Case Number:BLD2008-00244 Case Status:Finaled Date Received:6/5/2008
Description:NEW OPERATIONS BLDG FOR MEMBRANE BIOREACTOR WASTEWATER TREATMENT FACILITY, INCL AN U/G CONCRETE TANK Date Issued:9/24/2008
Applicant: STATE OF WASHINGTON-NAT RESOUR Expiration Date:9/24/2009 12:00:00 AM
Site Address:10541 FLAGLER RD Case Finaled:7/16/2009
Parcel No:021174000 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 2/16/2011
Disposition: DONE
Description: Certificate of Occupancy-F
Date Completed: 7/16/2009
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 7/16/2009
Disposition: DONE
Description: Insp - Final Building
Date Completed: 7/16/2009
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed: 3/17/2009
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed: 2/11/2009
Disposition:
Description: Insp - Miscellaneous
Date Completed: 2/10/2009
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 9/24/2008
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 9/24/2008
Disposition: DONE
Description: Review Complete-U
Date Completed: 9/24/2008
Disposition: DONE
Description: Insp - Setbacks
Date Completed: 12/2/2008
Disposition: DONE
Description: Insp - Foundation Footing
Date Completed: 12/2/2008
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed: 12/17/2008
Disposition: DONE
Description: Insp - Ext. Shear Wall Nailing
Date Completed: 1/28/2009
Disposition: DONE
Description: Insp - Framing
Date Completed: 3/5/2009
Disposition: DONE
Description: Septic System Finaled
Date Completed: 5/20/2009
Disposition: DONE
Description: PLAN CHK - Addt'l Info Request
Date Completed: 8/22/2008
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 6/5/2008
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 8/20/2008
Disposition: DONE
Description: Case Entered
Date Completed: 6/5/2008
Disposition:
Description: Plan Check
Date Completed: 8/26/2008
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 7/10/2008
Disposition: DONE
Description: Potable Water Approval
Date Completed: 6/10/2008
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 6/5/2008
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 9/24/2008
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 9/23/2008
Disposition: DONE
Description: Consistency Review-U
Date Completed: 9/24/2008
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 6/5/2008
Disposition: DONE
Description: Final Planning Approval
Date Completed: 9/23/2008
Disposition: DONE
Description: DRD Approval (Zoning)
Date Completed: 8/20/2008
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: STORMWATER
Wording The applicant shall implement the Construction Stormwater Pollution Prevention Plan (CSWPPP) as prepared by Parametrix and dated May 2008.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Stormwater Plan
Wording An Engineered Stormwater Plan has been prepared, submitted, reviewed by the Public Works Department and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-FINDINGS
Wording See Staff Report for MLA08-00108 dated June 3, 2008 & Hearing Examiner Decision dated June 27, 2008 for findings

Title: F-ZON08-00035
Wording The proposal is an element of the sewer system upgrade approved under ZON08-00035 and satisfies condition #1 of the Hearing Examiner Decision dated June 27, 2008 for MLA08-00108

Title: F-Large Stormwater
Wording The applicant is proposing to create or add 6,600 square feet of impervious surface and 9,650 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require the project applicant submit a stormwater plan meeting Minimum Requirements #1 through #10 of the Department of Ecology Stormwater Management Manual for Western Washington. The stormwater plan shall address measures to control stormwater, erosion and sediment during construction and shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: F-DNS Issued
Wording Reviewed under the State Environmental Policy Act (SEPA) by Washington State Parks and Recreation acting as lead agency. Determination of Non-Significance (DNS) issued on March 5, 2008.

Title: F-Site Plan Changes
Wording The site plan as submitted with the Building Permit application on June 5, 2008 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated September 23, 2008 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a New Operations Building for Bioreactor wastewater treatment facility with concrete tank only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.