Cases Associated with Parcel No: HOODCANAL

This may not be a complete listing of information that exists for this parcel. There may be other information pertinent to the property on file. Please contact the Department of Community Development for additional information.



Case Number  SOM2019-01004
Description  pump report only, no septic record on file West Tower Hood Canal Bridge
Last Name  WASHINGTON STATE DOT
Received Date  1/24/2019 1:14:48 PM
Status  RNC
  

Case Number  SDP1974-10005
Description  The construction of a rock and cement bulkhead to protect waterfront lot from erosion
Last Name  AUSTIN
Received Date  7/28/2017 3:21:55 PM
Status  E
  

Case Number  SDP2016-00030
Description  Shoreline Conditional Use Application for the deployment of acoustic telemetry receivers in the North Hood Canal to track migration paths and mortality locations of acoustically tagged steelhead as they out migrate past the Hood Canal Bridge to Admiralty Inlet. The project also involves deploying Acoustic Doppler Current Profilers (ADCPs) to measure current velocity profiles and water levels near the Hood Canal Bridge. This project is exempt from SEPA under WAC 197-11-800 (17). The Jefferson County Shoreline Master Program (SMP), requires a type II permitting process. Final authority for shoreline conditional use permit decisions rests with the Washington State Department of Ecology.
Last Name  KEMP
Received Date  10/31/2016 1:35:35 PM
Status  E
LaserFiche Links  View LaserFiche Documents

Case Number  SDP2016-00004
Description  Shoreline Exemption Permit for maintenance to US Highway 101 from milepost 303.17 to 304.47 along the Hood Canal. The project will install milled in shoulder rumble strips in "high run off road" locations. Shoulder rumble strips will be placed in areas with sufficient shoulder width to install the rumble strips. The project will also install profiled plastic line shoulder rumble strips in locations that do not have sufficient shoulder widths for rumble strip installation. All work will be within the existing roadway. No new right of way or cut/fill will be involved. Work will also include maintaining traffic control.
Last Name  WSDOT
Received Date  3/10/2016 7:42:16 AM
Status  E
  

Case Number  PRE2015-00039
Description  Establish a new commercial Shellfish farm to raise Oysters & Clams in the intertidal zone of Hood Canal
Last Name  FITZGERALD
Received Date  12/28/2015 4:14:27 PM
Status  M
  

Case Number  SDP2004-00042
Description  SHORELINE EXEMPTION to replace concrete anchors with helix anchors systems for 31 mooring buoys located in state parks, which include Fort Worden, Fort Flagler, Mystery Bay, Old Fort Townsend, and Shine Tidelands. These state parks are located in the following water bodies: Admiralty inlet, Kilisut Harbor, Port Townsend Bay, Bywater Bay, Hood Canal, and Puget Sound.
Last Name  WA STATE PARKS AND RECREATION
Received Date  8/23/2004 12:00:00 AM
Status  Finaled
  

Case Number  SDP2004-10004
Description  The proposal is for maintenance dredging for the Bridgehaven Marina. The applicant is proposing to extract approximately 7,000 cubic yards of material, of which approximately 2,000 cubic yards of the sandy dredged material will be placed on the upper intertidal beach and backshore area south of the Bridgehaven spit near the old South Point ferry terminal. The remaining 5,000 cubic yards of material will be placed in the approved deep water disposal site near Port Townsend. The applicant has received a Hydraulic Project Approval (HPA) permit issued from WDFW. In addition, the applicant will be required to obtain a permit from the US Army Corps of Engineers. This notice includes the Final Threshold Determination that a Determination of Non-Significance (DNS) has been issued. The optional DNS process of WAC 197-11-355 is being used. Parties of record can appeal the Final Threshold Determination by 4 p.m. on July 14, 2004. The specifications for appeals are outlined by Section 8.5.1(e) of the UDC, and require a $612 appeal fee. If an appeal of the Final Threshold Determination is received, it will be incorporated into the Hearing Examiners open record hearing for this proposal. The applicant subsequently modified the proposal to deposit all 7,000 cubic yards of material in open water per the Army Corp of Engineers approval.
Last Name  BRIDGEHAVEN COMMUNITY CLUB
Received Date  3/2/2004 12:00:00 AM
Status  E
  

