Case Number:BLD2021-00337 Case Status: Date Received:6/7/2021
Description:MARINA RENOVATION-replacement of only docks c and d with water and sewer connection. SEP1996-00354/LOSS JEF017 Date Issued:8/5/2021
Applicant: MARSH ANDERSEN LLC Expiration Date:8/5/2023 12:00:00 AM
Site Address:173 HADLOCK BAY RD Case Finaled:
Parcel No:901014003 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Change Status to RENEWED
Date Completed: 7/27/2022
Disposition: DONE
Description: Inspection Reminder Sent (1st)
Date Completed: 6/27/2022
Disposition:
Description: Insp - Miscellaneous
Date Completed:
Disposition:
Description: Miscellaneous action
Date Completed: 3/28/2022
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 8/5/2021
Disposition: DONE
Description: Insp - Final Building
Date Completed:
Disposition:
Description: Insp - Miscellaneous
Date Completed:
Disposition:
Description: Insp - Miscellaneous
Date Completed:
Disposition:
Description: Insp - Miscellaneous
Date Completed:
Disposition:
Description: A Clock Interrupt
Date Completed: 7/29/2021
Disposition: DONE
Description: Additional Info Request-EH
Date Completed: 7/29/2021
Disposition: DONE
Description: Potable Water Approval
Date Completed: 7/29/2021
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 8/3/2021
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 6/7/2021
Disposition: DONE
Description: DRD Approval (Zoning)
Date Completed: 8/2/2021
Disposition: DONE
Description: Final Planning Approval
Date Completed: 8/2/2021
Disposition: DONE
Description: Address Review Complete
Date Completed: 6/7/2021
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 7/28/2021
Disposition: DONE
Description: Consistency Review-U
Date Completed: 6/28/2021
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 6/28/2021
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 6/7/2021
Disposition: DONE
Description: Plan Check
Date Completed: 7/13/2021
Disposition: DONE
Description: Case Entered
Date Completed: 6/7/2021
Disposition:
Description: App Substantially Complete-U
Date Completed: 6/28/2021
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: HOLD-CROSS CONNECTION CONTROL
Wording PRIOR to final approval for use of the new docks the installation of a DOH approved backflow prevention assembly device is required. The device will be inspected by the PUD and it will need to be tested by the dock owners annually with the report submitted to the PUD. JCEPH will need written verification from the water system operator that the device is adequate for final approval. Contact Jefferson County PUD#1 for any questions 360-385-5800.

Title: HOLD-SEPTIC CONNECTION
Wording It was determined during evaluation of the sewer pump out facility which was permitted to pump to holding tanks approved under SEP1996-354 has been reconfigured; the holding tanks have been abandoned and the marina pump out is now pumping to the WSDOH approved JEF017 Large On Site Septic system. It was also determined that this reconfiguration was not approved by DOH. PRIOR to final approval for use of the dock the current arrangement for the sewer discharge must either be approved by WSDOH and the holding tanks decommissioned in accordance with requirements OR the pump out facility must be reconnected to the holding tanks (SEP1996-354). Site inspection and verification that the alarm system and tanks are adeuate will be required by a licensed septic designer and our office. A fee will be required for that inspection.

Title: HOLD-HOSE BIB VACUUM BREAKERS
Wording All hose bibs on the docks must have vacuum breakers for extra protection for cross connection control.

Title: PLANNER
Wording DWJ

Title: Comply with HPA
Wording In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.

Title: Shoreline Exemption-Repair
Wording This project was reviewed and approved as a Shoreline Exemption under JCC 18.25.560(2) and MLA18-00066/SDP2018-00013 which expires September 19, 2023.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-HPA Issued
Wording The Washington Department of Fish and Wildlife issued Hydraulic Project Approval (HPA) for this activity on December 11, 2018 under Log Number 2018-6-502+01. The HPA expires on December 10, 2023.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(3).

Title: F-Site Plan Changes
Wording The site plan as submitted with the Building Permit application on June 7, 2021 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated June 28, 2021 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only