|
Case Number | | SOM2019-01004
|
|
Description | | pump report only, no septic record on file West Tower Hood Canal Bridge
|
|
Last Name | | WASHINGTON STATE DOT
|
|
Received Date | | 1/24/2019 1:14:48 PM
|
|
Status | | RNC
|
|
| | |
|
|
Case Number | | SDP1974-10005
|
|
Description | | The construction of a rock and cement bulkhead to protect waterfront lot from erosion
|
|
Last Name | | AUSTIN
|
|
Received Date | | 7/28/2017 3:21:55 PM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP2016-00030
|
|
Description | | Shoreline Conditional Use Application for the deployment of acoustic telemetry receivers in the North Hood Canal to track migration paths and mortality locations of acoustically tagged steelhead as they out migrate past the Hood Canal Bridge to Admiralty Inlet. The project also involves deploying Acoustic Doppler Current Profilers (ADCPs) to measure current velocity profiles and water levels near the Hood Canal Bridge. This project is exempt from SEPA under WAC 197-11-800 (17). The Jefferson County Shoreline Master Program (SMP), requires a type II permitting process. Final authority for shoreline conditional use permit decisions rests with the Washington State Department of Ecology.
|
|
Last Name | | KEMP
|
|
Received Date | | 10/31/2016 1:35:35 PM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | SDP2016-00004
|
|
Description | | Shoreline Exemption Permit for maintenance to US Highway 101 from milepost 303.17 to 304.47 along the Hood Canal. The project will install milled in shoulder rumble strips in "high run off road" locations. Shoulder rumble strips will be placed in areas with sufficient shoulder width to install the rumble strips. The project will also install profiled plastic line shoulder rumble strips in locations that do not have sufficient shoulder widths for rumble strip installation. All work will be within the existing roadway. No new right of way or cut/fill will be involved. Work will also include maintaining traffic control.
|
|
Last Name | | WSDOT
|
|
Received Date | | 3/10/2016 7:42:16 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | PRE2015-00039
|
|
Description | | Establish a new commercial Shellfish farm to raise Oysters & Clams in the intertidal zone of Hood Canal
|
|
Last Name | | FITZGERALD
|
|
Received Date | | 12/28/2015 4:14:27 PM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | SDP2004-00042
|
|
Description | | SHORELINE EXEMPTION to replace concrete anchors with helix anchors systems for 31 mooring buoys located in state parks, which include Fort Worden, Fort Flagler, Mystery Bay, Old Fort Townsend, and Shine Tidelands. These state parks are located in the following water bodies: Admiralty inlet, Kilisut Harbor, Port Townsend Bay, Bywater Bay, Hood Canal, and Puget Sound.
|
|
Last Name | | WA STATE PARKS AND RECREATION
|
|
Received Date | | 8/23/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2004-10004
|
|
Description | | The proposal is for maintenance dredging for the Bridgehaven Marina. The applicant is proposing to extract approximately 7,000 cubic yards of material, of which approximately 2,000 cubic yards of the sandy dredged material will be placed on the upper intertidal beach and backshore area south of the Bridgehaven spit near the old South Point ferry terminal. The remaining 5,000 cubic yards of material will be placed in the approved deep water disposal site near Port Townsend. The applicant has received a Hydraulic Project Approval (HPA) permit issued from WDFW. In addition, the applicant will be required to obtain a permit from the US Army Corps of Engineers.
This notice includes the Final Threshold Determination that a Determination of Non-Significance (DNS) has been issued. The optional DNS process of WAC 197-11-355 is being used. Parties of record can appeal the Final Threshold Determination by 4 p.m. on July 14, 2004. The specifications for appeals are outlined by Section 8.5.1(e) of the UDC, and require a $612 appeal fee. If an appeal of the Final Threshold Determination is received, it will be incorporated into the Hearing Examiners open record hearing for this proposal.
The applicant subsequently modified the proposal to deposit all 7,000 cubic yards of material in open water per the Army Corp of Engineers approval.
|
|
Last Name | | BRIDGEHAVEN COMMUNITY CLUB
|
|
Received Date | | 3/2/2004 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP2002-00038
|
|
Description | | Updated 9/272007: Annual Shoreline Permit Exemptions for three (3) consecutive one-year periods from 9/27/07which was the expiration date of the permit issued on September 27, 2002 for a five year approval. Permit first applied for on 8/12/2002 and was for Annual Shoreline permit exemptions for five (5) consecutive one-year periods from original issue date. West half retro-fit and east half replacement of the Hood Canal Bridge anticipated in 2006. (Also see ZON02-00082).
|
|
Last Name | | WA ST DOT
|
|
Received Date | | 8/12/2002 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | PRE2002-00032
|
|
Description | | To construct the East half of the Hood Canal Bridge to current design standards and to make improvements to the remainder of the structure.
|
|
Last Name | | WA STATE DEPT OF TRANSPORTATION
|
|
Received Date | | 6/20/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP2000-00019
|
|
Description | | To repair a seal fence required by the State Department of Health to prevent fecal coliform contamination in public shellfish beds. The work will consist of repairs to the damaged area of the fence along the slough entrance to insure fish passage, the pulling back of large wood material along the south fence line and anchoring of the material using screw anchors, and the removal of downed and destroyed fencing from the site. All fence repair will be done by hand. Heavy equipment will be limited to that needed to drill screw anchors and remove damaged fence.
|
|
Last Name | | WA STATE PARKS & RECREATION
|
|
Received Date | | 11/9/2000 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1999-00038
|
|
Description | | Fish Habitat Enhancement Project
|
|
Last Name | | WILD OLYMPIC SALMON
|
|
Received Date | | 8/25/1999 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP1999-00008
|
|
Description | | The proposal involves the installation of a submarine communication cable which will traverse the Hood Canal. The cable will be buried approximately 3 to 4 feet below the ground surface and will daylight in Jefferson County immediately north of the Hood Canal Bridge on a site containing a power substation owned and operated by Puget Sound Energy. Shine Tidelands State park is located just north of the proposed landing area. After crossing the Hood Canal, the cable will be tied in with existing aerial systems. The proposed cable placement is part of a larger project to supply telecommunications service for the Olympic Penninsula.
|
|
Last Name | | US WEST COMMUNICATIONS
|
|
Received Date | | 6/17/1999 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1999-00015
|
|
Description | | Removal of slide debris and trees to regain access to oyster beds.
|
|
Last Name | | PEDERSON
|
|
Received Date | | 5/5/1999 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | XMP1998-00045
|
|
Description | | The site is proposed to be used for shellfish aquaculture, specifically for havesting hardshell clams. Natural populations will be harvested, and some planting of the beach with manila clams will occur in the future. All harvesting and planting will be done with hand powered equipment (rakes & shovels). No power equipment of any kind will be used, and no structures will be placed on the site. Access will be gained to the tidelands by boat, or over US Navy property, for which a license has been granted.
|
|
Last Name | | RUSSELL
|
|
Received Date | | 9/22/1998 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1998-00025
|
|
Description | | Construction of a 150 foot long rip-rap wall and an H-pile retaining wall for road repair purposes.
|
|
Last Name | | JEFFERSON COUNTY DEPT OF PW
|
|
Received Date | | 6/29/1998 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1998-00019
|
|
Description | | replacement of 8 steel expansion joint plates on the Hood Canal Bridge
|
|
Last Name | | WASH STATE DEPT OF TRANSPORT
|
|
Received Date | | 5/14/1998 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1998-00002
|
|
Description | | installation of culvert and stormwater outfall for residential use.
|
|
Last Name | | BENEFIEL
|
|
Received Date | | 1/23/1998 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1998-00001
|
|
Description | | maintenance and repair of the Hood Canal floating bridge
|
|
Last Name | | WA STATE DOT
|
|
Received Date | | 1/9/1998 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1997-00062
|
|
Description | | replace worn culverts to prevent further flooding damage of road and improve fish habitat.
|
|
Last Name | | JEFF CTY DEPT OF PUBLIC WORKS
|
|
Received Date | | 10/6/1997 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1997-00056
|
|
Description | | repair bulkhead, replace in-kind structures:restroom and gazebo
|
|
Last Name | | COYLE COMMUNITY CLUB
|
|
Received Date | | 8/25/1997 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1997-00050
|
|
Description | | plant geoducks on Shine Tidelands.
|
|
Last Name | | WASH DEPT FISH & WILDLIFE
|
|
Received Date | | 8/1/1997 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1997-00039
|
|
Description | | maintenance and repair of the Hood Canal floating bridge
|
|
Last Name | | WA STATE DOT
|
|
Received Date | | 7/1/1997 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1997-00034
|
|
Description | | replace 12" culvert with 24" culvert. It will be necessary to remove a portion of the bulkhead in order to replace the culvert. After culvert replacement, the bulkhead will be rebuilt in its original location. No work waterward of the OHWM is required
|
|
Last Name | | JEFFERSON CO DPW
|
|
Received Date | | 6/11/1997 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1997-00023
|
|
Description | | to place three wall tents in old camp loop
|
|
Last Name | | WASHINGTON STATE PARKS & REC
|
|
Received Date | | 4/23/1997 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | XMP1997-00004
|
|
Description | | bank stabilization to protect the road in which Seamount Estates water line is located
|
|
Last Name | | BLOOMFIELD
|
|
Received Date | | 2/4/1997 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1996-00074
|
|
Description | | Provide overwinter nursery for geoduck seed by installing plastic pallets and seed trays underwater in Dabob Bay.
|
|
Last Name | | WA ST DEPT OF FISH & WILDLIFE
|
|
Received Date | | 10/23/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1996-00069
|
|
Description | | Cable logs in place to prevent trees from being washed away during winter high water.
|
|
Last Name | | WASH STATE PARKS & RECREATION
|
|
Received Date | | 9/23/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1996-00063
|
|
Description | | attaching trees with limbs to the bank via the use of "dead-man" tie-backs to curb erosion while providing additional fish habitat.
|
|
Last Name | | JEFFERSON CO PUBLIC WORKS DEPT
|
|
Received Date | | 9/10/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1996-00057
|
|
Description | | Install a 24" X 30" sign at Dosewallips State Park and Triton Cove State Park.
|
|
Last Name | | PUGET SOUND WATER QUALITY
|
|
Received Date | | 8/26/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1996-00017
|
|
Description | | Repair and/or replace sctions of the seal fence at Dosewallips that was damaged by recent storms.
|
|
Last Name | | WASH STATE PARKS & RECREATION
|
|
Received Date | | 4/22/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1996-00012
|
|
Description | | To install a residential water desalination system.
|
|
Last Name | | ALLINGHAM
|
|
Received Date | | 3/28/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1996-00011
|
|
Description | | to repair and maintain an existing recreation dock.
|
|
Last Name | | MCNALL
|
|
Received Date | | 3/26/1996 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1996-00010
|
|
Description | | Removal of existing deteriorated wooded and concrete dockage in the area referred to as "C" dock; and replacement with new concrete fingers and headwalk per plans provided in file. The plan calls for utilization of existing pilings.
|
|
Last Name | | PLEASANT HARBOR CORPORATION
|
|
Received Date | | 3/19/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1996-00001
|
|
Description | | Remove root wads and logs blocking normal river channel. Relocate gravel bar. Root wads and logs will be cabeled to trees along shoreline to armor streambank and provide fish habitat
|
|
Last Name | | PHILLIPS
|
|
Received Date | | 1/22/1996 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1995-00067
|
|
Description | | emergency bank stabilization; use available trees & stumps for tie back per plans, rip rap minimum size is 3 ft diameter. Work will be accomplished using track mounted excavator to place rock.
|
|
Last Name | | JEFFERSON CO DPW
|
|
Received Date | | 12/7/1995 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1995-00068
|
|
Description | | repair existing pipeline and tide gate
|
|
Last Name | | WA ST DEPT OF FISH & WILDLIFE
|
|
Received Date | | 12/6/1995 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1995-10010
|
|
Description | | The proposed activity is for the continued operation of a harvest for subtidal geoduck clams on state-owned lands in Jefferson County. The harvest will take place on seven commercial geoduck beds and will take approximately five years to complete.
|
|
Last Name | | WA ST DNR
|
|
Received Date | | 11/17/1995 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | XMP1995-00066
|
|
Description | | replace three pilings and repair ramp
|
|
Last Name | | OLYMPIC CANAL MAINTENANCE CO
|
|
Received Date | | 11/16/1995 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1995-00055
|
|
Description | | Bank Stabilization
|
|
Last Name | | JEFFERSON CO PUBLIC WORKS DEPT
|
|
Received Date | | 10/16/1995 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1995-00043
|
|
Description | | Project is to control and eradicate the spread of Spartina within the littoral zone at Dosewallips State Park. The project will consist of wiping and spraying affected area with Rodeo, mowing a control site to gage effectiveness of treatments, and covering sites with geotextile fabric. Approximately 8500 square feet of affected area will be treated. Project site will be sprayed and wiped by a licensed applicator and herbicide concentrations will conform with the standards outlined in the Environmental Impact Statement published by the Department of Agriculture for noxious weed control.
|
|
Last Name | | WA ST PARKS & RECREATION
|
|
Received Date | | 7/14/1995 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1995-10001
|
|
Description | | Harvest Geoducks for relay and placement in a float for cleansing.
|
|
Last Name | | SEABED HARVESTING INC
|
|
Received Date | | 2/10/1995 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | XMP1994-00026
|
|
Description | | ?
|
|
Last Name | | NAVAL UNDERSEA WARFARE CENTER
|
|
Received Date | | 6/15/1994 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | XMP1994-00023
|
|
Description | | Rip-rap repair to existing sea walls to protect Shine Rd & rebuild shoulders as part of normal maintenance to prevent total loss of the road.
|
|
Last Name | | JEFFERSON CO PUBLIC WORKS DEPT
|
|
Received Date | | 6/13/1994 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1994-10005
|
|
Description | | to construct a wildlife viewing platform at the Dosewallips State Park in Brinnon. The applicant is the owner of the site described below.
|
|
Last Name | | STATE PARKS & RECREATION COMM
|
|
Received Date | | 2/22/1994 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1994-00002
|
|
Description | | PROPOSAL: Routine maintenance on the Hood Canal Bridge by replacing the grid deck.
|
|
Last Name | | STATE DEPT OF TRANSPORTATION
|
|
Received Date | | 12/27/1993 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1993-00033
|
|
Description | | Install a restrainer on the Duckabush slough bridge and the Fulton creek bridge
|
|
Last Name | | STATE OF WASHINGTON - DOT
|
|
Received Date | | 8/24/1993 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1993-00027
|
|
Description | | Mooring buoy - renewal
|
|
Last Name | | HOCKEISER
|
|
Received Date | | 8/9/1993 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1993-00005
|
|
Description | | Place approx 80 ft of rip rap for SFR
|
|
Last Name | | CARLSEN
|
|
Received Date | | 2/27/1993 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1993-00007
|
|
Description | | 60ft of rip rap 8 ft in height with access stairs in common with a SFR
|
|
Last Name | | ROMIG
|
|
Received Date | | 10/6/1992 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1992-00065
|
|
Description | | Mooring Buoy for recreational use
|
|
Last Name | | HOCKEISER
|
|
Received Date | | 8/31/1992 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1992-00040
|
|
Description | | Replace a wood ramp with a new wood ramp of similar dimensions
|
|
Last Name | | COYLE COMMUNITY CLUB
|
|
Received Date | | 6/15/1992 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1992-00029
|
|
Description | | Construct a domestic water main, fire hydrants, and other appurtenances.
