Permit Case Summary

Case Number: Search Help

Case Number:SDP2003-00037 Case Status:Finaled Date Received:11/6/2003
Description:Repairs to US 101 from MP285.16 to MP 306.44. The proposal includes crack sealing, pavement repair, asphalt preleveling, guardrail repair and maintenance, pavement marking, and permanent signage. This proposal is classified by the Jefferson County Shoreline Master Program as an Exemption pursuant to Section 3.402(6). In addition, the proposal is exempt from the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(3). The proposal does include utilizing approximately 50-cubic yards of fill to be placed in Leland Creek. In addition to the Jefferson County Shoreline Permit the applicant will obtain additional permits from agencies. The permits include: - Section 404- US Army Corps - Hydraulic Project Approval- WDFW -Coastal Zone Management Certification - Department of Ecology - Water Quality Certification (401)- Department of Ecology Date Issued:1/14/2004
Applicant: STATE OF WASHINGTON-DOT Expiration Date:1/14/2005 12:00:00 AM
Site Address:HWY 101 Case Finaled:
Parcel No:000000220 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 1/24/2006
Disposition: DONE
Description: Close case
Date Completed: 1/14/2004
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 1/14/2004
Disposition: DONE
Description: Review Complete-U
Date Completed: 1/14/2004
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 12/17/2003
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 12/17/2003
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 11/24/2003
Disposition: DONE
Description: Application Received-UF
Date Completed: 11/6/2003
Disposition: DONE
Description: Case Entered
Date Completed: 11/6/2003
Disposition:
Description: Septic Review Complete-U
Date Completed: 1/14/2004
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 11/24/2003
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 1/14/2004
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 1/14/2004
Disposition: DONE
Description: Consistency Review-U
Date Completed: 1/14/2004
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 1/14/2004
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Discharge oil: state & fed regs
Wording The proponents shall comply with all relevant state and federal regulations pertaining to the discharge of oil.

Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: No Fill or Other Material
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: OTHER PERMITS REQUIRED.
Wording The applicant shall be responsible to obtain other permits prior to commencing the repair activity. The following permits shall be required. -404 Permit- US Army Corps of Engineers -HPA- WDFW -Coastal Zone Management Certification- DOE -Water Quality Certification- DOE

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Hydraulic Code/HPA Check
Wording Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.

Title: Comply with HPA
Wording In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.

Title: Army Corps Check
Wording Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-SCOPE OF WORK
Wording The scope of the proposed work consists of crack sealing, pavement reapair, asphalt preleveling, guardrail adjustment and repair, drainage work and pavement marking and signage. No new development is being proposed.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on 12/17/03 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Streams, Habitat Areas, Geohazard Areas, and Streams. The proposal is to repair the existing section or roadway. No new development is proposed.

Title: F-Stormwater
Wording The applicant is proposing to conduct work within a mapped geohazard area. No new development is proposed. However, Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal to adhere to Best Management Practices.

Title: F-SEPA Exempt
Wording WASDOT determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800.

Title: F-Site Plan Changes
Wording The site plan as submitted with the shoreline application on 11/5/03 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 1/17/04 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for repair the existing roadway only. This approval encompasses the repair of the existing road way from MP285.16 to MP306.44. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-SDP Exemption Section
Wording The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section 3.402.6 and is consequently exempt from the substantial development permit (SDP) requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.