Permit Case Summary

Case Number: Search Help

Case Number:SDP2002-00029 Case Status:Finaled Date Received:6/10/2002
Description:To repair a destabilized bank at the southern abutment of Fulton Creek Bridge. High water events and tidal action have eroded the fill supporting the south bridge abutment, causing destabilization and undercutting of the embankment and erosion of the SR 101 shoulder up to the traveled roadway. Project work will entail removal of existing concrete grout sacks used as armament on the south bank of Fulton Creek at an equal distance both east and west of the bridge span and under the bridge abutments, construction of a rock toe along 100 feet of scoured steam bank, construction of a rock buttress above the rock toe, and incorporation of largely woody debris along the scoured steam bank. Work will occur within the wetted perimeter of Fulton Creek at low tide cycles during the open work window designated by WDFW. The project is expected to result in long term improvement to Fulton Creek baseline conditions for water quality and stream bank conditions. Date Issued:7/11/2002
Applicant: STATE OF WASHINGTON-DOT Expiration Date:7/11/2003 12:00:00 AM
Site Address:HWY 101 Case Finaled:
Parcel No:000000220 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 12/6/2004
Disposition: DONE
Description: Close case
Date Completed: 7/23/2003
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 7/11/2002
Disposition: DONE
Description: Review Complete-U
Date Completed: 7/11/2002
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 6/18/2002
Disposition: DONE
Description: Case Entered
Date Completed: 6/10/2002
Disposition:
Description: Septic Review Complete-U
Date Completed: 7/11/2002
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 6/18/2002
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 7/11/2002
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 7/11/2002
Disposition: DONE
Description: Consistency Review-U
Date Completed: 7/11/2002
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 7/11/2002
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Discharge oil: state & fed regs
Wording The proponents shall comply with all relevant state and federal regulations pertaining to the discharge of oil.

Title: Notification Prior to Beginning
Wording The proponent shall notify the Jefferson County Department of Community Development at (360) 379-4450 forty-eight (48) hours prior to commencing construction in order to allow monitoring and ensure compliance with permit conditions.

Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: Treated Materials Must be Cured
Wording All lumber and other materials treated with preservative shall be sufficiently cured to minimize leaching into the water or shore bed, in accordance with the Best Management Practices approved by the Washington Department of Fish and Wildlife.

Title: Site Plan
Wording Construction shall be in substantial compliance with the site plan submitted on 6/10/02 as it exists now or is hereafter amended by Jefferson County and/or the Washington Department of Ecology.

Title: No Fill or Other Material
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Hydraulic Code/HPA Check
Wording Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.

Title: Comply with HPA
Wording In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.

Title: Army Corps Check
Wording Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Stormwater
Wording Sections 6.6 & 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a Stormwater Managment Plan to address sedimentation and erosion control along the construction zone. In addition, the proposal shall identify areas of replanting once the project has been completed.

Title: F-HPA Issued
Wording The Washington Department of Fish and Wildlife issued Hydraulic Project Approval (HPA) for this activity on 6/18/02 under Log Number ST788801. The HPA expires on 1/01/04.

Title: F-DNS Issued
Wording The Washington State Department of Transportation issued a DNS for the proposal. The comment period expired on May 24, 2002.

Title: F-Site Plan Changes
Wording The site plan as submitted with the Shoreline application on 6/10/02 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 7/11/02 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-SDP Exemption Section
Wording The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section 3.402.6 and is consequently exempt from the substantial development permit (SDP) requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements. In addition, WAC 173-27-40(2)(b) identifies the exemption for the proposed project.