Case Number:BLD2022-00429 |
Case Status:Approved |
Date Received:7/19/2022 |
|
Description:CELL TOWER MODIFICATION SCOPE TO INCLUDE: TOWER - REMOVE (3) ANTENNAS, INSTALL (3) ANTENNAS, INSTALL (1) HCS 2.0 J-BOX W / BREAKOUT PENDANTS, INSTALL (1) 1-1/2" HYBRID CABLES; GROUND - REMOVE (2) EXISTING CABINETS: (1) PURCELL EXP. CABINET & (1) SSC, INSTALL (1) PURCELL HPL3 CABINET W/: (1) VOLTAGE BOOSTER W / (3) AMPLIFIERS & (1) CSR IXRE V2 ROUTER, INSTALL (1) PURCELL HPL3 LB3 BATTERY CABINET W / (4) BATTERY STRINGS, INSTALL (1) HCS 2.0 )-BOX, INSTALL (N) STEP UP GRlP STRUT COVER OVER (N) CONDUITS BEHIND (N) HPL3 CABINET, ADD (2) (N) 2" CONDUIT BETWEEN (N) HCS )-BOXES AND (N) HPL3 WITH (6) #2AWG WIRE IN EACH, INSTALL (1) 200 A PPC CABINET, INSTALL (1) VERTIV CUBE , INSTALL (1) UTILITY FRAME, INSTALL (1) TECH LIGHT W / TIMER |
Date Issued:10/18/2022 |
|
Applicant: MANKE TIMBER COMPANY INC |
Expiration Date:10/18/2023 12:00:00 AM |
|
Site Address:313 ELKHOUND PASS RD |
Case Finaled: |
|
Parcel No:702132002
|
Other Cases |
Parcel Data |
Map It |
More Details |
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
10/18/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Override - Parcel Holds
|
|
Date Completed:
|
| | |
10/18/2022
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
9/19/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Address Review Complete
|
|
Date Completed:
|
| | |
8/16/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
9/19/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
9/19/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
7/21/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
9/19/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
8/24/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
7/21/2022
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
9/19/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
APPROVAL
|
|
Wording
|
| | |
THIS APPROVAL IS FOR THE FOLLOWING MODIFICATIONS TO AN EXISTING CELL TOWER ONLY: REMOVE (3) ANTENNAS, INSTALL (3) ANTENNAS, INSTALL (1) HCS 2.0 J-BOX W / BREAKOUT PENDANTS, INSTALL (1) 1-1/2" HYBRID CABLES; GROUND - REMOVE (2) EXISTING CABINETS: (1) PURCELL EXP. CABINET & (1) SSC, INSTALL (1) PURCELL HPL3 CABINET W/: (1) VOLTAGE BOOSTER W / (3) AMPLIFIERS & (1) CSR IXRE V2 ROUTER, INSTALL (1) PURCELL HPL3 LB3 BATTERY CABINET W / (4) BATTERY STRINGS, INSTALL (1) HCS 2.0 )-BOX, INSTALL (N) STEP UP GRlP STRUT COVER OVER (N) CONDUITS BEHIND (N) HPL3 CABINET, ADD (2) (N) 2" CONDUIT BETWEEN (N) HCS )-BOXES AND (N) HPL3 WITH (6) #2AWG WIRE IN EACH, INSTALL (1) 200 A PPC CABINET, INSTALL (1) VERTIV CUBE , INSTALL (1) UTILITY FRAME, INSTALL (1) TECH LIGHT W / TIMER. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
SITE PLAN CHANGES
|
|
Wording
|
| | |
The site plan as submitted with the modification to existing cell tower application on jULY 19, 2022 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the revised stamped, approved site plan dated SEPTEMBER 19, 2022 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
BMPS
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
EXEMPT
|
|
Wording
|
| | |
The proposal meets JCC18.42.020 (2) (d) which exempts the following from the provisions of the Chapter 18.42 JCC. Emergency or routine repairs, reconstruction, or routine maintenance of previously approved facilities, or replacement of transmitters, antennas, or other components of previously approved facilities which do not create a change in visual impact.
|
|
|
Title:
|
| | |
COLOCATION
|
|
Wording
|
| | |
JCC 18.42.080 identifies the following as a permitted outright use: Attached or collocated wireless communications facilities on existing structures in designated forest lands and all commercial and industrial districts.
|
|
|
Title:
|
| | |
NOISE
|
|
Wording
|
| | |
The installed permitted equipment will be compliant with Jefferson County Code 18.42.090 (g). T-MOBILE will be responsible for not exceeding the maximum environmental noise levels set forth in WAC Chapter 173-60.
|
|
|
Title:
|
| | |
SEPA EXEMPT
|
|
Wording
|
| | |
This proposal is SEPA exempt under WAC197-11-800(25)(a)(i).
|
|