Case Number | | SDP2022-00014
|
|
Description | | Construction of a wastewater facility serving the Port Hadlock/Irondale Urban Growth Area (UGA). Project elements include construction of a pressure sewer system for wastewater collection, installation of two modular membrane bioreactor (MBR) wastewater treatment units for a treatment facility using ultraviolet (UV) disinfection and producing Class A reclaimed water for land application & groundwater recharge via a percolation pond, and solids and/or decanted solids staged on-site before hauling for off-site handling.
The Phase 1 facility startup design is 0.090 million gallons per day (MGD) of treatment capacity serving the initial project service area (estimated in 2024). Construction duration is anticipated to be about 24 months. The wastewater facility will occupy approximately 3 acres of a 25.6-acre site owned by Jefferson County. The system design is approved by Washington Department of Ecology to meet regulatory requirements and population growth in the UGA through 2041. The initial Phase 1 service area is the Port Hadlock Commercial Core Area along State Route 116 and Chimacum Rd. The Department of Community Development (DCD) is reviewing the permit in accordance with Chapter 18.18 JCC, beginning as a conditional discretionary (C(d)) permit approval process. DCD anticipates final approval of the project under an administrative conditional use permit (C(a)). The project has undergone review under the State Environmental Policy Act (SEPA). DCD is using the Optional DNS Process outlined in WAC 197-11-355.
|
|
Last Name | | REINDERS
|
|
Received Date | | 5/23/2022 10:42:11 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | ZON2022-00018
|
|
Description | | Construction of a wastewater facility serving the Port Hadlock/Irondale Urban Growth Area (UGA). Project elements include construction of a pressure sewer system for wastewater collection, installation of two modular membrane bioreactor (MBR) wastewater treatment units for a treatment facility using ultraviolet (UV) disinfection and producing Class A reclaimed water for land application & groundwater recharge via a percolation pond, and solids and/or decanted solids staged on-site before hauling for off-site handling.
The Phase 1 facility startup design is 0.090 million gallons per day (MGD) of treatment capacity serving the initial project service area (estimated in 2024). Construction duration is anticipated to be about 24 months. The wastewater facility will occupy approximately 3 acres of a 25.6-acre site owned by Jefferson County. The system design is approved by Washington Department of Ecology to meet regulatory requirements and population growth in the UGA through 2041. The initial Phase 1 service area is the Port Hadlock Commercial Core Area along State Route 116 and Chimacum Rd. The Department of Community Development (DCD) is reviewing the permit in accordance with Chapter 18.18 JCC, beginning as a conditional discretionary (C(d)) permit approval process. DCD anticipates final approval of the project under an administrative conditional use permit (C(a)). The project has undergone review under the State Environmental Policy Act (SEPA). DCD is using the Optional DNS Process outlined in WAC 197-11-355.
|
|
Last Name | | JEFFERSON COUNTY
|
|
Received Date | | 5/23/2022 10:32:23 AM
|
|
Status | | Approved
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | PRE2022-00003
|
|
Description | | Port Hadlock Wastewater Facility conditional use permit pre-application conference.
|
|
Last Name | | JEFFERSON COUNTY
|
|
Received Date | | 1/24/2022 2:07:09 PM
|
|
Status | | Pending
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | ZON2021-00021
|
|
Description | | SEPA for Port Hadlock Sewer Plant Plan
|
|
Last Name | | JEFFERSON COUNTY PUBLIC WORKS
|
|
Received Date | | 3/31/2021 11:52:58 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | BLD2013-00342
|
|
Description | | HADLOCK WASTE WATER FACILITY, TREATMENT FACILITY
|
|
Last Name | | JEFFERSON COUNTY
|
|
Received Date | | 10/31/2013 9:53:50 AM
|
|
Status | | Canceled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2013-00043
|
|
Description | | CONDITIONAL USE PERMIT *ZON13-00045
|
|
Last Name | | JEFFERSON COUNTY
|
|
Received Date | | 10/9/2013 4:55:39 PM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | ZON2013-00045
|
|
Description | | CONDITIONAL USE PERMIT *hadlock waste water facility
|
|
Last Name | | JEFFERSON COUNTY
|
|
Received Date | | 10/9/2013 4:52:39 PM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | ZON2013-00044
|
|
Description | | PERCOLATION POND/STORMWATER **third parcel incomplete...needs to be attached 90111201...
|
|
Last Name | | JEFFERSON COUNTY
|
|
Received Date | | 10/9/2013 4:24:10 PM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | BLD2013-00322
|
|
Description | | ADMINISTRATION BUILDING FOR HADLOCK WASTE WATER FACILITY.
|
|
Last Name | | JEFFERSON COUNTY
|
|
Received Date | | 10/9/2013 2:09:15 PM
|
|
Status | | Canceled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | PRE2012-00020
|
|
Description | | CONSTRUCT CENTRALIZED WASTEWATER TREATMENT/RECLAIMED WATER FACILITY AND COLLECTION SYSTEM FOR THE IRONDALE/PORT HADLOCK URBAN GROWTH AREA
|
|
Last Name | | JEFFERSON COUNTY PUBLIC WORKS
|
|
Received Date | | 9/27/2012 10:27:05 AM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | RAP2012-00010
|
|
Description | | Tree removal - Upland Ct within County Property APN 901023006
|
|
Last Name | | SUKERT
|
|
Received Date | | 4/5/2012 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2602899
|
|
Description | | Forest practice application.
|
|
Last Name | | LOPEMAN
|
|
Received Date | | 9/15/1999 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|