Case Number | | ZON2012-00024
|
|
Description | | WATER SYSTEM PLAN FOR CAPE GEORGE COLONY
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 8/27/2012 2:28:34 PM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | USR2011-00053
|
|
Description | | DECOMMISSION USR 11-26, DRY (well #7)
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 11/9/2011 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | USR2011-00045
|
|
Description | | see also usr07-92 and usr11-12, sanitary control inspections. Proposed well #8
see also CAPE GEORGE COLONY WATER SYSTEM FILE.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 10/6/2011 12:00:00 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | USR2011-00026
|
|
Description | | see usr11-12, (sanitary control inspection of this proposed well). PROPOSED WELL #7
see also CAPE GEORGE COLONY WATER SYSTEM FILE.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 6/7/2011 12:00:00 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | USR2011-00012
|
|
Description | | SANITARY CONTROL INSPECTION FOR GROUP A WELL
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 3/24/2011 12:00:00 AM
|
|
Status | | Pending
|
|
| | |
|
|
Case Number | | USR2008-00063
|
|
Description | | reconstruction of well #5
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 9/16/2008 12:00:00 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | USR2008-00039
|
|
Description | | THIS IS A DECOMMISSIONING OF USR07-120 A DRY HOLE
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 6/5/2008 12:00:00 AM
|
|
Status | | DCM
|
|
| | |
|
|
Case Number | | USR2008-00012
|
|
Description | | FILED WITH CAPE GEORGE COLONY WS FILE.
decommissioning of USR07-98
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 2/19/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | USR2008-00013
|
|
Description | | FILED WITH CAPE GEORGE COLONY WS FILE.
DECOMMISSIONING OF USR07-119
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 2/19/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | USR2007-00119
|
|
Description | | FILED WITH CAPE GEORGE COLONY WATER SYSTEM FILE. third attempt refered to by drillers as "relief hole", located 5'+/- from usr07-98.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 11/15/2007 12:00:00 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | USR2007-00120
|
|
Description | | Well Decommissioned by USR08-39.. This was the fourth attempt to drill. Now filed
W/ CAPE GEORGE WATER SYSTEM FILE.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 11/15/2007 12:00:00 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | USR2007-00097
|
|
Description | | FILED WITH CAPE GEORGE COLONY WATER SYSTEM FILE
decommissioning of usr07-76, inapproriate location per driller and operator
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 9/4/2007 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | USR2007-00098
|
|
Description | | FILED WITH CAPE GEORGE COLONY WATER SYSTEM FILE. SECOND ATTEMPT TO replacement well for so#5 cape george colony. see also usr07-75, usr7-76 usr07-97 and public water supply well site inspection report usr07-92.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 9/4/2007 12:00:00 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | USR2007-00092
|
|
Description | | Sanitary control inspection for new well.
FILED WITH CAPE GEORGE COLONY WATER SYSTEM FILE
well site inspection for public water supply, see also usr07-75 and 76
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 8/20/2007 12:00:00 AM
|
|
Status | | Pending
|
|
| | |
|
|
Case Number | | USR2007-00075
|
|
Description | | FILED WITH CAPE GEORGE COLONY WATER SYSTEM FILE
decommissioning of old rusted out well, see also replacement well application USR07-76.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 7/3/2007 12:00:00 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | USR2007-00076
|
|
Description | | FILED WITH CAPE GEORGE COLONY WATER SYSTEM FILE, First attempt
9/4/07, see usr07-97 decommissioned by driller and operator decided that well located too close to SO#5.
