Permit Case Summary

Case Number: Search Help

Case Number:SDP2007-00014 Case Status: Date Received:3/12/2007
Description:Shoreline Exemption for maintenance of State Route 101 in the vicinity of West Uncas Rd. to the vicinity of Fuller Rd. The proposed project is within 200 ft of Snow Creek which is a Type 1 Stream and has a Conservancy Shoreline Designation. The construction activities include prelevel and overlay of the existing pavement, permanent signing, striping and pavement markings, pavement grinding, raising nine catch basins and centerline rumble strips. Date Issued:5/9/2007
Applicant: STATE OF WASHINGTON-DOT Expiration Date:5/9/2009 12:00:00 AM
Site Address:HWY 101 Case Finaled:
Parcel No:000000220 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: File Archived
Date Completed: 2/17/2012
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 5/9/2007
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 10/19/2007
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 5/9/2007
Disposition: DONE
Description: Review Complete-U
Date Completed: 5/9/2007
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 4/24/2007
Disposition: DONE
Description: Case Entered
Date Completed: 3/14/2007
Disposition:
Description: Septic Review Complete-U
Date Completed: 4/24/2007
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 4/24/2007
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 4/24/2007
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 5/9/2007
Disposition: DONE
Description: Consistency Review-U
Date Completed: 5/9/2007
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 4/24/2007
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Discharge oil: state & fed regs
Wording The proponents shall comply with all relevant state and federal regulations pertaining to the discharge of oil.

Title: Notification Prior to Beginning
Wording The proponent shall notify the Jefferson County Department of Community Development at (360) 379-4450 forty-eight (48) hours prior to commencing construction in order to allow monitoring and ensure compliance with permit conditions.

Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: Treated Materials Must be Cured
Wording All lumber and other materials treated with preservative shall be sufficiently cured to minimize leaching into the water or shore bed, in accordance with the Best Management Practices approved by the Washington Department of Fish and Wildlife.

Title: Site Plan
Wording Construction shall be in substantial compliance with the site plan submitted on March 12, 2007 as it exists now or is hereafter amended by Jefferson County and/or the Washington Department of Ecology.

Title: Progress towards completion
Wording Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.

Title: Exempt Maintenance Condition
Wording The development shall be essentially the same as the original in location, size, configuration, and external appearance.

Title: No Fill or Other Material
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: JCC 18.25.440 (2)(C)
Wording All debris, overburden, and other waste materials from construction shall be disposed in such a way to prevent their entry by erosion from drainage, high water or other means into any water body.

Title: JCC 18.25.440 (Q)
Wording No machinery shall operate within a stream bed except in compliance with a hydraulics permit issued by the Washington Dept. of Fish and Wildlife.

Title: JCC 18.25.440(P)
Wording Excess material shall be depostied in stable locations and not into stream corridors where such materials degrade water quality, impede floodwaters, or alter naturally occurring geohydraulic processes.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Hydraulic Code/HPA Check
Wording Randi Thurston from WDFW made the following comment via e-mail on May 7, 2007, "It doesn't appear that a HPA to be issued by WDFW is required for this project. WDFW has no other comments at this time."


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-JCC 18.15.210 (5)
Wording JCC 18.15.210 lists general exemptions from the Environmentally Sensitive Areas Districts. JCC 18.15.210(5) exempts normal and routine maintenance or repair of existing utility structures within a right-of-way or existing utility corridor or easements, including the cutting, removal and/or mowing of vegetation above the ground. Staff finds this project meets the above exemption.

Title: F-SENT TO AGENCIES FOR COMMENTS
Wording On April 24, 2007 staff sent this proposal to the Washington Dept. of Fish and Wildlife (WDFW) and the Washington State Dept. of Ecology Shorelands Office.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on April 23, 2007 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review, the following ESAs were confirmed to be present on the subject property: Shoreline Designation -- Conservancy, Type 1 Stream (Snow Creek), Type 3 Stream, Type 5 Stream, Osprey, Wetlands, Seismic Hazard Area, Erosion Hazard Area, Susceptible Aquifer Recharge Area.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-Geohazard Area
Wording Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.

Title: F-Adjacent Forest Land Disclosure
Wording Jefferson County has determined that the use of real property for agriculture and forestry operations is a high priority and favored use in the county. The county will not consider to be a nuisance those inconveniences or discomforts arising from such operations, if such operations are consistent with commonly accepted best management practices in compliance with local, state, and federal laws. If your real property includes or is within five hundred (500) feet of real property designated as Rural Residential 1:10 or 1:20, Rural Industrial, Rural Commercial, Agriculture, or Forestry, you may be subject to inconveniences or discomforts arising from such farming and forestry operations, including but not limited to noise, tree removal, odors, flies, fumes, dust, smoke, the operation of farm and forestry machinery during any 24-hour period, the storage and disposal or manure, and the application of permitted fertilizers and permitted pesticides. One or more of these inconveniences may occur as a result of agricultural and forestry operations which are in conformance with existing laws and regulations.

Title: F-Streams
Wording Type 1 (Snow Creek) Stream, Type 3 Stream and Type 5 Stream (Fish and Wildlife Habitat Area) have been identified within the project area.

Title: F-SEPA Exempt
Wording Washington State Department of Transportation is the SEPA Lead Agency. They have determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 468-12-800(1)(u).

Title: F-Site Plan Changes
Wording The site plan as submitted with the shoreline exemption application on March 12, 2007 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated May 9, 2007 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a shoreline exemption for maintenance and repair of SR 101 Mile Post 283.83 to Mile Post 285.16 within the existing road right-of way only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-SDP Exemption Section
Wording The Development Review Division finds that this proposal is consistent with Shoreline Master Program JCC 18.25.090(6) and is consequently exempt from the substantial development permit (SDP) requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.