Case Number:FPA2612108 Case Status:Finaled Date Received:11/30/2012
Description:AMENDMENT: Approved 1/30/13 (The purpose of this amendment request is to cross an type Np stream and type Ns stream with a single designated puncheon crossing. The attached map shows the locations. The type of equipment that will be used is a shovel and a feller buncher. Also being requested is to build an additional 5OO' of road not previously on the original FPA). 71-acre even-aged timber harvest and 950 feet road construction. Date Issued:12/29/2012
Applicant: POPE RESOURCES Expiration Date:12/29/2015 12:00:00 AM
Site Address:4938 HWY 20 Case Finaled:12/31/2012
Parcel No:901042001 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: REVIEW COMPLETE: Close Case
Date Completed: 12/31/2012
Disposition: DONE
Description: Case Entered
Date Completed: 11/30/2012
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: C-DNR CONDITIONS
Wording 1. If water is flowing at puncheon crossing locations a culvert, sized appropriately to handle the flow, will be placed in the channel with the puncheon placed on top. Enough puncheon should be placed in the channel to protect the stream banks. 2. Once the activity is complete the puncheon and the culverts (if necessary) shall be removed from the channel. 3. If soil is exposed at the crossing approaches slash, straw or similar material shall be placed on the exposed areas to reduce the risk of sedimentation from erosion.