will relocate to original location. (see usr07-98)
replacement well for well SO#5 cape george colony, decommission application USR07-75. see also usr07-92, public water supply site inspection
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 7/3/2007 12:00:00 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | BLD2005-00607
|
|
Description | | NEW STEEL RE-INFORCED CONCRETE WATER STORAGE TANK (ABOVE GROUND), which is approximately 15 feet tall by 30 feet diameter. The purpose of the tank is to meet water and fire flow requirements for existing lots within Cape George Colony. There are currently a well field comprised of three wells, three storage tanks, and a filtration building on this parcel.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 9/20/2005 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2005-00006
|
|
Description | | SHORELINE EXEMPTION FOR DREDGING MARINA ENTRANCE-Shoreline Exemption to conduct hydraulic dredging to remove approximately 900 cubic yards of material which will be placed on the beach as stipulated through the conditions described in permits ST-G2933-03 issued by the Washington Department of Fish and Wildlife on January 31, 2005, and a pending permit number 2004-00887 for the US Army Corps of Engineers. The proposal also includes the routine maintenance of docks, ramps, and other infrastructure of the marina. A threshold determination for routine maintenance dredging was completed on June 2, 1999.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 2/22/2005 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2004-00007
|
|
Description | | Shoreline Exemption to conduct hydraulic dredging to remove approximately 900 cubic yards of material which will be placed on the beach as stipulated through the conditions described in permits 00-EE2210-01 issued by the Washington Department of Fish and Wildlife, and permit number 1999-2-00515 issued by the US Army Corps of Engineers.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 4/20/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2003-00004
|
|
Description | | Shoreline Exemption to conduct hydraulic dredging to remove approximately 900 cubic yards of material which will be placed on the beach as stipulated through the conditions described in permits 00-EE2210-01 issued by the Washington Department of Fish and Wildlife, and permit number 1999-2-00515 issued by the US Army Corps of Engineers.
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 1/23/2003 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2002-00028
|
|
Description | | The proposed activity is the maintenance dredging of teh entrance chanel to the Cape George Colony Club marina's boat basin. Dredging of is necessary at periodic intervals to remove approximately 900 yards annually of material deposited by wave action, and will be placed back on the beach as described in permits 00-E2210-03 (WDFW) and 1999-2-00515 (US Army Corps of Engineers).
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 5/31/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SDP2001-00013
|
|
Description | | Shoreline Exemption to conduct hydraulic dredging to remove approximately 900 cubic yards of material which will be placed on the beach as stipulated through the conditions described in permits 00-EE2210-01 issued by the Washington Department of Fish and Wildlife, and permit number 1999-2-00515 issued by the US Army Corps of Engineers.
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 4/9/2001 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2000-00455
|
|
Description | | BUILDING FOR WATER FILTRATION SYSTEM
|
|
Last Name | | CAPE GEORGE COLONY CLUB
|
|
Received Date | | 7/17/2000 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP2000-00002
|
|
Description | | The proposal involves the routine maintenance dredging, over a one year period, of the existing marina access channel through the periodic removal of accumulated sand, silt and small stones. Dredged materials will be placed along the base of existing riprap located to the south side of the marina entrance. Review pursuant to the State Environmental Policy Act (SEPA) will be accomplished through the adoption of an existing environmental document.
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 2/14/2000 11:27:40 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | XMP1998-00047
|
|
Description | | Maintenance dredging of a reduced (depth and breath) marina access channel (20' wide at a depth of -3.5' MLLW). Dredging consists of the periodic removal of accumulated sand, silt and cobbles. Dredged materials shall be deposited at an approved site per permit review.
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 10/14/1998 12:00:00 AM
|
|
Status | | E
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | OTH1998-00007
|
|
Description | |
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 2/5/1998 12:00:00 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | BLD1994-00021
|
|
Description | | remodel of men's swimming pool dressing rm
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 1/12/1994 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1993-00443
|
|
Description | | cmu wellhouse
|
|
Last Name | | CAPE GEORGE COLONY CLUB INC
|
|
Received Date | | 6/28/1993 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD1981-00065
|
|
Description | | Two 54,000 gallon water tanks
|
|
Last Name | | CAPE GEORGE COLONY
|
|
Received Date | | 1/15/1981 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|