Permit Case Summary

Case Number: Search Help

Case Number:SDP2014-00016 Case Status: Date Received:7/18/2014
Description:HOOD CANAL BRIDGE State Route 104 Special Repair- Replace Anchor Cables JARPA included Date Issued:9/25/2014
Applicant: STATE OF WASHINGTON-DOT Expiration Date:9/25/2019 12:00:00 AM
Site Address:HWY 104 Case Finaled:
Parcel No:000000220 Other Cases Parcel Data Map It Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: File Archived
Date Completed: 11/6/2019
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 9/25/2014
Disposition:
Description: Approve Exemption-UF
Date Completed: 9/25/2014
Disposition: DONE
Description: DRD Review Complete-U
Date Completed: 9/25/2014
Disposition: DONE
Description: DRD Reviewer Letter (F)
Date Completed: 9/8/2014
Disposition:
Description: DCD Review Time
Date Completed: 9/8/2014
Disposition:
Description: RAP Review Complete-U
Date Completed: 9/24/2014
Disposition: DONE
Description: Consistency Review-U
Date Completed: 9/24/2014
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 9/24/2014
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 9/24/2014
Disposition: DONE
Description: App Substantially Complete-U
Date Completed:
Disposition:
Description: Case Entered
Date Completed: 7/23/2014
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Vessel maintenance activities
Wording Vessel maintenance activities which may cause water pollution, including hull chipping and painting, shall be performed at designated facilities.

Title: Discharge oil: state & fed regs
Wording The proponents shall comply with all relevant state and federal regulations pertaining to the discharge of oil.

Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: Progress towards completion
Wording Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.

Title: Exempt Maintenance Condition
Wording The development shall be essentially the same as the original in location, size, configuration, and external appearance.

Title: 18.25.520 JCC--TRANSPORTATION
Wording Maintenance and repair of existing roads in shoreline jurisdiction shall use all resonable methods to minimize adverse impacts on nearby shorelines.

Title: Hydraulic Code/HPA Check
Wording Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.

Title: Army Corps Check
Wording Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on (date) for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present in the project area: Priority Habitat--Coastal Salt Marshes.

Title: F-DNS Issued
Wording The project was reviewed under the State Environmental Policy Act (SEPA) by Washington State Department of Transportationacting as lead agency. Determination of Non-Significance (DNS) issued on June 6, 2014.

Title: F-Site Plan Changes
Wording The site plan as submitted with the Shoreline Exemption application on July 18, 2014 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated September 24, 2014 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-SDP Exemption Section
Wording The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section 18.25.560 (2) -- Maintenance and Repair, and is consequently exempt from the substantial development permit (SDP) requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.