Permit Case Summary

Case Number: Search Help

Case Number:BLD2014-00069 Case Status:Finaled Date Received:2/27/2014
Description:Pump house enclosure, operations room for new sewage treatment plant, and equipment pads Date Issued:4/10/2014
Applicant: STATE OF WASHINGTON PARKS Expiration Date:4/10/2016 12:00:00 AM
Site Address:152 CHURCH RD Case Finaled:12/16/2015
Parcel No:602353005 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Insp - FINAL FINAL Building
Date Completed: 12/16/2015
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 3/26/2015
Disposition: DONE
Description: Inspection Reminder Sent
Date Completed: 3/9/2015
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed: 2/18/2015
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 9/30/2014
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 4/10/2014
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 4/9/2014
Disposition: DONE
Description: Insp - Final Building
Date Completed: 12/16/2015
Disposition: DONE
Description: A Clock Interrupt
Date Completed: 4/8/2015
Disposition: DONE
Description: Additional Info Request-EH
Date Completed: 4/8/2014
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 6/19/2015
Disposition: DONE
Description: Septic System Finaled
Date Completed: 6/30/2015
Disposition: DONE
Description: Insp - SEPA Mitigation
Date Completed:
Disposition:
Description: Insp - Address Posted
Date Completed:
Disposition:
Description: Insp - Exterior Lighting
Date Completed:
Disposition:
Description: Insp - Sign
Date Completed:
Disposition:
Description: Insp - Parking
Date Completed:
Disposition:
Description: Insp - Landscaping
Date Completed:
Disposition:
Description: Insp - Fire Protection
Date Completed:
Disposition:
Description: Insp - Mechanical Systems
Date Completed:
Disposition:
Description: Insp - Insulation: Ceiling
Date Completed: 2/4/2015
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed:
Disposition:
Description: Insp - Insulation: Walls
Date Completed: 10/17/2014
Disposition: DONE
Description: Insp - Framing
Date Completed: 11/24/2014
Disposition: DONE
Description: Insp - Airseal
Date Completed:
Disposition:
Description: Insp - Propane Tank
Date Completed:
Disposition:
Description: Insp - Gas Line: Exterior
Date Completed:
Disposition:
Description: Insp - Gas Line: Interior
Date Completed:
Disposition:
Description: Insp - Rough-in Plumbing
Date Completed: 12/10/2014
Disposition: DONE
Description: Insp - Ext. Shear Wall Nailing
Date Completed: 10/17/2014
Disposition: DONE
Description: Insp - Straps (hold downs)
Date Completed:
Disposition:
Description: Insp - Underground Plumbing
Date Completed: 9/9/2014
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed: 9/16/2014
Disposition: DONE
Description: Insp - Footing Drains
Date Completed:
Disposition:
Description: Insp - Foundation Footing
Date Completed: 9/9/2014
Disposition: DONE
Description: Insp - Setbacks
Date Completed: 9/9/2014
Disposition: DONE
Description: Insp - Erosion Control
Date Completed: 9/9/2014
Disposition: DONE
Description: DCD Review Time
Date Completed: 3/11/2014
Disposition:
Description: Building Permit Application(F)
Date Completed: 2/27/2014
Disposition: DONE
Description: DRD Approval (Zoning)
Date Completed: 4/9/2014
Disposition: DONE
Description: Final Planning Approval
Date Completed: 12/11/2015
Disposition: DONE
Description: Address Review Complete
Date Completed: 2/28/2014
Disposition: DONE
Description: Consistency Review-U
Date Completed: 4/9/2014
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 3/13/2014
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 3/13/2014
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 4/9/2014
Disposition: DONE
Description: Plan Check
Date Completed: 3/12/2014
Disposition: DONE
Description: Potable Water Approval
Date Completed: 4/8/2014
Disposition: DONE
Description: Case Entered
Date Completed: 2/27/2014
Disposition:
Description: Septic Review Complete-U
Date Completed: 3/4/2014
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 2/27/2014
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Storage of inflammable liquid
Wording The storage and handling of inflammable liquids, liquified petroleum, gases and explosives shall comply with rules and regulations falling under the jurisdiction of the fire marshal, the laws of the state and other local ordinances. Bulk storage of inflammable liquids below ground shall be located no closer to the property line than the greatest dimension (diameter, length, or height) of the tank.

