Case Number:BLD2005-00607 Case Status:Finaled Date Received:9/20/2005
Description:NEW STEEL RE-INFORCED CONCRETE WATER STORAGE TANK (ABOVE GROUND), which is approximately 15 feet tall by 30 feet diameter. The purpose of the tank is to meet water and fire flow requirements for existing lots within Cape George Colony. There are currently a well field comprised of three wells, three storage tanks, and a filtration building on this parcel. Date Issued:10/17/2005
Applicant: CAPE GEORGE COLONY CLUB Expiration Date:10/17/2008 12:00:00 AM
Site Address:11 JOHNSON AVE Case Finaled:10/8/2008
Parcel No:941500007 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 10/28/2008
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 10/8/2008
Disposition: DONE
Description: PLAN CHK - Addt'l Info Request
Date Completed: 10/8/2008
Disposition: DONE
Description: Inspection Reminder Sent
Date Completed: 9/4/2008
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 2/28/2006
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 2/28/2006
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 2/28/2006
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed:
Disposition:
Description: Insp - Foundation Stem Wall
Date Completed: 2/21/2006
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed:
Disposition:
Description: Issue Building Permit (F)
Date Completed: 10/17/2005
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 10/14/2005
Disposition: DONE
Description: Review Complete-U
Date Completed: 10/14/2005
Disposition: DONE
Description: Insp - Setbacks
Date Completed:
Disposition:
Description: Insp - Foundation Footing
Date Completed: 2/16/2006
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed: 2/17/2006
Disposition: DONE
Description: Insp - Underground Plumbing
Date Completed:
Disposition:
Description: Insp - Final Building
Date Completed: 10/7/2008
Disposition: DONE
Description: Septic System Finaled
Date Completed:
Disposition:
Description: Building Permit Application(F)
Date Completed: 9/21/2005
Disposition: DONE
Description: App Substantially Complete-U
Date Completed:
Disposition:
Description: Case Entered
Date Completed: 9/21/2005
Disposition:
Description: Plan Check
Date Completed: 9/29/2005
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 10/11/2005
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 10/11/2005
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 10/14/2005
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 10/14/2005
Disposition: DONE
Description: Consistency Review-U
Date Completed: 10/14/2005
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 10/11/2005
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Shielding of electrical equip
Wording Provisions shall be made for necessary shielding or other preventive measures against interferences occasioned by mechanical, electrical and nuclear equipment, uses or processes with electrical apparatus in nearby buildings or land uses.

Title: Bld Outside Storage
Wording Commercial and industrial developments located in all zoning districts hall screen from areas frequented by the general public, all materials stored outside buildings or structures which are not for display or immediate sale. Areas frequented by the general public shall be defined as public streets and rights-of-way, and other areas normally used by the general public located adjacent to the subject property.

Title: Bld Security/hooded lights
Wording Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way.

Title: Bld Exterior height lights
Wording Exterior lighting for commercial and industrial uses shall not exceed thirty feet (30') in height from the finished grade. Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged.

Title: Bld Setbacks
Wording There are 20 foot setbacks from the edge of the right-of-way for Johnson Ave and Saddle Drives. There are 5 foot side & rear setbaks.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc.

Title: Custom Case Specific Condition
Wording NOTE: SPECIAL INSPECTIONS PER IBC CHAPTER 17 REQUIRED. 1.SPECIAL INSPECTION OF SIZE AND PLACEMENT OF THE REINFORCING STEEL. 2.SPECIAL INSPECTION FOR PLACEMENT AND TESTING OF CONCRETE.

Title: Outdoor Residential Storage
Wording Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Stormwater Plan
Wording A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-No ESAs Found
Wording The application was reviewed by the Jefferson County Department of Community Development for the presence of Environmentally Sensitive Areas (ESAs). The Department conducted a review and has concluded that the property DOES NOT contain Environmentally Sensitive Areas. However, future proposals will be subject to a new ESA review and conditions may be added if new ESAs are found on the property.

Title: F-Stormwater
Wording The applicant is proposing to create or add 908 square feet of impervious surface and 1,134 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a Stormwater Plan for a Small Project, which are construction Best Management Practices (attached).

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(23)(e) Utilities- within an existing reservoir, pump station or well site.

Title: F-Site Plan Changes
Wording The site plan as submitted with the Building Permit Application (BLD 05-607) on September 20, 2005 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated October 17, 2005 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a new concrete water storage tank only within an existing well site only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-ZONING
Wording This property is Lot 7 of Cape George Village Division 7 recorded Volume 5 page 76 of Long Plats at the Jefferson County Auditor Office. This lot is designated a well site on the face of the plat. This property is designated Rural Residential 1 dwelling per 5 acres by the Jefferson County Comprehensive Plan adopted August 28, 1998.

Title: F-PERMITS
Wording A building permit (BLD 93-443) for a new well house was approved on the parcel on 6/29/93. A well was approved on the site on 3/28/95 through OTH 98-7.