Description:
|
| | |
Change Status to RENEWED
|
|
Date Completed:
|
| | |
7/27/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Inspection Reminder Sent (1st)
|
|
Date Completed:
|
| | |
6/27/2022
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Miscellaneous action
|
|
Date Completed:
|
| | |
3/28/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
8/5/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
7/29/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-EH
|
|
Date Completed:
|
| | |
7/29/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
7/29/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
8/3/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
6/7/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
8/2/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
8/2/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Address Review Complete
|
|
Date Completed:
|
| | |
6/7/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
7/28/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
6/28/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
6/28/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
6/7/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
7/13/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
6/7/2021
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
6/28/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
HOLD-CROSS CONNECTION CONTROL
|
|
Wording
|
| | |
PRIOR to final approval for use of the new docks the installation of a DOH approved backflow prevention assembly device is required. The device will be inspected by the PUD and it will need to be tested by the dock owners annually with the report submitted to the PUD. JCEPH will need written verification from the water system operator that the device is adequate for final approval. Contact Jefferson County PUD#1 for any questions 360-385-5800.
|
|
|
Title:
|
| | |
HOLD-SEPTIC CONNECTION
|
|
Wording
|
| | |
It was determined during evaluation of the sewer pump out facility which was permitted to pump to holding tanks approved under SEP1996-354 has been reconfigured; the holding tanks have been abandoned and the marina pump out is now pumping to the WSDOH approved JEF017 Large On Site Septic system. It was also determined that this reconfiguration was not approved by DOH.
PRIOR to final approval for use of the dock the current arrangement for the sewer discharge must either be approved by WSDOH and the holding tanks decommissioned in accordance with requirements OR the pump out facility must be reconnected to the holding tanks (SEP1996-354). Site inspection and verification that the alarm system and tanks are adeuate will be required by a licensed septic designer and our office. A fee will be required for that inspection.
|
|
|
Title:
|
| | |
HOLD-HOSE BIB VACUUM BREAKERS
|
|
Wording
|
| | |
All hose bibs on the docks must have vacuum breakers for extra protection for cross connection control.
|
|
|
Title:
|
| | |
PLANNER
|
|
Wording
|
| | |
DWJ
|
|
|
Title:
|
| | |
Comply with HPA
|
|
Wording
|
| | |
In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.
|
|
|
Title:
|
| | |
Shoreline Exemption-Repair
|
|
Wording
|
| | |
This project was reviewed and approved as a Shoreline Exemption under JCC 18.25.560(2) and MLA18-00066/SDP2018-00013 which expires September 19, 2023.
|
|
|
Title:
|
| | |
F-HPA Issued
|
|
Wording
|
| | |
The Washington Department of Fish and Wildlife issued Hydraulic Project Approval (HPA) for this activity on December 11, 2018 under Log Number 2018-6-502+01. The HPA expires on December 10, 2023.
|
|
|
Title:
|
| | |
F-SEPA Exempt
|
|
Wording
|
| | |
Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(3).
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the Building Permit application on June 7, 2021 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated June 28, 2021 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for a Dock Maintenance and Float Replacement only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|