Case Number  SDP2002-00038
Description  Updated 9/272007: Annual Shoreline Permit Exemptions for three (3) consecutive one-year periods from 9/27/07which was the expiration date of the permit issued on September 27, 2002 for a five year approval. Permit first applied for on 8/12/2002 and was for Annual Shoreline permit exemptions for five (5) consecutive one-year periods from original issue date. West half retro-fit and east half replacement of the Hood Canal Bridge anticipated in 2006. (Also see ZON02-00082).
Last Name  WA ST DOT
Received Date  8/12/2002 12:00:00 AM
Status  E
  

Case Number  PRE2002-00032
Description  To construct the East half of the Hood Canal Bridge to current design standards and to make improvements to the remainder of the structure.
Last Name  WA STATE DEPT OF TRANSPORTATION
Received Date  6/20/2002 12:00:00 AM
Status  Finaled
  

Case Number  XMP2000-00019
Description  To repair a seal fence required by the State Department of Health to prevent fecal coliform contamination in public shellfish beds. The work will consist of repairs to the damaged area of the fence along the slough entrance to insure fish passage, the pulling back of large wood material along the south fence line and anchoring of the material using screw anchors, and the removal of downed and destroyed fencing from the site. All fence repair will be done by hand. Heavy equipment will be limited to that needed to drill screw anchors and remove damaged fence.
Last Name  WA STATE PARKS & RECREATION
Received Date  11/9/2000 12:00:00 AM
Status  Finaled
  

Case Number  XMP1999-00038
Description  Fish Habitat Enhancement Project
Last Name  WILD OLYMPIC SALMON
Received Date  8/25/1999 12:00:00 AM
Status  Finaled
  

Case Number  SDP1999-00008
Description  The proposal involves the installation of a submarine communication cable which will traverse the Hood Canal. The cable will be buried approximately 3 to 4 feet below the ground surface and will daylight in Jefferson County immediately north of the Hood Canal Bridge on a site containing a power substation owned and operated by Puget Sound Energy. Shine Tidelands State park is located just north of the proposed landing area. After crossing the Hood Canal, the cable will be tied in with existing aerial systems. The proposed cable placement is part of a larger project to supply telecommunications service for the Olympic Penninsula.
Last Name  US WEST COMMUNICATIONS
Received Date  6/17/1999 12:00:00 AM
Status  E
  

Case Number  XMP1999-00015
Description  Removal of slide debris and trees to regain access to oyster beds.
Last Name  PEDERSON
Received Date  5/5/1999 12:00:00 AM
Status  Withdrawn
  

Case Number  XMP1998-00045
Description  The site is proposed to be used for shellfish aquaculture, specifically for havesting hardshell clams. Natural populations will be harvested, and some planting of the beach with manila clams will occur in the future. All harvesting and planting will be done with hand powered equipment (rakes & shovels). No power equipment of any kind will be used, and no structures will be placed on the site. Access will be gained to the tidelands by boat, or over US Navy property, for which a license has been granted.
Last Name  RUSSELL
Received Date  9/22/1998 12:00:00 AM
Status  E
LaserFiche Links  View LaserFiche Documents

Case Number  XMP1998-00025
Description  Construction of a 150 foot long rip-rap wall and an H-pile retaining wall for road repair purposes.
Last Name  JEFFERSON COUNTY DEPT OF PW
Received Date  6/29/1998 12:00:00 AM
Status  E
LaserFiche Links  View LaserFiche Documents

Case Number  XMP1998-00019
Description  replacement of 8 steel expansion joint plates on the Hood Canal Bridge
Last Name  WASH STATE DEPT OF TRANSPORT
Received Date  5/14/1998 12:00:00 AM
Status  E
LaserFiche Links  View LaserFiche Documents

Case Number  XMP1998-00002
Description  installation of culvert and stormwater outfall for residential use.
Last Name  BENEFIEL
Received Date  1/23/1998 12:00:00 AM
Status  E
LaserFiche Links  View LaserFiche Documents

Case Number  XMP1998-00001
Description  maintenance and repair of the Hood Canal floating bridge
Last Name  WA STATE DOT
Received Date  1/9/1998 12:00:00 AM
Status  E
LaserFiche Links  View LaserFiche Documents

Case Number  XMP1997-00062
Description  replace worn culverts to prevent further flooding damage of road and improve fish habitat.
Last Name  JEFF CTY DEPT OF PUBLIC WORKS
Received Date  10/6/1997 12:00:00 AM
Status  E
  

Case Number  XMP1997-00056
Description  repair bulkhead, replace in-kind structures:restroom and gazebo
Last Name  COYLE COMMUNITY CLUB
Received Date  8/25/1997 12:00:00 AM
Status  E
  

Case Number  XMP1997-00050
Description  plant geoducks on Shine Tidelands.
Last Name  WASH DEPT FISH & WILDLIFE
Received Date  8/1/1997 12:00:00 AM
Status  E
  

Case Number  XMP1997-00039
Description  maintenance and repair of the Hood Canal floating bridge
Last Name  WA STATE DOT
Received Date  7/1/1997 12:00:00 AM
Status  E
  

Case Number  XMP1997-00034
Description  replace 12" culvert with 24" culvert. It will be necessary to remove a portion of the bulkhead in order to replace the culvert. After culvert replacement, the bulkhead will be rebuilt in its original location. No work waterward of the OHWM is required
Last Name  JEFFERSON CO DPW
Received Date  6/11/1997 12:00:00 AM
Status  E
  

Case Number  XMP1997-00023
Description  to place three wall tents in old camp loop
Last Name  WASHINGTON STATE PARKS & REC
Received Date  4/23/1997 12:00:00 AM
Status  Withdrawn
  

Case Number  XMP1997-00004
Description  bank stabilization to protect the road in which Seamount Estates water line is located
Last Name  BLOOMFIELD
Received Date  2/4/1997 12:00:00 AM
Status  E
  

Case Number  XMP1996-00074
Description  Provide overwinter nursery for geoduck seed by installing plastic pallets and seed trays underwater in Dabob Bay.
Last Name  WA ST DEPT OF FISH & WILDLIFE
Received Date  10/23/1996 12:00:00 AM
Status  E
  

Case Number  XMP1996-00069
Description  Cable logs in place to prevent trees from being washed away during winter high water.
Last Name  WASH STATE PARKS & RECREATION
Received Date  9/23/1996 12:00:00 AM
Status  E
  

Case Number  XMP1996-00063
Description  attaching trees with limbs to the bank via the use of "dead-man" tie-backs to curb erosion while providing additional fish habitat.
Last Name  JEFFERSON CO PUBLIC WORKS DEPT
Received Date  9/10/1996 12:00:00 AM
Status  E
  

Case Number  XMP1996-00057
Description  Install a 24" X 30" sign at Dosewallips State Park and Triton Cove State Park.
Last Name  PUGET SOUND WATER QUALITY
Received Date  8/26/1996 12:00:00 AM
Status  E
  

Case Number  XMP1996-00017
Description  Repair and/or replace sctions of the seal fence at Dosewallips that was damaged by recent storms.
Last Name  WASH STATE PARKS & RECREATION
Received Date  4/22/1996 12:00:00 AM
Status  E
  

Case Number  XMP1996-00012
Description  To install a residential water desalination system.
Last Name  ALLINGHAM
Received Date  3/28/1996 12:00:00 AM
Status  E
  

Case Number  XMP1996-00011
Description  to repair and maintain an existing recreation dock.
Last Name  MCNALL
Received Date  3/26/1996 12:00:00 AM
Status  Finaled
  

Case Number  XMP1996-00010
Description  Removal of existing deteriorated wooded and concrete dockage in the area referred to as "C" dock; and replacement with new concrete fingers and headwalk per plans provided in file. The plan calls for utilization of existing pilings.
Last Name  PLEASANT HARBOR CORPORATION
Received Date  3/19/1996 12:00:00 AM
Status  E
  

Case Number  XMP1996-00001
Description  Remove root wads and logs blocking normal river channel. Relocate gravel bar. Root wads and logs will be cabeled to trees along shoreline to armor streambank and provide fish habitat
Last Name  PHILLIPS
Received Date  1/22/1996 12:00:00 AM
Status  E
  

