Case Number | | SDP2009-00076
|
|
Description | | Shoreline substantial development application for an "after-the-fact" permit to anchor a 135-foot by 35-foot barge in Hood Canal during the Hood Canal Bridge closure. The barge was placed in Hood Canal for 30 days from May 7 through June 6, 2009. Lines were used to anchor the barge in the water and to attach it to an existing timber wingwall. The barge was used as a temporary breakwater to reduce wave action for public safety at the South Point Passenger-Only Ferry (POF) facility.
The proposal is subject to the State Environmental Policy Act (SEPA). Washington State Department of Transportation (WSDOT), as the SEPA lead agency, issued a Determination of Non-significance (DNS) and Adoption of Existing Environmental Document on June 2, 2002 for the Hood Canal Bridge retrofit and replacement project, which included the temporary South Point POF operations.
|
|
Last Name | | STATE OF WASHINGTON-DOT
|
|
Received Date | | 10/8/2009 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | PRE2009-00020
|
|
Description | | TEMPORARY PLACEMENT OF A BARGE AT SOUTHPOINT TO ACT AS BREAKWATER FOR THE PASSING ONLY FERRY FACILITY
|
|
Last Name | | STATE OF WASHINGTON-DOT
|
|
Received Date | | 6/9/2009 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2008-00516
|
|
Description | | TEMPORARY BUS SHELTER @ SOUTH PT FERRY DOCK (thru approximately June 15, 2009)
|
|
Last Name | | STATE OF WASHINGTON-DOT
|
|
Received Date | | 12/24/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE2008-00030
|
|
Description | | Proposal to install 2 temporary shelters and sanicans during hood canal bridge closure.
|
|
Last Name | | ZEIGLER
|
|
Received Date | | 6/25/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | USR2003-00088
|
|
Description | | decommissioning, see photos in file.
|
|
Last Name | | STATE OF WASHINGTON-DOT
|
|
Received Date | | 9/24/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2002-00039
|
|
Description | | Passenger Only Ferry Facility at South Point in conjunction with Hood Canal Bridge Repair anticipated in 2006.
|
|
Last Name | | WA ST DOT
|
|
Received Date | | 8/12/2002 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | EXM1994-00010
|
|
Description | |
|
|
Last Name | | PEDERSON
|
|
Received Date | | 2/22/1994 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP1985-00009
|
|
Description | | Net pens, on land and in water
|
|
Last Name | | PEDERSON
|
|
Received Date | | 6/3/1985 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | SDP1976-10027
|
|
Description | | Locate a building on a barge for the purpose of producing oyster seed to start a shellfish hatchery.
|
|
Last Name | | SEA FARMS, INC
|
|
Received Date | | 6/14/1976 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1979-10006
|
|
Description | | Construction of timber trestle, wingwalls, towers and pile dolphins to establish vehicular ferry service at Southpoint due to the loss of the Hood Canal.
|
|
Last Name | | DIVISION OF MARINE TRANSPORT
|
|
Received Date | |
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | SDP1979-10014
|
|
Description | | Create a dock with ramp and float assembly for temporary, overnight, transient pleasure craft moorage with upland day use area from an existing temporary car-ferry landing site.
|
|
Last Name | | PEDERSON
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1979-00004
|
|
Description | | Southpoint-Lofall emergency passenger service
|
|
Last Name | | RENNIE
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|