Permit Case Summary

Case Number: Search Help

Case Number:SDP2002-00028 Case Status:Finaled Date Received:5/31/2002
Description:The proposed activity is the maintenance dredging of teh entrance chanel to the Cape George Colony Club marina's boat basin. Dredging of is necessary at periodic intervals to remove approximately 900 yards annually of material deposited by wave action, and will be placed back on the beach as described in permits 00-E2210-03 (WDFW) and 1999-2-00515 (US Army Corps of Engineers). Date Issued:6/26/2002
Applicant: CAPE GEORGE COLONY CLUB Expiration Date:6/26/2003 12:00:00 AM
Site Address:MARINA DR Case Finaled:
Parcel No:941500007 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 12/6/2004
Disposition: DONE
Description: Close case
Date Completed: 9/30/2002
Disposition: DONE
Description: Review Complete-U
Date Completed: 6/26/2002
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 6/26/2002
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 6/10/2002
Disposition: DONE
Description: Case Entered
Date Completed: 5/31/2002
Disposition:
Description: Septic Review Complete-U
Date Completed: 6/26/2002
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 6/10/2002
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 6/26/2002
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 6/26/2002
Disposition: DONE
Description: Consistency Review-U
Date Completed: 6/26/2002
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 6/26/2002
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Notification Prior to Beginning
Wording The proponent shall notify the Jefferson County Department of Community Development at (360) 379-4450 forty-eight (48) hours prior to commencing construction in order to allow monitoring and ensure compliance with permit conditions.

Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: No Fill or Other Material
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: Comply with HPA
Wording In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.

Title: Army Corps Check
Wording Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Custom Universal Finding
Wording The applicant has also obtained a permit from the US Army Corps. of Engineers (permit no. 1999-2-00515), which expires on 7/12/05.

Title: F-Custom Universal Finding
Wording This proposal was reviewed under SEPA and adoption of an existing environmental document per WAC 197-11-600. A Mitigated Determination of Non-Signficance was adopted on 3/24/00.

Title: F-HPA Issued
Wording The Washington Department of Fish and Wildlife issued Hydraulic Project Approval (HPA) for this activity filed under Log Number 00-E2210-03. The HPA expires on 7/12/05.