|
|
Last Name | | PUBLIC UTILITIES DISTRICT NO 1
|
|
Received Date | | 4/22/1992 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1992-00008
|
|
Description | | Set two property boundary signs on the tidelands of Wolfe Property State Park
|
|
Last Name | | WA STATE PARKS AND REC COMMISSION
|
|
Received Date | | 1/23/1992 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | XMP1991-00021
|
|
Description | | PROPOSAL: To install 130 lineal feet of fence across one slough in the high intertidal zone of Hood Canal and/or its associated wetlands for evaluation of seal relocation and improvement of water quality.
|
|
Last Name | | WA ST PARKS & RECREATION
|
|
Received Date | | 2/28/1991 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1990-00056
|
|
Description | | PROPOSAL: The proposal is to replace an existing vault toilet.
|
|
Last Name | | WA ST PARKS & RECREATION
|
|
Received Date | | 10/10/1990 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1990-00016
|
|
Description | | PROPOSAL: To repair and maintain existing dock, pier, ramp, and access road at the Triton Cove boat launch facility.
|
|
Last Name | | WA ST PARKS & RECREATION
|
|
Received Date | | 5/3/1990 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1990-00015
|
|
Description | | PROPOSAL: To place a 10 foot by 30 foot wooden float in Hood Canal for three months for research into seal haul out behavior
|
|
Last Name | | CASCADIA RESEARCH COLLECTIVE
|
|
Received Date | | 4/13/1990 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1989-00033
|
|
Description | | Place mooring buoy and 3 rebar racks for cultivation of oysters,
|
|
Last Name | | SMITH
|
|
Received Date | | 7/14/1989 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1989-00009
|
|
Description | | PROPOSAL: To test a boat-mounted hydraulic/airlift clam harvester for use in harvesting juvenile razor clams for transplanting. The testing would be videotaped. There would be a maximum of 20 hours on-bottom times between mid-April and mid-May 1989.
|
|
Last Name | | STATE DEPT OF FISH & WILDLIFE
|
|
Received Date | | 5/4/1989 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | XMP1986-00049
|
|
Description | | Maintain existing raceways, place PVC pipe on bottom of raceways, and remove existing pipe.
|
|
Last Name | | STATE OF WASHINGTON -FISH/WDLF
|
|
Received Date | | 12/12/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1986-10009
|
|
Description | | SET OF 22 NET PENS OFF EXISTING PIER FOR SALMON REARING FACILITY AT OLD SOUTH PT FERRY TERMINAL.
|
|
Last Name | | STATE OF WASHINGTON-DOT
|
|
Received Date | | 6/16/1986 4:24:18 PM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1986-00012
|
|
Description | | Temporary marking buoys in the water to locate salmon rearing test pen sites.
|
|
Last Name | | SEA FARM OF NORWAY, INC.
|
|
Received Date | | 3/3/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1986-10002
|
|
Description | | CONDUCT SALMON REARING TESTS IN HOOD CANAL OFF HOOD HEAD
|
|
Last Name | | SEA FARM OF NORWAY, INC.
