Permit Case Summary

Case Number: Search Help

Case Number:SEP2014-00048 Case Status: Date Received:4/30/2014
Description:Willoughby Creek Campground(CG) River has reclaimed this camp ground and DNR has removed the Vault Toilet and placed it into storage. CG now decommissioned. Date Issued:6/10/2014
Applicant: STATE OF WASHINGTON-DNR Expiration Date:6/10/2017 12:00:00 AM
Site Address: .................... Case Finaled:4/3/2015
Parcel No:712253000 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Decommission SEP sys "C"
Date Completed: 1/29/2016
Disposition: DONE
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 4/3/2015
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed: 2/27/2015
Disposition: DONE
Description: Issue permit (Fm) "A"
Date Completed: 6/10/2014
Disposition:
Description: Monitoring Agreemt Sent (Fm)
Date Completed: 7/10/2014
Disposition: DONE
Description: Septic Permit Application (Fm)
Date Completed: 5/1/2014
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 4/3/2015
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 6/9/2014
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 6/9/2014
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 6/9/2014
Disposition: DONE
Description: Case Entered "P"
Date Completed: 5/1/2014
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: holding tank
Wording Risers to grade with secured lids shall be located over all compartments. Access ports intended for use as pump-out sites shall be fitted with an impervious pad that slopes towards the access. All pumping and related service must be performed by a Jefferson County licensed septic system pumper. Permit Holder shall maintain and keep operational records which include pumping intervals, sewage volume, disposal site, service and repair records. These records shall be available upon request of the Health officer representative.

Title: conventional-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the Designer is required prior to final approval.

Title: Designer Notification/inspections
Wording A DNR Engineer must be contacted prior to start of construction for inspections during installation. ENGINEER IS REQUIRED TO INSPECT AND PROVIDE A RECORD DRAWING OF THE VAULT TOILET AFTER COMPLETION. COPY TO BE PROVIDED TO THE JEFFERSON COUNTY HEALTH DEPARTMENT

Title: Code Compliance
Wording All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.

Title: PUMPING
Wording When the vault is to be pumped a Jefferson County licensed pumper must be used. Currently there are 2 companies that are located in Port Angeles that are licensed by Jefferson County.

Title: INSPECTION
Wording The vaults shall be inspected by DNR staff at lease twice per month during the summer and fall and monthly during the winter, as stated in the application package.

Title: Stormwater BMPs