Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
11/29/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Close case
|
|
Date Completed:
|
| | |
11/29/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Exemption-UF
|
|
Date Completed:
|
| | |
8/12/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
8/12/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
6/29/2005
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
8/12/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
8/12/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
8/12/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
8/12/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
8/12/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Treated Materials Must be Cured
|
|
Wording
|
| | |
All lumber and other materials treated with preservative shall be sufficiently cured to minimize leaching into the water or shore bed, in accordance with the Best Management Practices approved by the Washington Department of Fish and Wildlife.
|
|
|
Title:
|
| | |
No Fill or Other Material
|
|
Wording
|
| | |
No fill or other material may be placed in the waters or intertidal areas of Jefferson County.
|
|
|
Title:
|
| | |
C-MITIGATION
|
|
Wording
|
| | |
The mitigation outline as part of the JARPA application shall be implemented.
A general summary of the mitigation include: Reducing the thickness of the ramp from 14 to 6 inches thick; Removal of rip-rap, concrete & asphalt and replacing it with logs; removal of angular rock in the inter-tidal area; replacing rock, asphalt, and non-native vegetation with native trees & shrubs along the shoreline; and off-site removal of oyster shell & longlines in eelgrass areas in Quilcene Bay.
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
Stormwater Plan
|
|
Wording
|
| | |
A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.
|
|
|
Title:
|
| | |
Hydraulic Code/HPA Check
|
|
Wording
|
| | |
Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.
|
|
|
Title:
|
| | |
Comply with HPA
|
|
Wording
|
| | |
In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.
|
|
|
Title:
|
| | |
Army Corps Check
|
|
Wording
|
| | |
Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.
|
|
|
Title:
|
| | |
F-NATURE OF PROPOSAL
|
|
Wording
|
| | |
Because this structure was established prior to the adoption of the UDC it is exempt from review of Environmentally Sensitive Areas under Section 3.6.4(g) of the Jefferson County Unified Development Code.
Activities located landward of the OHWM are primarily to enhance the shoreline area. No trees would be removed as part of this proposal so impacts to eagle & owl habitat are not applicable for this proposal.
Activities related below the OHWM are addressed by this permit, a HPA required from WDFW, and Section 10 & 404 Permits required from the the Corp of Engineers. The mitigation included as part of this proposal is found in the shoreline section of this permit.
|
|
|
Title:
|
| | |
F-SMMP EXEMPTION
|
|
Wording
|
| | |
This permit addresses shoreline permits from Jefferson County Department of Community Development.
The Washington State Department of Fish & Wildlife (WDFW) Point Whitney Boat ramp was establish prior to the 1960's. This facility is located in an area designated Aquatic & Conservancy by the Jefferson County Shoreline Management Master Program (SMMP).
The current boat ramp is 10 feet wide by 110 feet long and is 14 inches think. The proposed boat ramp would be 12 feet wide by 134 feet long by 6 inches thick. The purpose of the replacement of the boat ramp is to repair the aging boat ramp, provide safer conditions when boaters are backing up, and to allow boats to launch during lower tides. Allowing boaters to launch during lower tides would provide the general public greater access to the Shorelines such as Dabob Bay. The proposal would also improve the existing conditions by extending the ramp into areas where prop scouring is eroding the tidal areas and by reducing the thickness of the boat ramp would minimize the impact of the boat ramp on littoral drift in the area.
This proposal will require a HPA from WDFW and a Section 10 & 404 permits from the Corp of Engineers. The applicant has been working with WDFW and the Corp of Engineers to ensure that the proposal will not impact fish or their habitat. To mitigate for the lose of habitat that the additional two foot in width and 24 feet in length the applicant is proposing the following mitigation.
The removing rip rap, concrete, and asphalt and replacing it with large woody debris above the high tide line (MHHW) for an approximately 130 foot area located southeast boat ramp. In addition, 1,554 sq. ft of tideland from elevation 12 down to minus 2 or to eelgrass whichever is higher, will be enhanced by the removal of all angular rock 4 inches or larger. The proposal will also remove rock and non-native vegetation from a 900 sq. ft area and replace it with native trees and shrubs. Finally, the proposal is planning on performing off-site mitigation in the form of removal of oyster shells and long lines from an approximate 1,200 sq. ft of eel grass areas in Quilcene Bay. The purpose of the mitigation is to ensure that there is no net loss to fish & wildlife habitat from the proposal. The design nature of the proposal to enhance the public access to the Shoreline and mitigation measures included as part of the proposal were factored into the decision of the shoreline process for the proposal.
