|
Case Number | | SDP2020-00021
|
|
Description | | Shoreline conditional use, shoreline substantial development, and flood development application to improve an existing public boat launch at Point Whitney. Washington Department of Fish and Wildlife (WDFW) is proposing to leave the existing launch in place and to install new planks with steel bars/rails. This will raise the elevation of the ramp while keeping it in the same footprint. The improved ramp would not be above the average existing beach grade. The proposed ramp will be raised to improve safety and reduce impacts on beach substrates in the area. Mitigation proposed by WDFW includes previously-completed grading at the west end of the point to match the beach grade and use of the Hood Canal Coordinating Council In-lieu Fee program. The applicant submitted an Eelgrass Delineation report, a Coastal Processes Assessment and Design Considerations report, and a Habitat Management Plan. The applicant also submitted WDFW government-government consultation letters with Washington Department of Archaeology and Historic preservation and with Tribes. The proposal is subject to review under the State Environmental Policy Act (SEPA) and WDFW acted as the lead agency for SEPA.
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 1/1/2021 11:48:48 AM
|
|
Status | | Pending
|
|
| | |
|
|
Case Number | | PRE2019-00039
|
|
Description | | Point Whitney Boat Launch
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 12/2/2019 9:49:01 AM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | BLD2019-00028
|
|
Description | | Interpretative sign
SEP98-00126
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 1/29/2019 1:04:07 PM
|
|
Status | | S2
|
|
| | |
|
|
Case Number | | CAM2018-00727
|
|
Description | | build 1,900 sf greenhouse to store warehousing tanks to grow algae for young shellfish
|
|
Last Name | | KURTZE
|
|
Received Date | | 11/1/2018 11:42:06 AM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2018-00020
|
|
Description | | Shoreline Exemption for Maintenance to an Existing Parking Area including removal of a 3500 sq ft. concrete slap, regrading and replacement of Interpretive board for an existing recreational facility.
|
|
Last Name | | WA DEPT OF FISH AND WILDLIFE
|
|
Received Date | | 10/4/2018 11:14:14 AM
|
|
Status | | CLS
|
|
| | |
|
|
Case Number | | CAM2018-00579
|
|
Description | | Questions regardign the permits required to elevate a boat ramp
|
|
Last Name | | NICHOLAS
|
|
Received Date | | 8/27/2018 11:03:08 AM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | CAM2018-00578
|
|
Description | | Questions regarding what permits are required to re-grade and gravel exisitng parking lot and renovate a bathroom
|
|
Last Name | | NICHOLAS
|
|
Received Date | | 8/27/2018 10:00:17 AM
|
|
Status | | M
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2014-00390
|
|
Description | | REPLACEMENT OF ROOF SAME FOR SAME
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 10/22/2014 8:40:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
|
Case Number | | SDP2013-00029
|
|
Description | | Point Whitney Tide Gate Culvert & Dike Maintenance/Replacement - Flood Development Permit
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 5/23/2013 3:41:27 PM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP2005-00020
|
|
Description | | Pt Whitney Boat Ramp Repairs
|
|
Last Name | | DEPT OF FISH & WILDLIFE
|
|
Received Date | | 6/29/2005 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2005-00022
|
|
Description | | DEMOLISH - REMOVAL OF UNDERGROUND STORAGE TANK
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 1/10/2005 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SOM1998-00126
|
|
Description | | send correspondence as of 2/8/2018 Diane Gange, 1023 Old Blyn Hwy, Sequim, WA 98382
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 10/16/2001 12:00:00 AM
|
|
Status | | RCR
|
|
| | |
|
|
Case Number | | BLD1999-00678
|
|
Description | | Nursery building at Hatchery
|
|
Last Name | | WA ST DOF
|
|
Received Date | | 10/8/1999 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP1999-10003
|
|
Description | | Replace a damaged vinyl structure and roof that covers an existing concrete slab. Replacement will be a conventional stick-framed wooden structure with colored metal siding and roofing. The structure will be sized at approximately 62' x 26' in plan, with a height of 17.25' above grade. The principal use of the structure will be to provide space for shellfish rearing equipment as an aquaculture facility.
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 3/23/1999 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1998-00034
|
|
Description | | Project repairs the existing septic system at the Pt. Whitney Shellfish Laboratory. Existing system will be abandoned in-place. Project includes installation of a new septic tank for the lab and admin. bldg., new septic tank for the interpretive center, and a new pump vault to the new drainfield.
|
|
Last Name | | WA ST DOF
|
|
Received Date | | 7/16/1998 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SEP1998-00126
See SOM case for current septic system activity.
|
|
Description | | SEP78-44 and SEP80-81 now filed here
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 6/3/1998 12:00:00 AM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1998-00009
|
|
Description | | install three concrete slabs for emergency generator, electrical service panels, and two 500 gallon diesel fuel storage tanks
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 3/12/1998 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD1998-00145
|
|
Description | | construct three concrete slabs for 2-500gal aboveground diesel storage tanks and 150 kw generator.
|
|
Last Name | | WA ST DOF
|
|
Received Date | | 3/11/1998 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1996-00073
|
|
Description | | Place 120 3.5' X 1'mesh bags into intertidal area to use for manila clam seed nursery during the winter 1996-1997.
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 10/16/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD1996-00072
|
|
Description | | Install new 1000 gal concrete fuel tank on concrete pad to provide heating oil to furnace in lab bldg.
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 2/14/1996 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1996-00003
|
|
Description | | Install new 1000 gal concrete fuel tank on concrete pad to provide heating oil to furnace in lab bldg.
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 1/29/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD1994-00732
|
|
Description | | Rehabilitation of existing shellfish lab
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 10/20/1994 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1994-00704
|
|
Description | | Residential Demolition
|
|
Last Name | | WA ST DO CORRECTIONS
|
|
Received Date | | 10/6/1994 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1993-00317
|
|
Description | | pole building for vehicle storage
|
|
Last Name | | WA ST FISH&WILDLIFE
|
|
Received Date | | 5/17/1993 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1991-00381
|
|
Description | | pole building - storage only
|
|
Last Name | | WA ST FISH & WILDLIFE
|
|
Received Date | | 6/13/1991 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1989-00009
|
|
Description | | PROPOSAL: To test a boat-mounted hydraulic/airlift clam harvester for use in harvesting juvenile razor clams for transplanting. The testing would be videotaped. There would be a maximum of 20 hours on-bottom times between mid-April and mid-May 1989.
|
|
Last Name | | STATE DEPT OF FISH & WILDLIFE
|
|
Received Date | | 5/4/1989 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | BLD1989-00291
|
|
Description | | Commercial alteration
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 5/2/1989 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1989-00290
|
|
Description | | New temporary office building
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 2/22/1989 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1989-00005
|
|
Description | | PROPOSAL: The project is to construct a fuel tank storage shed with a containment dike for heating oil at the Point Whitney Shellfish Laboratory in Brinnon.
|
|
Last Name | | STATE DEPT OF FISHERIES
|
|
Received Date | | 2/3/1989 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD1989-00289
|
|
Description | | Addition to fuel tank
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 1/11/1989 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1988-00009
|
|
Description | | PROPOSAL: The proposal is to repair the dike surrounding the saltwater ponds at the Point Whitney Shellfish Laboratory 4.5 miles northeast of Brinnon on the western side of Dabob Bay. The repairs will consist of grading, filling, and rip-rapping the pond side of the dike.
|
|
Last Name | | WA ST DOF
|
|
Received Date | | 3/17/1988 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1986-00049
|
|
Description | | Maintain existing raceways, place PVC pipe on bottom of raceways, and remove existing pipe.
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 12/12/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1985-00025
|
|
Description | | Replace existing concrete saltwater storage tank with two smaller fiberglass tanks in same vicinity.
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 2/20/1985 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1985-00026
|
|
Description | | Repair intake lines for hatchery. Involves replacing and cleaning sections of 4-inch wide line that extends to lower tide level and has portions buried under 12 inches to 18 inches of substrate material.
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 2/14/1985 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1984-00004
|
|
Description | | Develop aquaculture facility for the production of juvenile geoduck at Point Whitney Laboratory. Includes 1,000 cubic yards of fill, 36x100 ft metal building, rip-rap, generator, and fuel tank.
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 3/16/1984 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1983-00023
|
|
Description | | Repair lagoon outfall.
|
|
Last Name | | HINDS
|
|
Received Date | | 6/9/1983 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1982-00008
|
|
Description | | Remove seawater storage tanks and construct 25 ft cement retaining wall, concrete stairways, and parking facility
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 4/23/1982 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1981-10021
|
|
Description | | Inlet-outlet pipe to supply tidal water to shellfish rearing ponds.
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 12/16/1981 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD1980-00176
|
|
Description | | Display Building with restrooms
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 9/8/1980 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SEP1980-00081
See SOM case for current septic system activity.
|
|
Description | | now filed w/ SEP98-126. This tank permit and the existing drainfield have been
abandoned and replaced by SEP98-126
|
|
Last Name | | WA ST DEPT OF FISHERIES
|
|
Received Date | | 4/25/1980 12:00:00 AM
|
|
Status | | DCM
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP1980-10007
|
|
Description | | Construct a public restroom and display building and 2 shed roofs at existing laboratory facility
|
|
Last Name | | WA STATE DEPT OF FISHERIES
|
|
Received Date | | 4/10/1980 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | BLD1979-00281
|
|
Description | | salt water piping, 1000 ft of pipe
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 2/5/1979 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1978-00165
|
|
Description | | office building
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 5/12/1978 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SEP1978-00044
See SOM case for current septic system activity.
|
|
Description | | Now filed with SEP98-126 This tank permit and the existing (pre permit ?)
drainfield have been abandoned and replaced by SEP98-126 RMarx
|
|
Last Name | | WA. ST. DEPT OF FISHERIES
|
|
Received Date | | 5/1/1978 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | SDP1977-10016
|
|
Description | | Proposed: Construct a 19x32 ft concrete slab with roof for holding and culturing shellfish
|
|
Last Name | | WA STATE DEPT OF FISHERIES
|
|
Received Date | | 11/14/1977 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1975-10017
|
|
Description | | Construction of a concrete clam rearing pond
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 8/26/1975 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1972-10009
|
|
Description | | Shellfish laboratory
|
|
Last Name | | STATE DEPARTMENT OF FISHERIES
|
|
Received Date | | 1/20/1972 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1972-00006
|
|
Description | | Install a mooring buoy at the Shellfish Lab at Point Whitney.
|
|
Last Name | | DEPARTMENT OF FISHERIES
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1973-00005
|
|
Description | | Riprap replacement
|
|
Last Name | | DEPARTMENT OF FISHERIES
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1979-00015
|
|
Description | | Using Sevin (chemical) as treatment of intertidal oyster beds.
|
|
Last Name | | WESTLEY
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|