Permit Case Summary

Case Number: Search Help

Case Number:SDP2005-00009 Case Status:Finaled Date Received:3/17/2005
Description:HOH RIVER EROSION LOG JAM PLACEMENT PROJECT- On March 10, 2004 this proposal was declared an emergency by The Federal Highway Administration (FHWA), a Shoreline Exemption (SDP 04-09) was issued by DCD of June 9, 2004 and the work was completed in October 2004. A SEPA checklist was prepared and a determination of non-significance (DNS) was issued on March 17, 2004. This project impacted 366,500 sq ft of the Hoh River and its floodplain. This proposal entailed twelve engineered logjams consisting of four mid-channel structures, six deflector structures and two intermediate structures. This project also included mitigation measures as part of the WDFW Hydraulic Project Approvals (HPA) as well other required permits (such as Corp Permits) that already have been obtained. This proposal is considered is Landfill (JCC 08.25.350) and Shore Defense (JCC 18.25.430) which require a Shoreline Conditional Use Permit and Substantial Development Permit for these uses within the Aquatic designation (i.e. waterward of the OHWM) in this section of the Hoh River designated Conservancy. Date Issued:1/5/2007
Applicant: STATE OF WASHINGTON-DOT Expiration Date:1/5/2009 12:00:00 AM
Site Address:HWY 101 Case Finaled:
Parcel No:000000220 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 2/22/2007
Disposition: DONE
Description: Close case
Date Completed: 2/22/2007
Disposition: DONE
Description: Issue SDP Permit
Date Completed: 1/5/2007
Disposition: DONE
Description: Ntc of Dec Apprvl/Appl Inst-UF
Date Completed: 1/5/2007
Disposition: DONE
Description: Hearing Exam PH Notice-Pub-UF
Date Completed: 11/20/2006
Disposition: DONE
Description: Hearing Exam PH Notice-APO-UF
Date Completed: 11/20/2006
Disposition: DONE
Description: Ntc of App +14-Publish-U
Date Completed: 11/20/2006
Disposition: DONE
Description: Ntc of App +14-APO-U
Date Completed: 11/20/2006
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 1/5/2007
Disposition: DONE
Description: Miscellaneous action
Date Completed: 11/1/2006
Disposition: DONE
Description: Ntc of App +14-Publish-U
Date Completed:
Disposition: DONE
Description: Ntc of App +14-APO-U
Date Completed:
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 4/22/2005
Disposition: DONE
Description: Application Received-UF
Date Completed: 3/17/2005
Disposition: DONE
Description: Case Entered
Date Completed: 3/17/2005
Disposition:
Description: Septic Review Complete-U
Date Completed: 11/20/2006
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 4/22/2005
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 11/20/2006
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 1/5/2007
Disposition: DONE
Description: Consistency Review-U
Date Completed: 12/1/2006
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 1/5/2007
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: CONDITIONS
Wording 1. The Applicant shall be liable for all damages to public and private property should their structures fail (JCC18.25.110(3)(c)). 2. Jefferson County shall transmit with eight days final action taken on this application to the applicant, Washington State Department of Ecology, Washington State Attorney General's Office and any person who has requested notice. The Department of Ecology shall render its final decision approving, approving with conditions, or disapproving the permit within 30 days of the date of submittal by local government (JCC18.25.510(7)).


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: FINDINGS
Wording Refer to the Hearing Examiner Decision dated January 4, 2007.