Case Number  XMP1995-00067
Description  emergency bank stabilization; use available trees & stumps for tie back per plans, rip rap minimum size is 3 ft diameter. Work will be accomplished using track mounted excavator to place rock.
Last Name  JEFFERSON CO DPW
Received Date  12/7/1995 12:00:00 AM
Status  E
  

Case Number  XMP1995-00068
Description  repair existing pipeline and tide gate
Last Name  WA ST DEPT OF FISH & WILDLIFE
Received Date  12/6/1995 12:00:00 AM
Status  E
  

Case Number  SDP1995-10010
Description  The proposed activity is for the continued operation of a harvest for subtidal geoduck clams on state-owned lands in Jefferson County. The harvest will take place on seven commercial geoduck beds and will take approximately five years to complete.
Last Name  WA ST DNR
Received Date  11/17/1995 12:00:00 AM
Status  Withdrawn
  

Case Number  XMP1995-00066
Description  replace three pilings and repair ramp
Last Name  OLYMPIC CANAL MAINTENANCE CO
Received Date  11/16/1995 12:00:00 AM
Status  Finaled
  

Case Number  XMP1995-00055
Description  Bank Stabilization
Last Name  JEFFERSON CO PUBLIC WORKS DEPT
Received Date  10/16/1995 12:00:00 AM
Status  E
  

Case Number  XMP1995-00043
Description  Project is to control and eradicate the spread of Spartina within the littoral zone at Dosewallips State Park. The project will consist of wiping and spraying affected area with Rodeo, mowing a control site to gage effectiveness of treatments, and covering sites with geotextile fabric. Approximately 8500 square feet of affected area will be treated. Project site will be sprayed and wiped by a licensed applicator and herbicide concentrations will conform with the standards outlined in the Environmental Impact Statement published by the Department of Agriculture for noxious weed control.
Last Name  WA ST PARKS & RECREATION
Received Date  7/14/1995 12:00:00 AM
Status  E
  

Case Number  SDP1995-10001
Description  Harvest Geoducks for relay and placement in a float for cleansing.
Last Name  SEABED HARVESTING INC
Received Date  2/10/1995 12:00:00 AM
Status  Canceled
  

Case Number  XMP1994-00026
Description  ?
Last Name  NAVAL UNDERSEA WARFARE CENTER
Received Date  6/15/1994 12:00:00 AM
Status  Withdrawn
  

Case Number  XMP1994-00023
Description  Rip-rap repair to existing sea walls to protect Shine Rd & rebuild shoulders as part of normal maintenance to prevent total loss of the road.
Last Name  JEFFERSON CO PUBLIC WORKS DEPT
Received Date  6/13/1994 12:00:00 AM
Status  E
  

Case Number  SDP1994-10005
Description  to construct a wildlife viewing platform at the Dosewallips State Park in Brinnon. The applicant is the owner of the site described below.
Last Name  STATE PARKS & RECREATION COMM
Received Date  2/22/1994 12:00:00 AM
Status  E
  

Case Number  XMP1994-00002
Description  PROPOSAL: Routine maintenance on the Hood Canal Bridge by replacing the grid deck.
Last Name  STATE DEPT OF TRANSPORTATION
Received Date  12/27/1993 12:00:00 AM
Status  E
  

Case Number  XMP1993-00033
Description  Install a restrainer on the Duckabush slough bridge and the Fulton creek bridge
Last Name  STATE OF WASHINGTON - DOT
Received Date  8/24/1993 12:00:00 AM
Status  E
  

Case Number  XMP1993-00027
Description  Mooring buoy - renewal
Last Name  HOCKEISER
Received Date  8/9/1993 12:00:00 AM
Status  E
  

Case Number  XMP1993-00005
Description  Place approx 80 ft of rip rap for SFR
Last Name  CARLSEN
Received Date  2/27/1993 12:00:00 AM
Status  E
  

Case Number  XMP1993-00007
Description  60ft of rip rap 8 ft in height with access stairs in common with a SFR
Last Name  ROMIG
Received Date  10/6/1992 12:00:00 AM
Status  E
  

Case Number  XMP1992-00065
Description  Mooring Buoy for recreational use
Last Name  HOCKEISER
Received Date  8/31/1992 12:00:00 AM
Status  E
  

