Title:
|
| | |
CUSTOM NOTICE PRIOR TO WORK
|
|
Wording
|
| | |
The proponent shall notify the Jefferson County Dept. of Community Development at (360) 379-4450 forty-eight (48) hours prior to commencing construction in order to allow for monitoring and ensure compliance with permit conditions.
|
|
|
Title:
|
| | |
CUSTOM WORK W/IN JURISDICTION
|
|
Wording
|
| | |
Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.
|
|
|
Title:
|
| | |
CUSTOM SITE PLAN CONDITION
|
|
Wording
|
| | |
Construction shall be in substantial compliance with the site plan submitted on August 12, 2002 as it exists now or is hereafter amended by Jefferson County and/or the Washington Dept. of Ecology.
|
|
|
Title:
|
| | |
PORTABLE TOILET FACILITY
|
|
Wording
|
| | |
Prior to the installation of the temporary, portable toilet facility at the South Point dock area, the applicant shall contact the Jefferson County Environmental Health at (360) 385-9444 for applicable approval/permit information.
|
|
|
Title:
|
| | |
Hydraulic Code/HPA Check
|
|
Wording
|
| | |
Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.
|
|
|
Title:
|
| | |
Comply with HPA
|
|
Wording
|
| | |
In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.
|
|
|
Title:
|
| | |
Army Corps Check
|
|
Wording
|
| | |
Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.
|
|
|
Title:
|
| | |
F-SDP EXEMPTION: MAINTENANCE
|
|
Wording
|
| | |
The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section 3.402.6 and is consequently exempt from the substantial development permit (SDP) requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.
|
|
|
Title:
|
| | |
F-CUSTOM SHORELINE EXEMPTION
|
|
Wording
|
| | |
The shoreline permit exemptions under this Master Land Use Application (MLA) are the equivalent of five (5) consecutive shoreline permit exemptions of one-year duration for each of the marine sites: Hood Canal Bridge West Half and South Point Passenger-Only Ferry Facility. The effective expiration is five (5) years from the initial date of issue. 9/18/2007: Applicant has submitted a JARPA and payment for an additional three years. Permit expires on September 27, 2010.
|
|
|
Title:
|
| | |
F-Special Report Submitted
|
|
Wording
|
| | |
Special Reports were submitted in conjunction with the application to address Federal approval requirements: State Route 104 Hood Canal Bridge West Half Retrofit and East Half Replacement Revised Environmental Assessment, May 2002; and Biological Assessment and Essential Fish Habitat Assessment (NMFS & USFWS Species, WSDOT Project No. 0L3305, Federal Aid No. BR-0104(025)), May 20, 2002.
|
|
|
Title:
|
| | |
F-Stormwater
|
|
Wording
|
| | |
Stormwater Site Plans for the Hood Canal Bridge repair project and associated temporary transporation facilities have been submitted by WSDOT. Stormwater management shall be conducted pursuant to State of Washington standards.
|
|
|
Title:
|
| | |
F-DNS Issued
|
|
Wording
|
| | |
Reviewed under the State Environmental Policy Act (SEPA) by the Washingston State Dept. of Transportation (WSDOT) acting as lead agency. Determination of Non-Significance (DNS) issued on June 24, 2002.
|
|