Case Number:SDP2006-00024 Case Status:Finaled Date Received:6/28/2006
Description:SDP Exemption - this project will retrofit the Portage Canal Bridge rail, replace the guardrail and anchors at the ends of the bridge and widen the shoulder at the southwest end of the bridge to accommodate the new guardrail. Shoulder widening will relocate 100 feet of the ditch. The shoulder widening and ditch relocation will require 50 cubic yards of excavation and 30 cubic yards of fill. This area will be reseeded and fertilized after the guardrail installation is complete. The bridge rail retrofit will add Thrie Beam guardrail to the outside of the existing guardrail, and will require a small amount of welding and paint removal. Containment systems will be in place. Equipment required includes a backhoe excavator, compactor, guardrail drill rig, dump trucks, utility trucks and a small paver. Chapter 18.20.090(6) JCC of the Shoreline Management Master Program (SMMP) exempts this project for normal repair and maintenance. The processing of a shoreline exemption still requires compliance with the SMMP. The proposal is exempt from the Washington State Environmental Policy Act (SEPA) as there will be no work below the Ordinary High Water Mark (OHWM). Date Issued:7/27/2006
Applicant: STATE OF WASHINGTON-DOT Expiration Date:7/27/2008 12:00:00 AM
Site Address:SR 116 Case Finaled:
Parcel No:000000220 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 8/22/2013
Disposition: DONE
Description: Close case
Date Completed: 8/22/2013
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 7/27/2006
Disposition: DONE
Description: Review Complete-U
Date Completed: 7/27/2006
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 7/24/2006
Disposition: DONE
Description: Case Entered
Date Completed: 6/30/2006
Disposition:
Description: App Substantially Complete-U
Date Completed: 7/24/2006
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 7/26/2006
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 7/26/2006
Disposition: DONE
Description: Consistency Review-U
Date Completed: 7/27/2006
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: C-MIN REQ #2
Wording The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements #1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-ESA
Wording This repair activity is exempt from review of Environmentally Sensitive Areas under Chapter 18.15.210 JCC.

Title: F-SHORELINE
Wording The Washington Department of Transportation is seeking to make minor improvements to the state highway, portions of which are within 200 feet of a Shoreline Regulated by the Jefferson County Shoreline Management Master Program. Therefore, the proposed repair activity for State Highway is exempt under Chapter 18.20.090(6) JCC Shoreline Management Master Plan (SMMP), which is normal repair and maintenance. The processing of a shoreline exemption still requires compliance with the SMMP.

Title: F-Stormwater
Wording The repair of the existing highway would result in minor increases in the amount impervious surface and land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal shall adhere to Best Management Practices.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(2)(c) & 197-11-800(3) because this project entails minor repair and maintenance of an existing Highway.

Title: F-Site Plan Changes
Wording The site plan as submitted with the Shoreline Exemption Permit application on June 28, 2006 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated July 26, 2006 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-APPROVAL FOR R & MONLY
Wording This approval is for the repair of State Highway 116, which would entail repair/resurfacing of pavement, guardrail improvments including fill, reconfigure drainage ditches, and other associated activities only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.