Description:
|
| | |
Decommission SEP sys "C"
|
|
Date Completed:
|
| | |
1/29/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
SEPTIC PERMIT FINALED "F"
|
|
Date Completed:
|
| | |
4/3/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
INSTALLATION START NOTICE
|
|
Date Completed:
|
| | |
2/27/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue permit (Fm) "A"
|
|
Date Completed:
|
| | |
6/10/2014
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Monitoring Agreemt Sent (Fm)
|
|
Date Completed:
|
| | |
7/10/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Permit Application (Fm)
|
|
Date Completed:
|
| | |
5/1/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Asbuilt drawing submitted
|
|
Date Completed:
|
| | |
4/3/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Initial Site Inspection by HD
|
|
Date Completed:
|
| | |
6/9/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
6/9/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
6/9/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered "P"
|
|
Date Completed:
|
| | |
5/1/2014
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
ONGOING MONITORING
|
|
Wording
|
| | |
H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THAT A RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED.
A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT
|
|
|
Title:
|
| | |
UDC compliance
|
|
Wording
|
| | |
Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.
|
|
|
Title:
|
| | |
holding tank
|
|
Wording
|
| | |
Risers to grade with secured lids shall be located over all compartments. Access ports intended for use as pump-out sites shall be fitted with an impervious pad that slopes towards the access. All pumping and related service must be performed by a Jefferson County licensed septic system pumper. Permit Holder shall maintain and keep operational records which include pumping intervals, sewage volume, disposal site, service and repair records. These records shall be available upon request of the Health officer representative.
|
|
|
Title:
|
| | |
conventional-asbuilt required
|
|
Wording
|
| | |
H - An asbuilt drawing and certification of completion by the Designer is required prior to final approval.
|
|
|
Title:
|
| | |
Designer Notification/inspections
|
|
Wording
|
| | |
A DNR Engineer must be contacted prior to start of construction for inspections during installation. ENGINEER IS REQUIRED TO INSPECT AND PROVIDE A RECORD DRAWING OF THE VAULT TOILET AFTER COMPLETION. COPY TO BE PROVIDED TO THE JEFFERSON COUNTY HEALTH DEPARTMENT
|
|
|
Title:
|
| | |
Code Compliance
|
|
Wording
|
| | |
All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued.
|
|
|
Title:
|
| | |
PUMPING
|
|
Wording
|
| | |
When the vault is to be pumped a Jefferson County licensed pumper must be used. Currently there are 2 companies that are located in Port Angeles that are licensed by Jefferson County.
|
|
|
Title:
|
| | |
INSPECTION
|
|
Wording
|
| | |
The vaults shall be inspected by DNR staff at lease twice per month during the summer and fall and monthly during the winter, as stated in the application package.
|
|
|
Title:
|
| | |
Stormwater BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|