Description:
|
| | |
OSS Inspection-2 Year
|
|
Date Completed:
|
| | |
8/15/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
OSS Inspection-Custom Schedule
|
|
Date Completed:
|
| | |
8/10/2004
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
OSS Inspection-1 Year
|
|
Date Completed:
|
| | |
8/13/2002
|
|
Disposition:
|
| | |
1YR
|
|
|
Description:
|
| | |
SEPTIC PERMIT FINALED "F"
|
|
Date Completed:
|
| | |
10/16/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue permit (F)
|
|
Date Completed:
|
| | |
7/14/1998
|
|
Disposition:
|
| | |
ISSU
|
|
|
Description:
|
| | |
PUD contract required
|
|
Date Completed:
|
| | |
10/16/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
AsBuilt from engineer req
|
|
Date Completed:
|
| | |
6/1/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Pressure test required
|
|
Date Completed:
|
| | |
3/23/1999
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
6/3/1998
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Stormwater Review
|
|
Date Completed:
|
| | |
6/15/1998
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Review Case
|
|
Date Completed:
|
| | |
7/14/1998
|
|
Disposition:
|
| | |
ISSU
|
|
|
Description:
|
| | |
Critical Area Review
|
|
Date Completed:
|
| | |
6/15/1998
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Septic Permit Application (F)
|
|
Date Completed:
|
| | |
6/5/1998
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
pud monitoring
|
|
Wording
|
| | |
AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.
|
|
|
Title:
|
| | |
pressure test observation
|
|
Wording
|
| | |
Health Dept. required to observe pressure test, 48 hour notice to be given.
|
|
|
Title:
|
| | |
well setback requirement
|
|
Wording
|
| | |
Setbacks to all wells- 100' required from drainfield and reserve areas. 50' required from tanks and effluent transport lines.
|
|
|
Title:
|
| | |
other setbacks req.
|
|
Wording
|
| | |
10 ft. setback from any water line at the facility must be maintained from all septic system components.
|
|
|
Title:
|
| | |
trench depth
|
|
Wording
|
| | |
MAXIMUM TRENCH DEPTH 6-12 INCHES
|
|
|
Title:
|
| | |
reserve area, alternative
|
|
Wording
|
| | |
When/if designated reserve area is utilized an alternative system providing an additional level of treatment may be required.
|
|
|
Title:
|
| | |
low use water fixures
|
|
Wording
|
| | |
Low use water fixtures are required per the approved design (see construction note 21 on page 5of5. 1.6 gal. flush toilets and sink faucets that self close.
|
|
|
Title:
|
| | |
protection from vehicular traffic
|
|
Wording
|
| | |
All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Protective barriers may be required around drainfield.
|
|
|
Title:
|
| | |
installed on natural contours
|
|
Wording
|
| | |
Drainlines are to be installed along the natural contours.
|
|
|
Title:
|
| | |
staking of drainfield
|
|
Wording
|
| | |
Contact designer prior to installation for staking of drainfield area.
|
|
|
Title:
|
| | |
dose counter
|
|
Wording
|
| | |
Dose counters and timers are required in the control panel for drainfield components.
|
|
|
Title:
|
| | |
divert drainage
|
|
Wording
|
| | |
Divert all sources of drainage, including roof drains away from septic tank and drainfield area.
|
|
|
Title:
|
| | |
transport line double cased
|
|
Wording
|
| | |
Any portion of transport line under a driven way is to be double cased or equivalent.
|
|
|
Title:
|
| | |
water tight tank
|
|
Wording
|
| | |
Asphaultic emulsion or equivalent required on septic tanks and pump chambers.
|
|
|
Title:
|
| | |
no building permit guarantee
|
|
Wording
|
| | |
Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.
|
|
|
Title:
|
| | |
critical area compliance
|
|
Wording
|
| | |
Approval of this sewage disposal permit does not preclude the permit holder from complying with the Critical Areas Ordinance for other development on the site.
|
|
|
Title:
|
| | |
domestic strength waste
|
|
Wording
|
| | |
This onsite sewage system is designed for domestic strength waste water only. Disposal of any other waste streams is considered a violation of this permit.
|
|
|
Title:
|
| | |
risers
|
|
Wording
|
| | |
Risers are required to grade with secured lids over the inlet and outlet of all septic tanks. Minimum 24" riser over inlet.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Existing water line is to be abandoned in place and capped at both ends. The new water line must be a minimum of 10 feet from any septic system component.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
If during installation any portion of the abandoned water line is dammaged the dammaged section must be cut out and capped at both ends.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
A site visit by this office to confirm the existing drainfield and four (4) tanks were abandoned is required prior to receiving a final on this permit. Also required is a copy of the pump receipts for the four tanks.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
This office is to be notified two days before to the pre construction meeting.
|
|