Case Number:
|
|
BLD2022-00429
|
Received Date:
|
|
7/19/2022
|
|
Description:
|
|
CELL TOWER MODIFICATION SCOPE TO INCLUDE: TOWER - REMOVE (3) ANTENNAS, INSTALL (3) ANTENNAS, INSTALL (1) HCS 2.0 J-BOX W / BREAKOUT PENDANTS, INSTALL (1) 1-1/2" HYBRID CABLES; GROUND - REMOVE (2) EXISTING CABINETS: (1) PURCELL EXP. CABINET & (1) SSC, INSTALL (1) PURCELL HPL3 CABINET W/: (1) VOLTAGE BOOSTER W / (3) AMPLIFIERS & (1) CSR IXRE V2 ROUTER, INSTALL (1) PURCELL HPL3 LB3 BATTERY CABINET W / (4) BATTERY STRINGS, INSTALL (1) HCS 2.0 )-BOX, INSTALL (N) STEP UP GRlP STRUT COVER OVER (N) CONDUITS BEHIND (N) HPL3 CABINET, ADD (2) (N) 2" CONDUIT BETWEEN (N) HCS )-BOXES AND (N) HPL3 WITH (6) #2AWG WIRE IN EACH, INSTALL (1) 200 A PPC CABINET, INSTALL (1) VERTIV CUBE , INSTALL (1) UTILITY FRAME, INSTALL (1) TECH LIGHT W / TIMER
|
Issued Date:
|
|
10/18/2022
|
|
Case Status:
|
|
A
|
Expiration Date:
|
|
10/18/2023
|
| | |
Final Date:
|
|
|
|
Permit Applicant:
|
|
 
 
MANKE TIMBER COMPANY INC
|
|
Parcel No:
|
|
702132002
|
|
Case Notes:
|
|
|
|
Building Type:
|
|
COM
|
Water Supply:
|
|
|
Existing:
|
|
|
Main Fl:
|
|
|
|
Type of Improvement:
|
|
ALT
|
Sewage Disposal:
|
|
|
Proposed:
|
|
|
Add Fl:
|
|
|
|
Type of Construction:
|
|
|
|
|
|
Total:
|
|
|
Heated Basement:
|
|
|
|
Units:
|
|
|
|
|
|
|
|
|
Unheated Basement:
|
|
|
|
Height:
|
|
|
|
|
|
|
|
|
Other:
|
|
|
|
Stories:
|
|
|
|
|
|
|
|
|
Garage/Carport:
|
|
|
|
Heat Type:
|
|
|
|
|
|
|
|
|
Decks:
|
|
|
|
Estimated Cost:
|
|
|
|
Existing:
|
|
|
|
ShBnkHt:
|
|
|
|
LndBnkHt:
|
|
|
|
Make:
|
|
|
|
Proposed:
|
|
|
|
ShSetBk:
|
|
|
|
LndSetBk:
|
|
|
|
Yr:
|
|
|
|
Total:
|
|
|
|
|
|
|
|
|
|
|
|
Size:
|
|
|
|