Description:
|
| | |
Inspection Reminder Sent (2nd)
|
|
Date Completed:
|
| | |
8/31/2020
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Inspection Reminder Sent (1st)
|
|
Date Completed:
|
| | |
2/28/2020
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
3/22/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Framing
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Foundation Footing
|
|
Date Completed:
|
| | |
8/6/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Setbacks
|
|
Date Completed:
|
| | |
8/6/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
1/29/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
3/20/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
2/15/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
3/20/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
2/15/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
2/15/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
2/15/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
1/29/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
2/8/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
1/29/2019
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
1/29/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
APPROVAL FOR SIGN ONLY
|
|
Wording
|
| | |
This approval is for an interpretive sign only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
SITE PLAN CHANGES
|
|
Wording
|
| | |
The site plan as submitted with the interpretive sign application on 01/29/2019 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 02/15/2019 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
CONFIRMED ESA'S
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on 02/15/2019 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review, the following ESAs were confirmed to be present on the subject property: Geologically Hazardous Areas, Shoreline Conservancy Designation, Wetlands, Flood Zone, Coastal SIPZ, Potential Archaeology Site
|
|
|
Title:
|
| | |
REPAIR/REPLACEMENT ONLY
|
|
Wording
|
| | |
This interpretive sign shall be essentially the same as the original in location, size, configuration, and external appearance.
|
|
|
Title:
|
| | |
SDP
|
|
Wording
|
| | |
This replacement shall comply with all permit conditions and findings of the Shoreline Substantial Development permit, SDP18-00020.
|
|
|
Title:
|
| | |
GEOHAZARD AREA
|
|
Wording
|
| | |
Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.
|
|
|
Title:
|
| | |
SUSC
|
|
Wording
|
| | |
Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.
|
|
|
Title:
|
| | |
COASTAL SIPZ
|
|
Wording
|
| | |
The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 61-02, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record.
|
|
|
Title:
|
| | |
INADVERTENT DISCOVERY PLAN
|
|
Wording
|
| | |
All contractors and personnel shall be familiar with the inadvertent discovery plan as attached to this permit. If any possible historic, archaeological and/or cultural artifacts are inadvertently discovered, the applicant shall immediately stop all work on the project and shall notify the Washington Department of Archaeology and Historic Preservation, Jefferson County Department of Community Development, and affected tribes.
|
|
|
Title:
|
| | |
IMPACT
|
|
Wording
|
| | |
This project shall minimize impacts to all critical areas on site by using BMP's, not disturbing wetlands, shoreland functions, and hazardous slopes.
|
|
|
Title:
|
| | |
PLANNER
|
|
Wording
|
| | |
scc
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|