Description:
|
| | |
Status updtd - Energov Convrsn
|
|
Date Completed:
|
| | |
10/4/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue CUP/Variance Permit
|
|
Date Completed:
|
| | |
11/4/1999
|
|
Disposition:
|
| | |
P
|
|
|
Description:
|
| | |
(F) Hearing Examiner PH Notice
|
|
Date Completed:
|
| | |
10/19/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
(F) Hearing Examiner PH Notice
|
|
Date Completed:
|
| | |
10/5/1999
|
|
Disposition:
|
| | |
P
|
|
|
Description:
|
| | |
(F) Issue Final MDNS +10
|
|
Date Completed:
|
| | |
9/13/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
(F) SEPA Threshold (MDNS) +14
|
|
Date Completed:
|
| | |
9/1/1999
|
|
Disposition:
|
| | |
P
|
|
|
Description:
|
| | |
App Substantially Complete (F)
|
|
Date Completed:
|
| | |
7/1/1999
|
|
Disposition:
|
| | |
P
|
|
|
Description:
|
| | |
(F) SDP Application Notice +30
|
|
Date Completed:
|
| | |
8/6/1999
|
|
Disposition:
|
| | |
P
|
|
|
Description:
|
| | |
Pre-application conference
|
|
Date Completed:
|
| | |
5/19/1999
|
|
Disposition:
|
| | |
P
|
|
|
Description:
|
| | |
Shoreline Planner Review
|
|
Date Completed:
|
| | |
6/24/1999
|
|
Disposition:
|
| | |
P
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The applicant shall follow all conditions of the Hydraulic Project Approval (HPA) issued by the Department of Fish and WIldlife on September 7, 1999.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The applicant shall contact the Department of Natural Resources, Aquatic Lands Manager at (360) 374-6131 in order to determine whether or not the proposed communication cable requires a land use permit.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Construction shall be in substantial compliance with the submitted site plan as it exists now or is hereafter amended by Jefferson County and/or the Department of Ecology.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
No fill or other materials may be placed in the waters or intertidal areas of Jefferson County.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Work within the jurisdiction of the Shoreline Program other than as described above shall recieve separate review from this office.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Typical Best Management Practices for Erosion and Sediment Control, as detailed in the 1994 Department of Ecology Stormwater Management Manual for the Puget Sound Basin, shall be employed during upland construction.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Prior to installation, the proponent shall notify the Jefferson County Department of Community Development at (360) 379-4464 with estimated project timelines for monitoring and plan compliance.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Wherever feasible the communication cable shall be installed adjacent to or within existing utility or circulation easements or right-of-way.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
water quality and marine life shall not suffer degradation as a result of cable installation. Both during and after installation, geohydraulic shore processes and marine life shall be basically maintained in their natural condition.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The cable and its installation shall be designed and constructed to minimze hazards to commercial and recreational fishing interests. Cable installation shall take place at a time of year that does not substantially interfere with recreational or commercial shellfish harvest.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Prior to construction, the applicant shall obtain all other necessary approvals from the Washington Department of Ecology and U.S. Army Corps of Engineers.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The proponent shall comply with the mitigative measures identified in the Final Mitigated Determination of Non-significance issued on September 15, 1999 by Jefferson County.
|
|