Permit Case Summary

Case Number: Search Help

Case Number:SDP1999-00008 Case Status: Date Received:6/17/1999
Description:The proposal involves the installation of a submarine communication cable which will traverse the Hood Canal. The cable will be buried approximately 3 to 4 feet below the ground surface and will daylight in Jefferson County immediately north of the Hood Canal Bridge on a site containing a power substation owned and operated by Puget Sound Energy. Shine Tidelands State park is located just north of the proposed landing area. After crossing the Hood Canal, the cable will be tied in with existing aerial systems. The proposed cable placement is part of a larger project to supply telecommunications service for the Olympic Penninsula. Date Issued:11/4/1999
Applicant: US WEST COMMUNICATIONS Expiration Date:11/4/2004 12:00:00 AM
Site Address: BLANK PARCEL FILE Case Finaled:
Parcel No:HOODCANAL Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: Issue CUP/Variance Permit
Date Completed: 11/4/1999
Disposition: P
Description: (F) Hearing Examiner PH Notice
Date Completed: 10/19/1999
Disposition:
Description: (F) Hearing Examiner PH Notice
Date Completed: 10/5/1999
Disposition: P
Description: (F) Issue Final MDNS +10
Date Completed: 9/13/1999
Disposition:
Description: (F) SEPA Threshold (MDNS) +14
Date Completed: 9/1/1999
Disposition: P
Description: App Substantially Complete (F)
Date Completed: 7/1/1999
Disposition: P
Description: (F) SDP Application Notice +30
Date Completed: 8/6/1999
Disposition: P
Description: Pre-application conference
Date Completed: 5/19/1999
Disposition: P
Description: Shoreline Planner Review
Date Completed: 6/24/1999
Disposition: P

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: CUSTOM CONDITION
Wording The applicant shall follow all conditions of the Hydraulic Project Approval (HPA) issued by the Department of Fish and WIldlife on September 7, 1999.

Title: CUSTOM CONDITION
Wording The applicant shall contact the Department of Natural Resources, Aquatic Lands Manager at (360) 374-6131 in order to determine whether or not the proposed communication cable requires a land use permit.

Title: CUSTOM CONDITION
Wording Construction shall be in substantial compliance with the submitted site plan as it exists now or is hereafter amended by Jefferson County and/or the Department of Ecology.

Title: CUSTOM CONDITION
Wording No fill or other materials may be placed in the waters or intertidal areas of Jefferson County.

Title: CUSTOM CONDITION
Wording Work within the jurisdiction of the Shoreline Program other than as described above shall recieve separate review from this office.

Title: CUSTOM CONDITION
Wording Typical Best Management Practices for Erosion and Sediment Control, as detailed in the 1994 Department of Ecology Stormwater Management Manual for the Puget Sound Basin, shall be employed during upland construction.

Title: CUSTOM CONDITION
Wording Prior to installation, the proponent shall notify the Jefferson County Department of Community Development at (360) 379-4464 with estimated project timelines for monitoring and plan compliance.

Title: CUSTOM CONDITION
Wording Wherever feasible the communication cable shall be installed adjacent to or within existing utility or circulation easements or right-of-way.

Title: CUSTOM CONDITION
Wording water quality and marine life shall not suffer degradation as a result of cable installation. Both during and after installation, geohydraulic shore processes and marine life shall be basically maintained in their natural condition.

Title: CUSTOM CONDITION
Wording The cable and its installation shall be designed and constructed to minimze hazards to commercial and recreational fishing interests. Cable installation shall take place at a time of year that does not substantially interfere with recreational or commercial shellfish harvest.

Title: CUSTOM CONDITION
Wording Prior to construction, the applicant shall obtain all other necessary approvals from the Washington Department of Ecology and U.S. Army Corps of Engineers.

Title: CUSTOM CONDITION
Wording The proponent shall comply with the mitigative measures identified in the Final Mitigated Determination of Non-significance issued on September 15, 1999 by Jefferson County.