Case Number:SEP2000-00114 Case Status:Canceled Date Received:5/15/2000
Description:Expired & Archieved, on 9/3/13 Scanned on 6/22/07 Date Issued:1/7/2002
Applicant:KATHY ARTHUR Expiration Date:1/7/2005 12:00:00 AM
Site Address:64 N WATER ST Case Finaled:
Parcel No:989400704 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Cancel/withdraw application
Date Completed: 1/27/2005
Disposition: DONE
Description: Issue permit (F)
Date Completed: 1/7/2002
Disposition: DONE
Description: Pending letter; add inf (F)
Date Completed: 1/7/2002
Disposition: DONE
Description: Case Entered
Date Completed: 5/16/2000
Disposition:
Description: Stormwater Review
Date Completed: 12/3/2001
Disposition: DONE
Description: Review Case
Date Completed: 12/10/2001
Disposition: DONE
Description: Critical Area Review
Date Completed: 12/3/2001
Disposition: DONE
Description: Pressure test required
Date Completed:
Disposition:
Description: Septic Permit Application (F)
Date Completed: 5/16/2000
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.

Title: pressure test observation
Wording Health Dept. required to observe pressure test when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: well setback requirement
Wording Setbacks to all wells- 100' required from drainfield and reserve areas. 50' required from tanks and effluent transport lines. Property abandoned well setbacks are 10' from any portion of system.

Title: other setbacks req.
Wording 10' min. horizontal separation between any portion of drainfield and reserve areas and any water lines. Compliance with Department of Ecology Sewage Works Design criteria required if not conforming to minimum setbacks.

Title: trench depth
Wording MAXIMUM TRENCH DEPTH 12 INCHES, no sand lining.

Title: reserve area, alternative
Wording When/if designated reserve area is utilized an alternative system providing an additional level of treatment may be required.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: staking of drainfield
Wording Contact designer prior to installation for staking of drainfield area.

Title: dose counter
Wording Dose counters are required in the control panel for all drainfield components.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: transport line double cased
Wording Any portion of transport line under a driven way is to be double cased or equivalent.

Title: water tight tank
Wording Septic tank and pump chamber to be water tight. Extra protection (i.e. Bentonite) to be used around inlet, outlet, and risers due to high water table.

Title: treatment standard
Wording This system meets Treatment Standard II as required for mitigation in an aquifer recharge area. Annual monitoring required.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: env. sensitive area conditions
Wording Compliance with the Environmentally Sensitive Areas Review conditions is required.

Title: risers
Wording Risers are required to grade with secured lids over the inlet and outlet of the septic tank. Minimum 24" riser over inlet.

Title: reduced size df
Wording Performance monitoring schedule for treatment systems followed by reduced sized drainfield/infiltrative area shall be :1) Two times per year (once every six months) during the first and second year following installation. 2) One time per year beginning with the third year following installation. 3) In response to complaints or problems. Observation ports to the bottom of the trench are to be installed in at least two places on each drainfield line: One within 10 feet of the end of each line.

Title: surface water setback
Wording Setback to surface waters- 100' required from drainfield and reserve areas. 50' required from tanks.

Title: protective barriers
Wording Permanent barriers are required along/around primary and reserve drainfield areas to protect from parking, driving, and other land disturbing activities prior to final.

Title: FLOOD -NO HOLD
Wording Additional measured to be taken to assure that no infiltration occurs into tanks and sand filter during flood events. Risers to be fitted with water tight seal, no vented lids. Designed to meet flood damage prevention per ordinance #18-1120-95

Title: ARCHEOLOGIC -NO HOLD
Wording The area is know to have historical and cultural deposits. In the event of discovery of such deposits, including shell middens, work shall CEASE. Contact engineer and the health department.

Title: ROAD CROSSING-NO HOLD
Wording Compliance with conditions of road crossing permit is required.

Title: BLA-NO HOLD
Wording The site has been modified through an approved boudaary line adjustment, recorded on 8/10/01.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.