Case Number  XMP1992-00040
Description  Replace a wood ramp with a new wood ramp of similar dimensions
Last Name  COYLE COMMUNITY CLUB
Received Date  6/15/1992 12:00:00 AM
Status  E
  

Case Number  XMP1992-00029
Description  Construct a domestic water main, fire hydrants, and other appurtenances.
Last Name  PUBLIC UTILITIES DISTRICT NO 1
Received Date  4/22/1992 12:00:00 AM
Status  E
  

Case Number  XMP1992-00008
Description  Set two property boundary signs on the tidelands of Wolfe Property State Park
Last Name  WA STATE PARKS AND REC COMMISSION
Received Date  1/23/1992 12:00:00 AM
Status  E
LaserFiche Links  View LaserFiche Documents

Case Number  XMP1991-00021
Description  PROPOSAL: To install 130 lineal feet of fence across one slough in the high intertidal zone of Hood Canal and/or its associated wetlands for evaluation of seal relocation and improvement of water quality.
Last Name  WA ST PARKS & RECREATION
Received Date  2/28/1991 12:00:00 AM
Status  E
  

Case Number  XMP1990-00056
Description  PROPOSAL: The proposal is to replace an existing vault toilet.
Last Name  WA ST PARKS & RECREATION
Received Date  10/10/1990 12:00:00 AM
Status  E
  

Case Number  XMP1990-00016
Description  PROPOSAL: To repair and maintain existing dock, pier, ramp, and access road at the Triton Cove boat launch facility.
Last Name  WA ST PARKS & RECREATION
Received Date  5/3/1990 12:00:00 AM
Status  E
  

Case Number  XMP1990-00015
Description  PROPOSAL: To place a 10 foot by 30 foot wooden float in Hood Canal for three months for research into seal haul out behavior
Last Name  CASCADIA RESEARCH COLLECTIVE
Received Date  4/13/1990 12:00:00 AM
Status  E
  

Case Number  XMP1989-00033
Description  Place mooring buoy and 3 rebar racks for cultivation of oysters,
Last Name  SMITH
Received Date  7/14/1989 12:00:00 AM
Status  E
  

Case Number  XMP1989-00009
Description  PROPOSAL: To test a boat-mounted hydraulic/airlift clam harvester for use in harvesting juvenile razor clams for transplanting. The testing would be videotaped. There would be a maximum of 20 hours on-bottom times between mid-April and mid-May 1989.
Last Name  STATE DEPT OF FISH & WILDLIFE
Received Date  5/4/1989 12:00:00 AM
Status  Withdrawn
  

Case Number  XMP1986-00049
Description  Maintain existing raceways, place PVC pipe on bottom of raceways, and remove existing pipe.
Last Name  STATE OF WASHINGTON -FISH/WDLF
Received Date  12/12/1986 12:00:00 AM
Status  E
  

Case Number  SDP1986-10009
Description  SET OF 22 NET PENS OFF EXISTING PIER FOR SALMON REARING FACILITY AT OLD SOUTH PT FERRY TERMINAL.
Last Name  STATE OF WASHINGTON-DOT
Received Date  6/16/1986 4:24:18 PM
Status  E
  

Case Number  XMP1986-00012
Description  Temporary marking buoys in the water to locate salmon rearing test pen sites.
Last Name  SEA FARM OF NORWAY, INC.
Received Date  3/3/1986 12:00:00 AM
Status  E
  

Case Number  SDP1986-10002
Description  CONDUCT SALMON REARING TESTS IN HOOD CANAL OFF HOOD HEAD
Last Name  SEA FARM OF NORWAY, INC.
Received Date  1/17/1986 12:00:00 AM
Status  E
  

Case Number  SDP1985-00017
Description  Clam harvesting and processing
Last Name  IVAR'S CLAM FARMS
Received Date  12/26/1985 12:00:00 AM
Status  Denied
  

Case Number  SDP1985-00009
Description  Net pens, on land and in water
Last Name  PEDERSON
Received Date  6/3/1985 12:00:00 AM
Status  Withdrawn
  

Case Number  SDP1985-00001
Description  Install temporary, scallop seed, collection system
Last Name  THOMAS
Received Date  1/28/1985 12:00:00 AM
Status  E
  