|
|
Received Date | | 1/17/1986 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1985-00017
|
|
Description | | Clam harvesting and processing
|
|
Last Name | | IVAR'S CLAM FARMS
|
|
Received Date | | 12/26/1985 12:00:00 AM
|
|
Status | | Denied
|
|
| | |
|
|
Case Number | | SDP1985-00009
|
|
Description | | Net pens, on land and in water
|
|
Last Name | | PEDERSON
|
|
Received Date | | 6/3/1985 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | SDP1985-00001
|
|
Description | | Install temporary, scallop seed, collection system
|
|
Last Name | | THOMAS
|
|
Received Date | | 1/28/1985 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1983-00003
|
|
Description | | Test underwater clam harvester in Hood Canal by Boulton Peninsula
|
|
Last Name | | RICKARD
|
|
Received Date | | 1/14/1983 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1983-10001
|
|
Description | | Installation of experimental buoy system designed to collect floating scallop seed
|
|
Last Name | | WA STATE DEPT OF FISHERIES
|
|
Received Date | | 1/2/1983 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1982-00030
|
|
Description | | Test harvesting of hardshell clam beds
|
|
Last Name | | WESTLEY
|
|
Received Date | | 8/26/1982 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1982-00007
|
|
Description | | Install 20 connecting oyster spat collection floats, measuring overall approx 1,250 sq/ft
Near Seal Rock
|
|
Last Name | | POWELL
|
|
Received Date | | 4/22/1982 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1981-10007
|
|
Description | | Place 3 mussel culture rafts
|
|
Last Name | | DAVID A WILSON
|
|
Received Date | | 3/16/1981 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1979-10012
|
|
Description | | Construct a boat ramp and install a float structure
|
|
Last Name | | UDDENBERG
|
|
Received Date | | 8/30/1979 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1979-10011
|
|
Description | | Replace a submarine eletrical distribution cable on the bottom of Hood Canal to improve electrical service
|
|
Last Name | | PUGET SOUND POWER AND LIGHT CO
|
|
Received Date | | 8/29/1979 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1979-10001
|
|
Description | | Beach rehab for hardshell clam stocks; 5 1-acre lots in the lower intertidal zone by placement of select gravel.
|
|
Last Name | | WASHINGTON STATE DEPT OF FISHERIES
|
|
Received Date | | 1/22/1979 9:20:24 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1978-00026
|
|
Description | | Testing of seven subtidal clam areas
|
|
Last Name | | LINDSEY
|
|
Received Date | | 11/9/1978 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1978-10027
|
|
Description | | Construct a private moorage facility; pier (5 X 55 feet); piling; ramp (3 X 42 feet); float (24 X 40 feet outside measurement with 12 X 35 foot cavity).
|
|
Last Name | | BOLING
|
|
Received Date | | 10/25/1978 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1978-10028
|
|
Description | | Construct a private moorage facility; pier (6 X 40 feet); piles; ramp (4 X 35 feet); float ("L" shaped, 40 feet in length).
|
|
Last Name | | BOLING
|
|
Received Date | | 10/25/1978 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1978-10022
|
|
Description | | Placement of a 5'2" X 16'6" recreation/moorage float
|
|
Last Name | | JACK L MERRICK
|
|
Received Date | | 7/6/1978 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1978-10023
|
|
Description | | Moorage bouy and 12 X 12 foot float
|
|
Last Name | | WILLIAMS
|
|
Received Date | | 7/5/1978 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1978-10018
|
|
Description | | Placement of private mooring bouys
|
|
Last Name | | COLLINS
|
|
Received Date | | 6/16/1978 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1978-10010
|
|
Description | | Placement of a boat moorage bouy and 12' X 12' anchored float for swimming and as a water skiing platform
|
|
Last Name | | F BYRON SWIGART
|
|
Received Date | | 4/14/1978 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1978-10008
|
|
Description | | Permanent location for seasonal moorage of barges: together with loading and unloading of oyster seed cultch and oysters, with moveable ramp between shore and barge.
|
|
Last Name | | DUNGENESS OYSTER FARMS, INC
|
|
Received Date | | 2/24/1978 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1977-00013
|
|
Description | | Hood Canal Bridge lower deck repair on Pontoon E.
|
|
Last Name | | ZIRKLE
|
|
Received Date | | 7/19/1977 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1977-10011
|
|
Description | | Remove existing waterline and bury a 4" class 200 PUC line under teh dredged boat canal between the existing well and Div 3.
|
|
Last Name | | PUGET SOUND EXCHANGE CORP
|
|
Received Date | | 6/2/1977 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1977-10006
|
|
Description | | Provide anchorage for herring storage pens concurrent with season herring fish operations.
