Case Number:BLD2004-00557 Case Status:Finaled Date Received:9/1/2004
Description:3000 GAL A/G HEATING OIL TANK Date Issued:2/13/2005
Applicant: FORT FLAGLER STATE PARK Expiration Date:2/13/2006 12:00:00 AM
Site Address:10541 FLAGLER RD Case Finaled:2/6/2007
Parcel No:021174000 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Insp - FINAL FINAL Building
Date Completed: 2/6/2007
Disposition: DONE
Description: Insp - Final Building
Date Completed: 2/6/2007
Disposition: DONE
Description: Issue Install/Demo Permit (F)
Date Completed: 2/13/2005
Disposition:
Description: File Archived
Date Completed: 1/26/2006
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 2/24/2005
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 2/22/2005
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 2/22/2005
Disposition: DONE
Description: Review Complete-U
Date Completed: 2/22/2005
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 12/1/2004
Disposition: DONE
Description: Application Received-UF
Date Completed: 9/9/2004
Disposition: DONE
Description: PLAN CHK - Addt'l Info Request
Date Completed: 9/13/2004
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 9/2/2004
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 9/30/2004
Disposition: DONE
Description: Case Entered
Date Completed: 9/2/2004
Disposition:
Description: Plan Check
Date Completed: 9/13/2004
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 2/21/2005
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 10/7/2004
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 12/1/2004
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 12/1/2004
Disposition: DONE
Description: Consistency Review-U
Date Completed: 2/22/2005
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: C-STORMWATER
Wording The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements #1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-ESA'S
Wording The location of proposed heating oil tank is outside of any Environmentally Sensitive Area or its buffer and outside of shoreline jurisdiction.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on November 30, 2004 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Conservancy Shoreline Designation, Type 5 Stream, Eagle habitat, Wetlands, Rare Plants, Seismic Hazard, Levels 1 and 3 Landslide Hazard Areas.Erosion Hazard, Susceptible and Special Aquifer Recharge Protection Area, and Coastal Seawater Intrusion Protection Zone (SIPZ).

Title: F-Stormwater
Wording The applicant is proposing to create or add 160 square feet of impervious surface and 1,095 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal comply with Minimum Requirement #2 (Construction Stormwater Pollution Prevention) of the Department of Ecology Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(2)(g).

Title: F-Site Plan Changes
Wording The site plan as submitted with the building application on September 1, 2004 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated December 1, 2004 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-APPROVAL FOR TANK ONLY
Wording This approval is for a 3,000 gallon above ground heating oil tank only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.