Case Number:SDP2022-00014 Case Status:Approved Date Received:5/23/2022
Description:Construction of a wastewater facility serving the Port Hadlock/Irondale Urban Growth Area (UGA). Project elements include construction of a pressure sewer system for wastewater collection, installation of two modular membrane bioreactor (MBR) wastewater treatment units for a treatment facility using ultraviolet (UV) disinfection and producing Class A reclaimed water for land application & groundwater recharge via a percolation pond, and solids and/or decanted solids staged on-site before hauling for off-site handling. The Phase 1 facility startup design is 0.090 million gallons per day (MGD) of treatment capacity serving the initial project service area (estimated in 2024). Construction duration is anticipated to be about 24 months. The wastewater facility will occupy approximately 3 acres of a 25.6-acre site owned by Jefferson County. The system design is approved by Washington Department of Ecology to meet regulatory requirements and population growth in the UGA through 2041. The initial Phase 1 service area is the Port Hadlock Commercial Core Area along State Route 116 and Chimacum Rd. The Department of Community Development (DCD) is reviewing the permit in accordance with Chapter 18.18 JCC, beginning as a conditional discretionary (C(d)) permit approval process. DCD anticipates final approval of the project under an administrative conditional use permit (C(a)). The project has undergone review under the State Environmental Policy Act (SEPA). DCD is using the Optional DNS Process outlined in WAC 197-11-355. Date Issued:11/30/2022
Applicant:MONTE REINDERS Expiration Date:11/30/2024 12:00:00 AM
Site Address: LOPEMAN RD Case Finaled:
Parcel No:901023006 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Approve SDP Permit-UF
Date Completed: 11/30/2022
Disposition:
Description: (F) SEPA Threshold (DNS) +14
Date Completed: 11/30/2022
Disposition: DONE
Description: Notice of App/Optional DNS +30
Date Completed: 11/30/2022
Disposition: DONE
Description: Consistency Review-U
Date Completed: 11/30/2022
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 11/30/2022
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 11/30/2022
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 11/30/2022
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 11/30/2022
Disposition: DONE
Description: App Substantially Complete-U
Date Completed:
Disposition:
Description: Case Entered
Date Completed: 5/23/2022
Disposition: