County Code 8.15.120 (9) and state code WAC246-272A-0250 due to distance from shoreline

Title: No Building Permit Guaranteed
Wording Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application.

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: Contaminated Material - offsite
Wording H - The material that is removed from the system that has come into contact with waste water must be treated/decontaminated prior to final disposal. The material from the system shall be removed and stockpiled to allow for pathogen die-off. The material shall be placed in 6"-8" lifts, each lift covered with lime. The location for the stockpile shall be approved by the Health Officer and shall meet all requirements of an onsite sewage system (setbacks from surface waters and wells and vertical separation, etc.). It shall be covered and protected from erosion (covered with plastic or several 6 inches of uncontaminated soil and covered with straw, etc.). After the material has been stockpiled for a minimum of one year, the material may be used without site restrictions. Any alteration or modification from this process must be reviewed and approved by the Health Officer prior to start of work.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) for the control of stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: Connection to Public Water
Wording This approval is valid only with a connection to an approved public water supply.