Case Number  XMP1983-00003
Description  Test underwater clam harvester in Hood Canal by Boulton Peninsula
Last Name  RICKARD
Received Date  1/14/1983 12:00:00 AM
Status  E
  

Case Number  SDP1983-10001
Description  Installation of experimental buoy system designed to collect floating scallop seed
Last Name  WA STATE DEPT OF FISHERIES
Received Date  1/2/1983 12:00:00 AM
Status  E
  

Case Number  XMP1982-00030
Description  Test harvesting of hardshell clam beds
Last Name  WESTLEY
Received Date  8/26/1982 12:00:00 AM
Status  E
  

Case Number  SDP1982-00007
Description  Install 20 connecting oyster spat collection floats, measuring overall approx 1,250 sq/ft Near Seal Rock
Last Name  POWELL
Received Date  4/22/1982 12:00:00 AM
Status  E
  

Case Number  SDP1981-10007
Description  Place 3 mussel culture rafts
Last Name  DAVID A WILSON
Received Date  3/16/1981 12:00:00 AM
Status  E
  

Case Number  SDP1979-10012
Description  Construct a boat ramp and install a float structure
Last Name  UDDENBERG
Received Date  8/30/1979 12:00:00 AM
Status  E
  

Case Number  SDP1979-10011
Description  Replace a submarine eletrical distribution cable on the bottom of Hood Canal to improve electrical service
Last Name  PUGET SOUND POWER AND LIGHT CO
Received Date  8/29/1979 12:00:00 AM
Status  E
  

Case Number  SDP1979-10001
Description  Beach rehab for hardshell clam stocks; 5 1-acre lots in the lower intertidal zone by placement of select gravel.
Last Name  WASHINGTON STATE DEPT OF FISHERIES
Received Date  1/22/1979 9:20:24 AM
Status  E
  

Case Number  XMP1978-00026
Description  Testing of seven subtidal clam areas
Last Name  LINDSEY
Received Date  11/9/1978 12:00:00 AM
Status  E
  

Case Number  SDP1978-10027
Description  Construct a private moorage facility; pier (5 X 55 feet); piling; ramp (3 X 42 feet); float (24 X 40 feet outside measurement with 12 X 35 foot cavity).
Last Name  BOLING
Received Date  10/25/1978 12:00:00 AM
Status  E
  

Case Number  SDP1978-10028
Description  Construct a private moorage facility; pier (6 X 40 feet); piles; ramp (4 X 35 feet); float ("L" shaped, 40 feet in length).
Last Name  BOLING
Received Date  10/25/1978 12:00:00 AM
Status  E
  

Case Number  SDP1978-10022
Description  Placement of a 5'2" X 16'6" recreation/moorage float
Last Name  JACK L MERRICK
Received Date  7/6/1978 12:00:00 AM
Status  E
  

Case Number  SDP1978-10023
Description  Moorage bouy and 12 X 12 foot float
Last Name  WILLIAMS
Received Date  7/5/1978 12:00:00 AM
Status  E
  

Case Number  SDP1978-10018
Description  Placement of private mooring bouys
Last Name  COLLINS
Received Date  6/16/1978 12:00:00 AM
Status  E
  

Case Number  SDP1978-10010
Description  Placement of a boat moorage bouy and 12' X 12' anchored float for swimming and as a water skiing platform
Last Name  F BYRON SWIGART
Received Date  4/14/1978 12:00:00 AM
Status  E
  

Case Number  SDP1978-10008
Description  Permanent location for seasonal moorage of barges: together with loading and unloading of oyster seed cultch and oysters, with moveable ramp between shore and barge.
Last Name  DUNGENESS OYSTER FARMS, INC
Received Date  2/24/1978 12:00:00 AM
Status  E
  

Case Number  XMP1977-00013
Description  Hood Canal Bridge lower deck repair on Pontoon E.
Last Name  ZIRKLE
Received Date  7/19/1977 12:00:00 AM
Status  E
  

Case Number  SDP1977-10011
Description  Remove existing waterline and bury a 4" class 200 PUC line under teh dredged boat canal between the existing well and Div 3.
Last Name  PUGET SOUND EXCHANGE CORP
Received Date  6/2/1977 12:00:00 AM
Status  E
  

