Permit Case Summary

Case Number: Search Help

Case Number:SDP2007-00074 Case Status:Finaled Date Received:10/24/2007
Description:This project seeks to reduce accidents on segments of highways that have a history of run off the road crashes that result in injuries, with the primary focaus on fatal and disabling run off the road injuries. Safety improvements include installing guardrail, slope flattening, tree removal, stump grinding, delineation, signing and rumble strips. All work will be confined to WSDOT right-of-way. Shorelines within 200' in Jefferson County are Puget Sound on US 101 from Mile Post 305.51 to MP 305.61, MP 307.42 to MP 307.72 and MP 309.88 to MP 309.97. Date Issued:3/5/2008
Applicant: STATE OF WASHINGTON-DOT Expiration Date:3/5/2009 12:00:00 AM
Site Address:HWY 101 Case Finaled:
Parcel No:000000220 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 8/23/2013
Disposition: DONE
Description: Close case
Date Completed: 8/23/2013
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 1/25/2008
Disposition: DONE
Description: Review Complete-U
Date Completed: 1/25/2008
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 1/25/2008
Disposition: DONE
Description: Case Entered
Date Completed: 10/25/2007
Disposition:
Description: Septic Review Complete-U
Date Completed: 1/25/2008
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 1/25/2008
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 1/25/2008
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 1/25/2008
Disposition: DONE
Description: Consistency Review-U
Date Completed: 1/25/2008
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 1/25/2008
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Notification Prior to Beginning
Wording The proponent shall notify the Jefferson County Department of Community Development at (360) 379-4450 forty-eight (48) hours prior to commencing construction in order to allow monitoring and ensure compliance with permit conditions.

Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: Progress towards completion
Wording Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.

Title: Exempt Maintenance Condition
Wording The development shall be essentially the same as the original in location, size, configuration, and external appearance.

Title: No Fill or Other Material
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: SPILL PREVENTION
Wording To ensure that no petroleum products or other construction materials enter Puget Sound, a spill prevention control and countermeasures plan shall be developed and submitted to the Department of Community Development prior to commencement of on-site project activites and implemented during construction.

Title: BIOLOGICAL ASSESSMENT
Wording A Biological Assessment shall be submitted to the Department of Community Development prior to commencement of on-site project activities

Title: Identify Wetland Buffer
Wording A temporary physical separation along the upland boundary of the wetland buffer area shall be installed and maintained during construction activites. Such separation can include orange barrier construction fencing, silt fence, logs or any other prominent physical marking approved by the UDC Administrator.

Title: Mark Wetland Buffer Drng Cnstrctn
Wording Buffer perimeters shall be marked with temporary signs at an interval of one per parcel or every one hundred (100) feet, whichever is less. Signs shall contain the following statement: "Wetland & Buffer - Do Not Remove or Alter Existing Vegetation."

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Stormwater Plan
Wording A Temporary Erosion Control Plan (TESC) to include spill prevention control and countermeasures will be submitted prior to commencement of on-site project activites. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted TESC plan. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-NO IMPACTS TO WETLANDS
Wording All of the work will take place within the roadway prism and there will be no impacts to wetlands. The proposed activites are exempt from wetland protection standards or requirement for wetland studies per JCC 18.15.335(1)(a) & (2)(b).

Title: F-ESA EXEMPT
Wording The proposed activities are exempt from the requirements of Article VI-D Environmentally Sensitive Area Districts per JCC 18.15.210(5)

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on January 11, 2008 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Wetlands.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(3).

Title: F-Site Plan Changes
Wording The site plan as submitted with the Shoreline Exemption application on October 24, 2008 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated January 25, 2008 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-APPROVAL FOR SDP EXMPT ONLY
Wording This approval is for a Shoreline Exemption only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-SDP Exemption Section
Wording The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section JCC 18.25.090(6) and is consequently exempt from the substantial development permit (SDP) requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.