Permit Case Summary

Case Number: Search Help

Case Number:SEP2009-00001 Case Status: Date Received:1/13/2009
Description:DOSEWALLIPS STATE PARK- holding tank for visitors center. FILED WITH SEP79-288 Now connected to the MBR Plant, existing tank kept for back-up Date Issued:2/27/2009
Applicant: STATE OF WASHINGTON-NAT RESOUR Expiration Date:6/20/2010 12:00:00 AM
Site Address:HWY 101 Case Finaled:
Parcel No:502021001 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Decommission SEP sys "C"
Date Completed: 9/25/2015
Disposition: DONE
Description: Violation/Compliance (F) "A"
Date Completed: 9/25/2015
Disposition: DONE
Description: INSTALLATION START NOTICE
Date Completed:
Disposition:
Description: Issue permit (F)
Date Completed: 2/27/2009
Disposition: DONE
Description: Miscellaneous Action
Date Completed: 2/3/2009
Disposition:
Description: Pending letter; add inf (F)
Date Completed: 2/27/2009
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 1/13/2009
Disposition: DONE
Description: Case Entered
Date Completed: 1/13/2009
Disposition:
Description: Stormwater Review-U
Date Completed: 2/19/2009
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 2/19/2009
Disposition: DONE
Description: Asbuilt drawing submitted
Date Completed: 6/1/2012
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: ONGOING MONITORING
Wording H - AS PER WAC 246-272A AND JEFFERSON COUNTY CODE 8.15 ALL SEPTIC SYSTEMS REQUIRE MONITORING. THIS SEWAGE SYSTEM WILL REQUIRE MONITORING ON A WEEKLY BASIS. MONITORING REPORTS TO BE SUBMITTED TO THE COUNTY HEALTH DEPARTMENT QUARTERLY. THIS TANK NOW A PART OF THE PARKS WASTE WATER TREATMENT PLANT PERMIT..

Title: PUMPING
Wording H - This holding tank requires routine pumping and must be pumped by a Jefferson County licensed pumper.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: transport line double cased
Wording Any portion of transport line under a driven way is to be sleeved/cased or equivalent.

Title: comm- sep tank inspection
Wording Health Department is to be contacted for a final inspection of the holding tank prior to covering.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: state onsite regs waiver
Wording This site has been granted a waiver from the state onsite sewage regulation 246-272A-240 Compliance with conditions of the waiver is required.

Title: holding tank
Wording Risers to grade with secured lids shall be located over all compartments. Access ports intended for use as pump-out sites shall be fitted with an impervious pad that slopes towards the access. All pumping and related service must be performed by a Jefferson County licensed septic system pumper. Permit Holder shall maintain and keep operational records which include pumping intervals, sewage volume, disposal site, service and repair records. These records shall be available upon request of the Health officer representative. A high water float with an audio visual alarm shall be provided. The alarm shall be located within view of the holding tank in a watertight enclosure and approved by the State Electrical Inspector.

Title: risers
Wording Risers are required to grade with secured lids over both compartments and over the outlet of the septic tank for inspection and maintenance/monitoring. Minimum 20" riser over inlet.

Title: conventional-asbuilt required
Wording H - An asbuilt drawing and certification of completion by the Designer is required prior to final approval.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: WAIVER - LIMITED PERMIT LIFE
Wording This permit was issued as part of a waiver to WAC 246-272A-0240. The holding tank permited here must be connected to a permitted OSS by June 2010

Title: Designer Notification/inspections
Wording Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.

Title: Installation Inspection
Wording Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start.

Title: Certified Installer Required
Wording This system must be constructed by an installer certified by the Jefferson County Public Health Department per state code WAC246-272A-0250.

Title: MINIMIZE INFIL OF FLOOD WATERS
Wording New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters

Title: LOCATED TO AVOID IMPAIRMENT
Wording On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding.

Title: CONVERTING TANK
Wording H -This holding tank must be converted to a regular septic tank and connected to the park wide OSS by June 2010. If the park wide OSS is not complete by June 2010 then a new OSS permitted by this office to serve the visitors center will be required.

Title: Follow Flood Ordinance
Wording Flood hazard reduction measures are to be used as required by the Jefferson County Flood Damage Prevention Ordinance 07-0515-06 (Jefferson County Code Chapter 15.15).

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County staff for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: (list here).