Case Number  SDP1977-10006
Description  Provide anchorage for herring storage pens concurrent with season herring fish operations.
Last Name  KITSAP BAIT SALES
Received Date  3/8/1977 2:31:22 PM
Status  E
  

Case Number  SDP1977-10005
Description  Develop a recreational preserve consisting of 394 campsites, clubhouse, swimming pool, tennis courts, soccer field, baseball fields, hiking trails, boat ramp, and pier.
Last Name  EVERGREEN ENVIRONMENTAL DEVEL. CORP
Received Date  1/25/1977 2:16:31 PM
Status  Withdrawn
  

Case Number  SDP1976-10016
Description  Increase width of existing boat ramp ten feet, add parallel floating walk (4' X 100') with a landing and access ramp.
Last Name  NAUD
Received Date  3/29/1976 12:00:00 AM
Status  E
  

Case Number  SDP1976-10012
Description  Private boat moorage float (6' X 9') which will be shared by 3 other adjacent property owners.
Last Name  PETORAK
Received Date  2/25/1976 12:00:00 AM
Status  E
  

Case Number  XMP1976-00003
Description  Replace electrical cables on floating bridge
Last Name  BRASCHNER
Received Date  1/23/1976 12:00:00 AM
Status  E
  

Case Number  SDP1975-10024
Description  Installation of a mooring bouy with attached boat retrieval line
Last Name  COLLINS
Received Date  12/8/1975 12:00:00 AM
Status  E
  

Case Number  SDP1975-10020
Description  Temporary seasonal moorage of herring holding pens concurrent with bait herring fishing operations
Last Name  KITSAP BAIT SALES
Received Date  9/23/1975 12:00:00 AM
Status  E
  

Case Number  SDP1975-10010
Description  Aquaculture
Last Name  WASHINGTON MARINE LIFE ASSOCIATION
Received Date  5/7/1975 12:00:00 AM
Status  Withdrawn
  

Case Number  SDP1973-10063
Description  Community beach access and boat ramp
Last Name  PLEASANT TIDES PRP
Received Date  11/16/1973 12:00:00 AM
Status  E
  

Case Number  SDP1972-10036
Description  Construction of fish pens, oysters rafts and shore facilities
Last Name  MARICULTURE NORTHWEST INC
Received Date  10/20/1972 12:00:00 AM
Status  E
  

Case Number  SDP1972-10032
Description  Construction of private boat dock
Last Name  CARLSON RADABOUGH
Received Date  10/5/1972 12:00:00 AM
Status  E
  

Case Number  SDP1972-10031
Description  To improve the swimming area and construct a boat ramp
Last Name  OLY CANAL MAINTENANCE CO
Received Date  10/3/1972 12:00:00 AM
Status  E
  

Case Number  SDP1972-10028
Description  Submarine cable and terminal stations
Last Name  PUGET SOUND POWER AND LIGHT COMPANY
Received Date  7/20/1972 12:00:00 AM
Status  E
  

Case Number  SDP1971-10004
Description  Condominiums with boat slip
Last Name  CHG INTERNATIONAL
Received Date  11/1/1971 12:00:00 AM
Status  Denied
  

Case Number  SDP1971-10001
Description  Underground/underwater installation of 3 single conductor 15 KV cables as shore end connections and 1-3 conductor 25 KV submarine cable from Salsbury Point-Kitsap County to Shine-Jefferson County.
Last Name  PUGET SOUND POWER & LIGHT COMPANY
Received Date  7/22/1971 12:00:00 AM
Status  E
  

Case Number  SDP1974-10004
Description  To retain existing bulkhead and fill, place rock ripe rap from ground level of bulkhead to MHHW line on bulkhead
Last Name  MUSIEL
Received Date  
Status  E
  

Case Number  SDP1974-10006
Description  To retain existing bulkhead and fill, place rock rip-rap from ground level of bulkhead to the MHHW line on the bulkhead
Last Name  AUSTIN
Received Date  
Status  E
  

Case Number  XMP1975-00006
Description  Herring pens in Squamish Harbor
Last Name  NELSON
Received Date  
Status  E