|
Case Number | | BLD2022-00559
|
|
Description | | WIRELESS COMMUNICATIONS - GENERATOR
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 9/28/2022 7:30:04 AM
|
|
Status | | Approved
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | BLD2022-00514
|
|
Description | | CELL TOWER MODIFICATION. SCOPE OF WORK TO INCLUDE - TOWER: REMOVE (3) ANTENNAS, INSTALL (3) ANTENNAS, lNSTALL (1) HCS 2.0J-BOX W/ BREAKOUT PENDANT, INSTALL (I) 1-1/2" HYBRID CABLE; GROUND: REMOVE (I) EXISTlNG CABINET - SSC CABINET, REMOVE (1) AMOB RACK, REMOVE (1) PPC/TF LCO CABINET, INSTALL (1) PURCELL HPL3 CABINET W/ CSR IXRE V2 ROUTER, INSTALL (1) PURCELL LB3 BATfERY CABINET W (4) BATTERY STRINGS, INSTALL (1) HCS 2.0 J-BOX, INSTALL 200A PPC CABINET W/ CAMLOK CONNECTlON, INSTALL VERTIV CUBE, INSTALL (I) H-FRAME, INSTALL (1) 14'-0"x24" ICE BRIDGE w/ 12" DIVING BOARD, INSTALL (1) 8'ยท0"x24" ICE BRIDGE, INSTALL (1) TECH LIGHT
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 9/2/2022 11:36:24 AM
|
|
Status | | Approved
|
|
| | |
|
|
Case Number | | BLD2019-00398
|
|
Description | | CELL TOWER - REMOVE AND REPLACE 3 PANEL ANTENNAS, 6 TMAS, ADD 3 PANAELS, & 3 RRU'S 1 JUNCTION BOX, 1 HCS, REMOVE 2 CABINETS AND INSTALL 1 EQUIPMENT ON EXISTING CONCRETE SLAB
|
|
Last Name | | CROWN CASTLE
|
|
Received Date | | 9/6/2019 4:13:11 PM
|
|
Status | | Finaled
|
|
LaserFiche Links | | View LaserFiche Documents |
|
|
Case Number | | CAM2019-00481
|
|
Description | | QUESTIONS REGARDING CELL TOWER UPGRADE.
|
|
Last Name | | CROWN CASTLE
|
|
Received Date | | 8/14/2019 10:29:38 AM
|
|
Status | | M
|
|
| | |
|
|
Case Number | | FPA2614205
|
|
Description | | 91 ac Harvest / 900ft Road Const.
Amendment 6/8/2016 - Requesting a puncheon crossing across a type NS stream.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 4/21/2016 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2612108
|
|
Description | | AMENDMENT: Approved 1/30/13 (The purpose of this amendment request is to cross an type Np stream and type Ns stream with a single designated puncheon crossing. The attached map shows the locations. The type of equipment that will be used is a shovel and a feller buncher. Also being requested is to build an additional 5OO' of road not previously on the original FPA).
71-acre even-aged timber harvest and 950 feet road construction.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 11/30/2012 3:41:37 PM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | FPA2609086
|
|
Description | | 411 acres of chemical spray
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 2/8/2008 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2005-00726
|
|
Description | | REMOVE AND REPLACE 6 EXISTING ANTENNAS WITH 6 NEW ANTENNAS AND ADD 2 CABINETS WITHIN AN EXISTING LEASED AREA - PERMIT CANCELLED DUE TO NON-PYMNT UNDER AMNESTY PROG
8/5/2013- notes in file indicate applicant was to send letter to cancel on 2/8/08. Letter never received. Cancel permit. -meb
|
|
Last Name | | CINGULAR WIRELESS
|
|
Received Date | | 11/17/2005 12:00:00 AM
|
|
Status | | Canceled
|
|
| | |
|
|
Case Number | | FPA2606592
|
|
Description | | Harvest of 34 acres.
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 3/18/2005 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | SUB2004-00031
|
|
Description | | BOUNDARY LINE ADJUSTMENT
|
|
Last Name | | MCLUEN
|
|
Received Date | | 7/30/2004 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2002-00219
|
|
Description | | CO LOCATION ANTENNAS on Existing Tower Including Associated Equipment Cabinets
|
|
Last Name | | CINGULAR WIRELESS
|
|
Received Date | | 4/17/2002 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | BLD2000-00358
|
|
Description | | ANDERSON LAKE TOWER
|
|
Last Name | | POPE RESOURCES
|
|
Received Date | | 6/2/2000 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | ZON1999-00055
|
|
Description | | Construct new 150-foot lattice tower to support a 3 sector panel antenna array. Equipment cabinet to be placed near tower base within a 30' x 60' lease area. In addition, Voice Stream may elect to mount three (3) mircrowave antenna dish antennas onto the tower in the future.
|
|
Last Name | | VOICE STREAM WIRELESS
|
|
Received Date | | 12/10/1999 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|
|
Case Number | | PRE1999-00049
|
|
Description | | Voice Stream Wireless proposes to construct a 195' lattice tower to support a three-sector antenna array with (3) antennas per sector (9 antennas total). Voice Stream may elect to mount tow microwave dishe antennas (1 @ 4' diameter & 1 @ 8' diameter) onto the tower in the future.
|
|
Last Name | | VOICE STREAM WIRELESS
|
|
Received Date | | 9/9/1999 12:00:00 AM
|
|
Status | | Finaled
|
|
| | |
|