This project repair/replacement of the existing boat ramp to a similar condition that existed prior to the damage from the tidal action & the elements have had on the facility. Therefore, the proposed repair/replacement activity for WDFW Point Whitney boat ramp facility in Dabob Bay is exempt under Section 3.402(6) County Shoreline Management Master Plan (SMMP), which is normal repair and maintenance. The processing of a shoreline exemption still requires compliance with the SMMP.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on August 12, 2005 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Type 1 Stream ( Aquatic & Conservancy), fish habitat related to a marine shoreline, eagle & Owl habitat, floodplain, coastal SIPZ, Susceptible Aquifer Recharge, and stormwater.
|
|
|
Title:
|
| | |
F-Buffers
|
|
Wording
|
| | |
Buffers are areas that shall be maintained in their natural condition, however, minor pruning or alteration of vegetation may be permitted as long as the function and character of the buffer are not diminished.
|
|
|
Title:
|
| | |
F-Native Vegetation List
|
|
Wording
|
| | |
Among the native conifer species which may be used in buffers or for re-vegetation include, but are not limited to: Grand Fir (Aibes grandis), Sitka Spruce (Picea Sitchensis), Shore Pine (Pinus Contorta), Douglas Fir (Pseudotsuga Menziesii), Western Red Cedar (Thuja Plicata), and Western Hemlock (Tsuga Heterophylla).
Among native tree species which may be used includes: Vine Maple (Acer Circinatum), Big-Leaf Maple (Acer Macrophyllum), Red Alder (Alnus Rubra), Pacific Madrone (Arbutus Menziesii), Quaking Aspen (Populus Tremula), Black Cottonwood (Populus Trichocarpa), Bitter Cherry (Prunus Emarginata), Oregon White Oak (Quercus Garryana), Cascara (Rhamnus Purshiana), Pacific Willow (Saliz Lasiandra), and Scouler's Willow (Saliz Scouleriana).
Among the native shrub species which may be used are: Sevice-Berry (Amalanchier Alnifolia), Red Osier Dogwood (Cornus Stolonifera) Salal (Gaultheria Shallon), Ocean Spray (Holodiscus Discolor), Indian Plum (Oemlaria Cerasiformis), Pacific Ninebark (Physocarpus Capitus), Red Flowering Currant (Ribes Sanguineum), Wild Rose (Rosa Nutkana), Swamp Rose (Rosa Pisocarpa), Willows (Salix ssp.), Red Elderberry (Sambucus Racemosa), Snowberry (Symphoricarpos Albus), Evergreen Huckleberry (Vaccinium Ovatum), Red Huckleberry (Vaccinium Parvifolium).
|
|
|
Title:
|
| | |
F-Stormwater
|
|
Wording
|
| | |
The applicant is proposing to create or add less than 2,000 square feet of impervious surface and less than 7,000 square feet of land disturbing activities. New impervious would be about 500 sq. ft of new concrete boat ramps and the removal of rock from the beach & inter-tidal area would reduce impervious surface. The removal of rip rap, concrete, and asphalt & replacement with large woody debris and trees & shrubs is not considered land disturbing activity. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a Stormwater Plan for a Small Project, which are Construction Best Management Practices (attached).
|
|
|
Title:
|
| | |
F-DNS Issued
|
|
Wording
|
| | |
Reviewed under the State Environmental Policy Act (SEPA) by WDFW acting as lead agency. Determination of Non-Significance (DNS) issued on October 19, 2004. This satisfies the SEPA review for this proposal.
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the Shoreline Exemption application on January 19, 2005 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan and JARPA dated August 12, 2005 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for the repair/reconstruction of the Point Whitney Boat Ramp in compliance with the JARPA submitted with this application only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|