Title: Bld Shielding of electrical equip
Wording Provisions shall be made for necessary shielding or other preventive measures against interferences occasioned by mechanical, electrical and nuclear equipment, uses or processes with electrical apparatus in nearby buildings or land uses.

Title: Bld Noise
Wording The intensity of sound emitted by any commercial or industrial activity shall not exceed levels estabished by the Washington State Department of Ecology under WAC 173-60, and by Jefferson County under Resolution No. 67-85, "Establishment of Environmental Designations for Noise Abatement Areas for Jefferson County."

Title: Bld Noise Abatement
Wording All noise emitting machinery that cannot in any other way operate below the maximum permitted noise level shall be housed in a sound-attenuating structure.

Title: Bld Security/hooded lights
Wording Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way.

Title: Bld Exterior height lights
Wording Exterior lighting for commercial and industrial uses shall not exceed thirty feet (30') in height from the finished grade. Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: HOLD-WASTEWATER FACILITY
Wording HOLD - Final construction approval of the sewage treatment facility to be completed prior to final sign off for this building.

Title: Stormwater Plan
Wording An Engineered Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.

Title: C-SWT CERTIFICATION
Wording PRIOR TO FINAL BUILDING OCCUPANCY, PROPONENT SHALL SUBMIT A WRITTEN LETTER FROM JENIFER RAMSEY WITH PARAMETRIX STATING THAT THE STORMWATER FACILITY HAS BEEN CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE "STORMWATER SITE PLAN FOR DOSEWALLIPS STATE PARK SEWAGE TREATMENT FACILITY" DATED FEBRUARY 24, 2014 AS STAMPED BY SAME.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-ZONING APPROVAL
Wording See ZON10-00052 for zoning approval.

Title: F-COHP
Wording A Conversion Option Harvest Plan was issued for timber harvesting of the site prior to clearing for the treatment facility on January 14, 2011 under FPA10-00001..

Title: F-BLD
Wording See BLD10-00387 for findings and conditions related to prior stormwater management approval.

Title: F-Site Plan Changes
Wording The site plan as submitted with the Building Permit application on February 24, 2014 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated April 9, 2014 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a Pump House Enclosure, Equipment Pads & Operations Room for New Wastewater Treatment Facility only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-General PMT Notice
Wording NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development, but consistent with RCW 90.58. Development pursuant to this permit shall be undertaken subject to the applicable policies and performance standards of the Jefferson County Shoreline Management Master Program and the Jefferson County Unified Development Code. If during excavation or development of the site an area of potential archaeological significance is uncovered, all activity in the immediate area shall be halted, and the Administrator shall be notified at once. The Federal Endangered Species Act rules to protect threatened Chinook and Summer-run Chum salmon became effective on January 8, 2001. Bull trout have been listed as threatened since early 2000. Under the ESA, any person may bring lawsuit against any individual or agency that "takes" listed species (defined as causing harm, harassing, or damaging habitat for the listed species). In addition, the National Marine Fisheries Service can levy penalties. All areas in Jefferson County are included as "critical habitat" for a listed species. Development of property along any marine shoreline, freshwater shoreline, or floodplains could harm habitat if protective measures are not taken. To minimize the potential to damage habitat, all property owners developing adjacent to marine shoreline, freshwater shoreline, or floodplains are advised to do the following: - All development activities should avoid unstable slopes, wetlands, and forested areas near surface waters - Remove minimal vegetation for site development, especially large trees - Allow trees that have fallen into surface waters to remain there - Infiltrate stormwater from buildings and driveways onsite through drywells rather than discharging directly into surface waters or roadside ditches The Federal Bald and Golden Eagle Protection Act requires landowners within 660 feet (1/8th of a mile) of an eagle nest to consult with the US Fish and Wildlife Service. This Eagle Act prohibits anyone from "taking" bald eagles. This federal law defines the term "take" and describes the possible legal consequences when a "take" occurs. Among other actions, "take" includes a disturbance of bald eagles or their habitat. Under federal law a permit may still be required for activities that impact bald eagles or their habitat. Contact the US Fish and Wildlife Service (http://www.fws.gov/pacific/eagle/) to learn more about how this law affects your project. Any individual, group, or agency can bring suit for a listed species "taking", even if you are in compliance with Jefferson County development codes. The risk of a lawsuit against you can be reduced by consulting with a professional fisheries habitat biologist, and following the recommendations for site development provided by the biologist. For more information, contact the National Marine Fisheries Service in Seattle, or the U.S. Fish and Wildlife Service.