|
|
Last Name | | KITSAP BAIT SALES
|
|
Received Date | | 3/8/1977 2:31:22 PM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1977-10005
|
|
Description | | Develop a recreational preserve consisting of 394 campsites, clubhouse, swimming pool, tennis courts, soccer field, baseball fields, hiking trails, boat ramp, and pier.
|
|
Last Name | | EVERGREEN ENVIRONMENTAL DEVEL. CORP
|
|
Received Date | | 1/25/1977 2:16:31 PM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | SDP1976-10016
|
|
Description | | Increase width of existing boat ramp ten feet, add parallel floating walk (4' X 100') with a landing and access ramp.
|
|
Last Name | | NAUD
|
|
Received Date | | 3/29/1976 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1976-10012
|
|
Description | | Private boat moorage float (6' X 9') which will be shared by 3 other adjacent property owners.
|
|
Last Name | | PETORAK
|
|
Received Date | | 2/25/1976 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1976-00003
|
|
Description | | Replace electrical cables on floating bridge
|
|
Last Name | | BRASCHNER
|
|
Received Date | | 1/23/1976 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1975-10024
|
|
Description | | Installation of a mooring bouy with attached boat retrieval line
|
|
Last Name | | COLLINS
|
|
Received Date | | 12/8/1975 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1975-10020
|
|
Description | | Temporary seasonal moorage of herring holding pens concurrent with bait herring fishing operations
|
|
Last Name | | KITSAP BAIT SALES
|
|
Received Date | | 9/23/1975 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1975-10010
|
|
Description | | Aquaculture
|
|
Last Name | | WASHINGTON MARINE LIFE ASSOCIATION
|
|
Received Date | | 5/7/1975 12:00:00 AM
|
|
Status | | Withdrawn
|
|
| | |
|
|
Case Number | | SDP1973-10063
|
|
Description | | Community beach access and boat ramp
|
|
Last Name | | PLEASANT TIDES PRP
|
|
Received Date | | 11/16/1973 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1972-10036
|
|
Description | | Construction of fish pens, oysters rafts and shore facilities
|
|
Last Name | | MARICULTURE NORTHWEST INC
|
|
Received Date | | 10/20/1972 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1972-10032
|
|
Description | | Construction of private boat dock
|
|
Last Name | | CARLSON RADABOUGH
|
|
Received Date | | 10/5/1972 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1972-10031
|
|
Description | | To improve the swimming area and construct a boat ramp
|
|
Last Name | | OLY CANAL MAINTENANCE CO
|
|
Received Date | | 10/3/1972 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1972-10028
|
|
Description | | Submarine cable and terminal stations
|
|
Last Name | | PUGET SOUND POWER AND LIGHT COMPANY
|
|
Received Date | | 7/20/1972 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1971-10004
|
|
Description | | Condominiums with boat slip
|
|
Last Name | | CHG INTERNATIONAL
|
|
Received Date | | 11/1/1971 12:00:00 AM
|
|
Status | | Denied
|
|
| | |
|
|
Case Number | | SDP1971-10001
|
|
Description | | Underground/underwater installation of 3 single conductor 15 KV cables as shore end connections and 1-3 conductor 25 KV submarine cable from Salsbury Point-Kitsap County to Shine-Jefferson County.
|
|
Last Name | | PUGET SOUND POWER & LIGHT COMPANY
|
|
Received Date | | 7/22/1971 12:00:00 AM
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1974-10004
|
|
Description | | To retain existing bulkhead and fill, place rock ripe rap from ground level of bulkhead to MHHW line on bulkhead
|
|
Last Name | | MUSIEL
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|
|
Case Number | | SDP1974-10006
|
|
Description | | To retain existing bulkhead and fill, place rock rip-rap from ground level of bulkhead to the MHHW line on the bulkhead
|
|
Last Name | | AUSTIN
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|
|
Case Number | | XMP1975-00006
|
|
Description | | Herring pens in Squamish Harbor
|
|
Last Name | | NELSON
|
|
Received Date | |
|
|
Status | | E
|
|
| | |
|