Permit Case Summary

Case Number: Search Help

Case Number:SDP2004-00003 Case Status: Date Received:2/27/2004
Description:Shoreline Exemption to replace the dilapidated water and sewer lines. A majority of the proposal is located outside of Shoreline jurisdiction. The replacement will utilize the existing road prism and not further encroach upon the shoreline. A geotechnical report was submitted in conjunctio with the proposal. In addition, SEPA was conducted for the proposal with Washington State Parks Department acting as the lead agency. In addition, a stormwater management plan was submitted in conjunction with the proposal. The application is being reviewed under Section 3.402(6) of the Jefferson County Shoreline Master Program. Date Issued:3/13/2004
Applicant: WA STATE PARKS & REC COMMISSION Expiration Date:4/15/2005 12:00:00 AM
Site Address: .................... Case Finaled:
Parcel No:021174000 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: Review Complete-U
Date Completed: 7/6/2004
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 5/13/2004
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 4/15/2004
Disposition: DONE
Description: Ntc of App +14-Publish-U
Date Completed: 3/10/2004
Disposition: DONE
Description: Ntc of App +14-APO-U
Date Completed: 3/10/2004
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 3/8/2004
Disposition: DONE
Description: Application Received-UF
Date Completed: 2/27/2004
Disposition: DONE
Description: Case Entered
Date Completed: 2/27/2004
Disposition:
Description: Septic Review Complete-U
Date Completed: 4/15/2004
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 3/8/2004
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 4/15/2004
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 4/15/2004
Disposition: DONE
Description: Consistency Review-U
Date Completed: 4/15/2004
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 4/15/2004
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Discharge oil: state & fed regs
Wording The proponents shall comply with all relevant state and federal regulations pertaining to the discharge of oil.

Title: Notification Prior to Beginning
Wording The proponent shall notify the Jefferson County Department of Community Development at (360) 379-4450 forty-eight (48) hours prior to commencing construction in order to allow monitoring and ensure compliance with permit conditions.

Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: Treated Materials Must be Cured
Wording All lumber and other materials treated with preservative shall be sufficiently cured to minimize leaching into the water or shore bed, in accordance with the Best Management Practices approved by the Washington Department of Fish and Wildlife.

Title: Progress towards completion
Wording Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.

Title: No Fill or Other Material
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: Geotech Report Submitted
Wording A Geotechnical Report was submitted in conjunction with this application. The report addressed the stability of the geologic hazard area. The replacement of utilities will be conducted in the existing road prism and it was determined the proposal will be located in an area that is stable.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Stormwater Plan
Wording An engineered stormwater plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.

Title: Hydraulic Code/HPA Check
Wording Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.

Title: Army Corps Check
Wording Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on 3/8/04 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Eagle Habitat, shoreline (conservancy), landslide hazard areas (moderate, and low), and seismic hazard areas.

Title: F-DNS Issued
Wording The infrastructure improvement was reviewed under the State Environmental Policy Act (SEPA) by Washington State Parks acting as lead agency. Determination of Non-Significance (DNS) was issued on 3/9/04. The SEPA review encompassed two phases of improvements and was not required for the shoreline permit.

Title: F-Site Plan Changes
Wording The site plan as submitted with the Zoning/Shoreline application on 2/25/04 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 4/15/04 shall be resubmitted for review and approval by Jefferson County Department of Community Development.