Cases Associated with Parcel No: 602353005

This may not be a complete listing of information that exists for this parcel. There may be other information pertinent to the property on file. Please contact the Department of Community Development for additional information.



Case Number  SOM2011-01086
Description  serves Dosiwallips State Park - State of Washington Sewage System case #ST62-51
Last Name  STATE OF WASHINGTON PARK & REC
Received Date  11/16/2017 2:30:58 PM
Status  LOS
  

Case Number  BLD2015-00012
Description  FIRE ALARM SYSTEM FOR DOSEWALLIPS STATE PARK SEWAGE TREATMENT FACILITY. JOINT VENTRUE BETWEEN SIMPLEX GRINNELL & OLYMPIC ELECTRIC.
Last Name  STATE OF WASHINGTON PARKS
Received Date  1/12/2015 8:46:24 AM
Status  Finaled
LaserFiche Links  View LaserFiche Documents

Case Number  BLD2014-00069
Description  Pump house enclosure, operations room for new sewage treatment plant, and equipment pads
Last Name  STATE OF WASHINGTON PARKS
Received Date  2/27/2014 2:53:33 PM
Status  Finaled
LaserFiche Links  View LaserFiche Documents

Case Number  USR2011-00028
Description  APPLICATION FOR PUBLIC WATER SUPPLY INSPECTION SEE ALSO USR11-29 (filed in proposed group b water system, dosewallip sp)
Last Name  STATE OF WASHINGTON PARKS
Received Date  6/9/2011 12:00:00 AM
Status  Approved
  

Case Number  USR2011-00029
Description  See also USR11-28 (sanitary control inspection for proposed group b system) (filed in proposed group b water system, dosewallip sp
Last Name  STATE OF WASHINGTON PARKS
Received Date  6/9/2011 12:00:00 AM
Status  Approved
  

Case Number  FPA2610914
Description  1.91-acre timber harvest and 650 feet of road construction. (See MLA10-00139 for COHP).
Last Name  STATE OF WASHINGTON PARKS
Received Date  1/26/2011 12:00:00 AM
Status  INP
  

Case Number  ADR2011-00099
Description  NEW ADDRESS
Last Name  
Received Date  1/10/2011 12:00:00 AM
Status  Finaled
LaserFiche Links  View LaserFiche Documents

Case Number  RAP2011-00001
Description  RAP & 911 - Church Rd
Last Name  STATE OF WASHINGTON PARKS
Received Date  1/5/2011 12:00:00 AM
Status  Finaled
  

Case Number  FPA2010-00001
Description  Conversion Option Harvest Plan - COHP to include harvesting of an approximately 20 acre site of approximately 25,000 board feet (1.91 acres) to provide 650 feet of driveable access to a 57,500 square foot cleared area for placement of a sewage treatment facility. Approximately 18.3 acres surrounding the cleared area will remain undisturbed as a buffer to adjacent properties. This proposal requires a Type II COHP with a Forest Practice Permit from the Department of Natural Resources.
Last Name  STATE OF WASHINGTON PARKS
Received Date  12/16/2010 12:00:00 AM
Status  CLS
  

Case Number  BLD2010-00387
Description  STORMWATER PERMIT FOR TREATMENT FACILITY SITE - BLD10-00387
Last Name  STATE OF WASHINGTON PARKS
Received Date  11/15/2010 12:00:00 AM
Status  Finaled
  

Case Number  BLD2010-00379
Description  STORMWATER PERMIT - for Phase I collection system within the Park
Last Name  WASHINGTON STATE PARKS
Received Date  11/4/2010 12:00:00 AM
Status  Finaled
  

Case Number  ZON2010-00051
Description  CONDITIONAL ADMINISTRATIVE USE "C(a)" for a minor utility (sewer lines) in the Parks & Recreation and Rural Village Center zones. This permit will be processed under the Optional Consolidated Permit Processing provisions in JCC 18.40.030(2). See SDP10-00048.
Last Name  WASHINGTON STATE PARKS
Received Date  5/10/2010 12:00:00 AM
Status  CLS
  

Case Number  ZON2010-00052
Description  CONDITIONAL DISCRETIONARY "C(d)" USE for a wastewater treatment facility in a rural residential zone. This permit will be processed under the Optional Consolidated Permit Processing provisions in JCC 18.40.030(2). See SDP10-00048.
Last Name  WASHINGTON STATE PARKS
Received Date  5/10/2010 12:00:00 AM
Status  CLS
  

Case Number  SDP2010-00048
Description  DOSEWALLIPS STATE PARKS WASTE WATER SYSTEM - The Washington State Parks & Recreation Commission plans to replace the existing wastewater treatment system as part of the State of Washington Clean Water Initiative. Waste water at the Dosewallips State Park is currently treated in eleven septic tank/drainfield systems. Much of the Park is within a floodplain and subject to seasonally high groundwater. Subsequently, Hood Canal water quality may be negatively impacted. The initial construction will include an on-site collection system at the Park, conveyance through subsurface pipe and construction of a treatment/disposal system on the 20 acre former Jorgensen property on Church Road. The treatment system will utilize waste water treatment processes capable of producing "Class A" reusable water. The selected system will have little or no odor and noise. The treatment facility will be enclosed within a walled and roofed structure to further reduce any potential for noise and odor impacts. Given the size and current heavily forested condition of the property, it is anticipated that adjacent property owners will not be subjected to any visual, noise or odor impacts. The treatment facility property is currently zoned Rural Residential 1:5 and it is anticipated that the facility will have less impact on noise, odor, existing vegetation and traffic than if it was developed into five acre residential parcels. This project requires a Type III Shoreline Substantial Development Permit for a Conditional Use Permit for a utility in a Conservancy Shoreline Designation, a Type II Conditional Administrative "C(a)" Use Permit for a Minor Utility in the Parks & Recreation and Rural Village Center zones, and a Type II Conditional Discretionary "C(d)" Use Permit for a wastewater treatment facility in a Rural Residential Zone. These permits will be processed under the Optional Consolidated Permit Processing provisions in JCC 18.40.030(2), requiring a Hearing Examiner's Decision. A final SEPA determination issued by State Parks acting as lead agency, a Hydraulic Project Approval issued by Fish & Wildlife, and final shoreline approval by the Department of Ecology are also required. A public hearing will be scheduled and noticed after the end of the 30 day shoreline comment period.
Last Name  WASHINGTON STATE PARKS
Received Date  4/14/2010 12:00:00 AM
Status  E
  

Case Number  PRE2009-00036
Description  PRE APP FOR SUBDIVISION - Create two 5 acre and one 10 acre lots from one 20 acres in a RR 1:5 zone.
Last Name  STATE OF WA-PARKS & RECREATION COMM
Received Date  12/17/2009 12:00:00 AM
Status  M
  

Case Number  FPA2606574
Description  Harvest of 20 acres and 800 ft of road.
Last Name  JORGENSEN
Received Date  3/10/2005 12:00:00 AM
Status  Finaled