Permit Case Summary

Case Number: Search Help

Case Number:BLD2003-00153 Case Status:Finaled Date Received:3/10/2003
Description:CELL TOWER REPLACEMENT Date Issued:4/16/2003
Applicant: CINGULAR WIRELESS Expiration Date:4/16/2005 12:00:00 AM
Site Address:1442 SHINE RIDGE RD Case Finaled:8/18/2003
Parcel No:821312001 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Miscellaneous Action
Date Completed: 1/12/2006
Disposition: DONE
Description: Final Building Inspection
Date Completed: 8/18/2003
Disposition: DONE
Description: Miscellaneous inspection
Date Completed: 6/20/2003
Disposition: DONE
Description: Foundation Inspection
Date Completed: 5/27/2003
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 5/27/2003
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 4/16/2003
Disposition: DONE
Description: Final Planning Appr
Date Completed: 8/15/2003
Disposition: DONE
Description: Review Complete-U
Date Completed: 4/15/2003
Disposition:
Description: Approve Permit-UF
Date Completed: 4/15/2003
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 3/21/2003
Disposition: DONE
Description: Application Received-UF
Date Completed: 3/14/2003
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 3/21/2003
Disposition: DONE
Description: Case Entered
Date Completed: 3/12/2003
Disposition:
Description: Plan Check
Date Completed: 3/28/2003
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 4/15/2003
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 3/21/2003
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 3/21/2003
Disposition: DONE
Description: Consistency Review-U
Date Completed: 3/21/2003
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 3/12/2003
Disposition: DONE
Description: DRD Approval (Zoning)
Date Completed: 3/21/2003
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 3/12/2003
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: TF-Paint Standards
Wording Prior to issuance of a building permit, the applicant shall provide information related to the color(s), the paint reflective qualities, and the proposed paint patterns for the attached antennas and equipment enclosure for review and approval by staff.

Title: TF-Noise
Wording Noise generated by the wireless telecommunication facility shall not exceed the maximum environmental noise levels established in Chapter 173-60, Washington Administrative Code, as it is now in effect or in effect or hereafter amended. In the event the applicant adds an emergency generator in the future, the applicant shall notify Jefferson County and provide noise generation data for the installed generator. All noise emitting equipment that cannot in any way operate below the maximum permitted noise level shall be housed in a sound-attenuating structure, unless otherwise stipulated in the project approval. The applicant may be required to submit sound attenuation plans for review and approval by the department.

Title: TF-Lighting
Wording Security lighting for the equipment enclosure shall be minimized. Any newly installed security lighting shall be oriented downward and shielded so that light falls only within the boundaries of the property and shall be triggered only by a motion sensor.

Title: TF-FAA Lighting
Wording If the FAA requires that lighting be placed at the top of the new communication facility tower, the applicant shall provide documentation from the FAA verifying that the tower will be required to be lit.

Title: TF-Maintenance
Wording The applicant shall protect the facility from unauthorized access consistent with the purpose of protecting the public health, safety and welfare. The applicant shall maintain the facility in a good and safe condition and preserve its original appearance and concealment or camouflage elements incorporated into the design at the time of approval. Maintenance shall include, but not be limited to, such items as painting, structural repair, repair of equipment and maintenance of landscaping.

Title: TF-Expenses
Wording The applicant shall be responsible for all direct and indirect expenses incurred related to review and compliance with conditions of approval. All fees shall be as authorized by County Ordinance.

Title: TF-Emergency Response
Wording Prior to operation of the telecommunication facilities, the applicant shall document that the system has been integrated into the County's Emergency Response System as required by Section 18.42.050. The applicant shall officially certify that they have the capacity to meet FCC mandate that all the industry must be able to locate a wireless telephone when it dials 911.

Title: TF-Other Requirements
Wording Construction of the wireless telecommunication facilities is subject to the requirements of the County Building Code, Chapter 15.05 JCC, and all Building Code (UBC), the Electrical Code (NEC), the requirements of the National Electronics Industries Association/Telecommunications Industries Association (EIA/TIA) 222 Revision F Standard entitled "Structural Standards for Steel Antenna Supporting Structures" and any additional applicable standards published by the Electronics Industries Association, the Uniform Fire Code and the Jefferson County Critical Areas Ordinance.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on March 21, 2003 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: There are techically no ESAs in close proximity to the cell tower site. The following ESAs were indenified in county GIS mapping: Type 5 stream about 1/2 mile west of wireless facility; Fish and Wildlife Area located NW and SE of the proposal site; Wetland area approx. 1/2 mile west of the proposal site; Rare Plants located about 3/4 mile of the proposal site; Seismic Area located in the same area as the wetland; Slight Landslide Hazard Area to the east; and Susceptible Aquifer Recharge Area approx. 1/4 mile east of the proposal site .

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-Geohazard Area
Wording Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.

Title: F-Streams
Wording A Type 5 Stream has been identified approximately 1/2 mile west of the subject property. The stream will require a setback of zero feet. The setback shall be measured horizontally from the Ordinary High Water Mark (OHWM). Fish and Wildlife Habitat Areas shall also have Buffers and Building Setbacks established.

Title: F-Wetland Delineation Waiver
Wording The project components are more than 250' from the mapped/identified wetland. The requirement for a wetland delineation and report is waived based on maintenance of a 225' buffer from the wetland per UDC Table 3-3.

Title: F-Stormwater
Wording The applicant is proposing to create or add 2000 square feet of impervious surface and 2000 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a Stormwater Calculation Sheet. The applicant submitted a calculation sheet.

Title: F-DNS Issued
Wording Reviewed under the State Environmental Policy Act (SEPA) by Jefferson County acting as lead agency. Determination of Non-Significance (DNS) issued on August 31, 1999, which is hereby adopted by reference.

Title: F-Site Plan Changes
Wording The site plan as submitted with the building permit application on March 10, 2003 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated March 10, 2003 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-APPROVAL FOR TOWER ONLY
Wording This approval is for a 200-foot CELL TOWER REPLACEMENT only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F- GEOTECH REVIEW
Wording A geotechnical report was not required or submitted for the cell tower replacement building permit.

Title: F-DENSITY
Wording The parcel is a legal conforming parcel that is designated as Commercial Forest (CF-80) under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998.