Description:
|
| | |
Final Inspection Approval
|
|
Date Completed:
|
| | |
8/29/2011
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Permit
|
|
Date Completed:
|
| | |
1/13/2011
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Print ESA Review Form-F
|
|
Date Completed:
|
| | |
1/5/2011
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
1/5/2011
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
1/13/2011
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
1/13/2011
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
1/13/2011
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
1/13/2011
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
NO CULVERT
|
|
Wording
|
| | |
the access must accommodate a 10 to 16 foot wide driveway with 10-25 foot approach radius. An approach culvert is not necessary at this location at this time; however, if drainage becomes a problem here in the future the county reserves the right to require one.
|
|
|
Title:
|
| | |
CONSTAPPROACH
|
|
Wording
|
| | |
The applicant shall be responsible for maintaining a stabilized construction entrance, which shall be constructed as follows: 4 inch to 8 inch quarry spalls a minimum of 12 inches deep, a minimum width of 20 feet, a minimum radius of 25 feet, and a minimum length of 100 feet from the county road. The applicant shall also be responsible for immediately removing any material spilled or tracked onto the county road.
|
|
|
Title:
|
| | |
SURFACE WATER
|
|
Wording
|
| | |
The grade of the approach shall follow the crown of the road and be such that no surface water is directed not onto the county road.
|
|
|
Title:
|
| | |
PRE-CON
|
|
Wording
|
| | |
Applicant must give Jefferson County Public Works office (360-385-9159) a minimum of 7 working days notice prior to beginning work. An on-site pre-construction conference shall be scheduled by the applicant and will include Public Works and the contractor who will be performing the work.
|
|
|
Title:
|
| | |
FINAL INSPECTION
|
|
Wording
|
| | |
The Applicant must contact the Public Works Department for a final inspection upon completion of the installation.
|
|