Permit Case Summary

Case Number: Search Help

Case Number:SDP2009-00076 Case Status: Date Received:10/8/2009
Description:Shoreline substantial development application for an "after-the-fact" permit to anchor a 135-foot by 35-foot barge in Hood Canal during the Hood Canal Bridge closure. The barge was placed in Hood Canal for 30 days from May 7 through June 6, 2009. Lines were used to anchor the barge in the water and to attach it to an existing timber wingwall. The barge was used as a temporary breakwater to reduce wave action for public safety at the South Point Passenger-Only Ferry (POF) facility. The proposal is subject to the State Environmental Policy Act (SEPA). Washington State Department of Transportation (WSDOT), as the SEPA lead agency, issued a Determination of Non-significance (DNS) and Adoption of Existing Environmental Document on June 2, 2002 for the Hood Canal Bridge retrofit and replacement project, which included the temporary South Point POF operations. Date Issued:5/3/2010
Applicant: STATE OF WASHINGTON-DOT Expiration Date:5/3/2012 12:00:00 AM
Site Address:173 S BEACH DR Case Finaled:
Parcel No:950100817 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: File Archived
Date Completed: 4/6/2018
Disposition: DONE
Description: Approve SDP Permit-UF
Date Completed: 5/3/2010
Disposition: DONE
Description: Hearing Date
Date Completed: 5/3/2010
Disposition: DONE
Description: Hearing Exam PH Notice-Pub-UF
Date Completed: 3/25/2010
Disposition: DONE
Description: Hearing Exam PH Notice-APO-UF
Date Completed: 3/25/2010
Disposition: DONE
Description: DRD Reviewer Letter (F)
Date Completed: 12/17/2009
Disposition:
Description: Ntc of App +30-Publish-UF
Date Completed: 12/17/2009
Disposition: DONE
Description: Ntc of App +30-APO-UF
Date Completed: 12/17/2009
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 12/8/2009
Disposition: DONE
Description: Case Entered
Date Completed: 10/12/2009
Disposition:
Description: Septic Review Complete-U
Date Completed: 12/8/2009
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 12/8/2009
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 12/17/2009
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 12/17/2009
Disposition: DONE
Description: Consistency Review-U
Date Completed: 5/3/2010
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 12/8/2009
Disposition: DONE



Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Custom Universal Finding
Wording Staff findings are presented in the staff report prepared March 31, 2010 and Hearing Examiner findings are presented in the Hearing Examiner Report and Decision, which was signed and dated April 27, 2010. Based on these findings, no conditions of approval are required for this after-the-fact permit to place a barge in Hood Canal.