Permit Case Summary

Case Number: Search Help

Case Number:PRE2002-00012 Case Status:Finaled Date Received:2/19/2002
Description:The Thorndyke Conveyor Project provides a system to transport aggregate materials from an existing gravel pit located in Jefferson County on land owned by Pope Resources and leased by Fred Hill Materials (FHM) to a marine loadout facility on the northwest shore of Hood Canal, approximately 3 miles south of the Hood Canal Bridge. The conveyor system is approximately 3.9 miles in length, beginning at the existing sand and gravel site, the Shine Pit, and extending to the west shore of Hood Canal at the "Thorndyke" Property located in Section 19, Township 28N, Range 1E, WM. The proposed Project consists of two elements, the North Conveyor and the South Conveyor. Environmental conditions reports have been prepared for the proposed project. These reports include a Marine Resources Report, a Preliminary Geotechnical Report, a Wetlands Report, and a Habitat Management Plan. A Biological Assessment Plan will be prepared in the near future. Date Issued:5/1/2002
Applicant: FRED HILL MATERIALS, INC Expiration Date:
Site Address: .................... Case Finaled:
Parcel No:721062001 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Application Submitted Status F
Date Completed: 3/28/2003
Disposition: DONE
Description: Meeting Held/App Due Date
Date Completed: 3/28/2003
Disposition: DONE
Description: Case Entered
Date Completed: 2/19/2002
Disposition:
Description: PreApp Meeting Scheduled/Held
Date Completed: 2/20/2002
Disposition: