Cases Associated with Parcel No: 712253000

This may not be a complete listing of information that exists for this parcel. There may be other information pertinent to the property on file. Please contact the Department of Community Development for additional information.

Parcel Tags

Case Number  FPA2615573
Description  Harvest 96 Acres, stream crossing
Last Name  STATE OF WASHINGTON DNR
Received Date  7/25/2018 12:00:00 AM
Status  Finaled
  

Case Number  SDP2017-00011
Description  SHORELINE SUBSTANTIAL DEVELOPMENT & SHORELINE CONDITIONAL USE PERMIT WITH SEPA REVIEW (SUBJECT TO A STORMWATER MANAGEMENT PERMIT) The Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration (FHWA), in partnership with Jefferson County, proposes to construct bank stabilization and bridge and culvert improvements in six locations along the Upper Hoh River Road (UHRR). The proposed project will develop and implement bank stabilization solutions at three locations along the UHRR, and will replace or improve three existing bridge or culvert locations. The roadway at these sites is at risk of washing away in a large flood. Bank stabilization will consist of installing engineered log jams (ELJs) with dolosse at the three sites. ELJs are collections of large woody debris (LWD) that when placed in a river or other water body, redirect flow and increase stability to a bank or downstream gravel bar. Installation is patterned after stable, naturally-occurring log jams, which are usually formed by large trees with rootwads attached that stabilize and anchor other debris that accumulate against the trees. Specifically, bank stabilization activities will occur at Sites C1, C2, and C4 and will occur in and directly adjacent to the Hoh River. Culvert replacement will occur at MP 4.38 of the UHRR. Bridge replacement will occur at Sites C3 and C5. The application submittal includes construction plans and a temporary erosion and sediment control plan prepared by FHWA for the project as well as the Lindner Creek Mitigation Site. Permanent riparian and wetland impacts are shown in JARPA figures. The project is proposed to occur between Summer 2018 and Fall 2020. The submittal includes a Joint Aquatic Resource Protection Application, Biological Assessment and Survey, 2015 Wetland Delineation Report, 2017 Wetland Addendum and a Wetland Mitigation Plan, Hydraulic Report, Upper Hoh River Bank Failure Risk Reduction Study, Logs and Soils Test Results, and WDNR Mass Wasting Module Level II Assessment. Final authority for shoreline conditional use permit decisions rests with the Washington State Department of Ecology. The project is subject to a Washington Department of Fish and Wildlife Hydraulic Project Approval, Clean Water Act Section 404 and 401 Water Quality Certification administered by Department of Ecology, Dept. of Natural Resources Aquatic Lease Authorization, Section 7 of the Endangered Species Act administered by NOAA fisheries; Section 106 of the National Historic Preservation Act administered by Dept. of Archaeological and Historic Preservation, and Coastal Zone Management Certification by Department of Ecology.
Last Name  JEFFERSON CO. PUBLIC WORKS
Received Date  8/17/2017 7:49:16 AM
Status  CLS
  

Case Number  PRE2017-00012
Description  Western Federal Lands Hoh River Road Restoration Project to install bank stabilization mechanisms as well as replacing a culvert and two bridges.
Last Name  FHWA WESTERN FEDERAL LANDS HIGHWAY
Received Date  3/9/2017 10:59:03 AM
Status  M
  

Case Number  BLD2014-00151
Description  INSTALL VAULT TOILET AT WILLOUGHBY CREEK CAMPGROUND
Last Name  STATE OF WASHINGTON-DNR
Received Date  4/30/2014 12:00:00 AM
Status  Finaled
LaserFiche Links  View LaserFiche Documents

Case Number  SEP2014-00048
See SOM case for current septic system activity.
Description  Willoughby Creek Campground(CG) River has reclaimed this camp ground and DNR has removed the Vault Toilet and placed it into storage. CG now decommissioned.
Last Name  STATE OF WASHINGTON-DNR
Received Date  4/30/2014 12:00:00 AM
Status  DCM
  

Case Number  PRE2010-00010
Description  REPAIR OF THE WILLOUGHBY CREEK BRIDGE AND ADJACENT STREAM PROTECTION.
Last Name  HOH RIVER TRUST
Received Date  3/9/2010 12:00:00 AM
Status  M
LaserFiche Links  View LaserFiche Documents

Case Number  XMP1975-00016
Description  Emergency bridge repair on Willoughby Creek
Last Name  BECKER
Received Date  12/8/1975 12:00:00 AM
Status  E
  

Case Number  XMP1975-00015
Description  County Road #216 (Upper Hoh Road) emergency repair
Last Name  BECKER
Received Date  12/5/1975 12:00:00 AM
Status  E